CN201493987U - Checking device for mould ejection device - Google Patents
Checking device for mould ejection device Download PDFInfo
- Publication number
- CN201493987U CN201493987U CN2009202351596U CN200920235159U CN201493987U CN 201493987 U CN201493987 U CN 201493987U CN 2009202351596 U CN2009202351596 U CN 2009202351596U CN 200920235159 U CN200920235159 U CN 200920235159U CN 201493987 U CN201493987 U CN 201493987U
- Authority
- CN
- China
- Prior art keywords
- mould
- crane
- utility
- attachment
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Moulds For Moulding Plastics Or The Like (AREA)
Abstract
The utility model discloses a checking device for a mould ejection device. The mould ejection device comprises a mould foot and a plurality of ejector pins arranged thereon; and a mould comprises a plurality of holes matched with the ejector pins. The checking device is characterized in that a working table and a lifting frame capable of vertically moving relative to the working table are included; the mould is erected on the working table; the mould foot is arranged on the lifting frame; and when the lifting frame is vertically moved, the ejector pins pass upward through or are separated from the holes on the mould. Since the mould and the mould ejection device are checked before installed, the checking device saves a lot of manpower and working hours, and has the characteristics of simple structure and convenient operation.
Description
Technical field
The utility model relates to a kind of die device, especially a kind of verifying attachment that is used for mold liftout attachment.
Background technology
At present, mould comprises A mould and B mould, is provided with die cavity between A mould and the B mould, and workpiece is casting in die cavity.Behind the Workpiece shaping,, at first remove the A mould usually, utilize mold liftout attachment will cast good workpiece then and from the B mould, separate for workpiece and mold separation.Mold liftout attachment comprises mould pin and thimble, and thimble passes the hole of reserving in the B mould, directly contacts with workpiece, by the action that ejects of mould pin, thereby workpiece is separated with the B mould.The thimble quantity of mold liftout attachment is more, and corresponding hole is also many in the B mould.If therefore after installation, find the malposition in the hole of thimble and correspondence, when thimble can not correctly pass, must the dismounting refitting.Whole process can be wasted a large amount of artificial and man-hours.
The utility model content
The utility model has solved an above-mentioned difficult problem, provides a kind of before mould and mold liftout attachment are installed to lathe, the verifying attachment that they are tested, thus avoided being installed to the situation of dismounting again of pinpointing the problems behind the lathe.
The technical solution of the utility model provides a kind of verifying attachment that is used for mold liftout attachment, described mold liftout attachment comprises the mould pin, be arranged on many thimbles on the described mould pin, described mould comprises a plurality of holes that can cooperate with described thimble, it is characterized in that: described mould ejects verifying attachment and comprises workbench, the crane that can move up and down with respect to described workbench, described die frame is located on the described workbench, described mould pin is arranged on the described crane, when described crane moved up and down, described thimble was upward through or breaks away from hole on the described mould.
The verifying attachment that is used for mold liftout attachment of the present utility model, owing to before mould and mold liftout attachment installation, mould and mold liftout attachment are tested, not only saved great amount of manpower and man-hour, but also have simple in structure, convenience operation.
Description of drawings
Fig. 1 is the structural representation of the verifying attachment that is used for mold liftout attachment of the utility model preferred embodiment, and wherein crane 8 is in test position;
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described in further detail.
As shown in Figure 1, the verifying attachment that is used for mold liftout attachment of the utility model preferred embodiment comprises workbench 6 and crane 8.Mould comprises A mould (not shown), B mould 12.Mold liftout attachment comprises mould pin 11, and is arranged on the many thimbles 14 on the mould pin 11.Crane 8 can move up and down under the effect of external power in vertical direction.Mould pin 11 is placed on the crane 8, can and crane 8 between test position and clear position, move together.B mould 12 is erected at the top that is located at mould pin 11 on the workbench 6, and when mould pin 11 moved to test position, B mould 12 just in time matched with mould pin 10.
When the verifying attachment that is used for mold liftout attachment of the present utility model is worked, crane 8 drives mould pin 11 and moves, arrive test position, if all thimbles 14 can both pass in the B mould 12 corresponding Kong Ze and showed mould pin 11 and B mould 12 no-floats this moment, otherwise then show and to mate, need redress mould.
Above embodiment only is the utility model a kind of embodiment wherein, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the utility model claim.Should be pointed out that for the person of ordinary skill of the art under the prerequisite that does not break away from the utility model design, can also make some distortion and improvement, these all belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be as the criterion with claims.
Claims (1)
1. verifying attachment that is used for mold liftout attachment, described mold liftout attachment comprises the mould pin, be arranged on many thimbles on the described mould pin, described mould comprises a plurality of holes that can cooperate with described thimble, it is characterized in that: described mould ejects verifying attachment and comprises workbench, the crane that can move up and down with respect to described workbench, described die frame is located on the described workbench, described mould pin is arranged on the described crane, when described crane moved up and down, described thimble was upward through or breaks away from hole on the described mould.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202351596U CN201493987U (en) | 2009-08-07 | 2009-08-07 | Checking device for mould ejection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202351596U CN201493987U (en) | 2009-08-07 | 2009-08-07 | Checking device for mould ejection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201493987U true CN201493987U (en) | 2010-06-02 |
Family
ID=42437195
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202351596U Expired - Fee Related CN201493987U (en) | 2009-08-07 | 2009-08-07 | Checking device for mould ejection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201493987U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112378306A (en) * | 2020-10-21 | 2021-02-19 | 安徽钢腾塑胶模具科技有限公司 | Inspection device for mold ejection device |
-
2009
- 2009-08-07 CN CN2009202351596U patent/CN201493987U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112378306A (en) * | 2020-10-21 | 2021-02-19 | 安徽钢腾塑胶模具科技有限公司 | Inspection device for mold ejection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201752919U (en) | Injection mold secondary ejection mechanism | |
CN205945434U (en) | DC motor stator assembly quality | |
CN103170536B (en) | A kind of automatic stamping mould | |
CN204584074U (en) | Dead bolt assembly machine | |
CN201493987U (en) | Checking device for mould ejection device | |
CN202861255U (en) | Material ejecting device for mold | |
CN205522245U (en) | Quick installing the system of injection molding machine mould | |
CN207724765U (en) | It is easy to the ejecting mechanism of demoulding | |
CN213704502U (en) | Bottom plug translation mechanism of blow molding mold | |
CN203542808U (en) | Strongly-magnetic connecting device for steel template | |
CN201493986U (en) | Mould secondary ejection device for mould | |
CN205997292U (en) | For being molded the mechanical hand of machine production line | |
CN105033099A (en) | Multifunctional integrated device for vehicle roof | |
CN202196980U (en) | Automatic commutator high speed positive assembling machine | |
CN207816320U (en) | Diel testing agency and diel detecting system | |
CN102873838B (en) | Angle ejector rod with stress step | |
CN2873474Y (en) | Protective device | |
CN202846830U (en) | Angle ejector rod provided with stressed step | |
CN205798387U (en) | A kind of compression mod mould bases of compact conformation | |
CN202894067U (en) | Edge-folding mould for filter cover plates | |
CN201060102Y (en) | Engine test bench | |
CN201856034U (en) | Compound oblique insertion assembly welding machine | |
CN205324444U (en) | Pipe side opening make -up machine | |
CN203330354U (en) | Novel sand core with positioning detection structure | |
CN209478781U (en) | A kind of sound equipment mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |