CN201487380U - Walkable vibration pipe towing device - Google Patents

Walkable vibration pipe towing device Download PDF

Info

Publication number
CN201487380U
CN201487380U CN2009201929522U CN200920192952U CN201487380U CN 201487380 U CN201487380 U CN 201487380U CN 2009201929522 U CN2009201929522 U CN 2009201929522U CN 200920192952 U CN200920192952 U CN 200920192952U CN 201487380 U CN201487380 U CN 201487380U
Authority
CN
China
Prior art keywords
support arm
vibration
main body
body rack
interlock support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201929522U
Other languages
Chinese (zh)
Inventor
殷兴
殷志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201929522U priority Critical patent/CN201487380U/en
Application granted granted Critical
Publication of CN201487380U publication Critical patent/CN201487380U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a walkable vibration pipe towing device which comprises a main bracket, a drive wheel and a driven wheel, wherein the drive wheel and the driven wheel are arranged under the main bracket; a hydraulic vibrating motor and a hydraulic cylinder are also arranged in the main bracket, and a moving piston is arranged on the hydraulic cylinder; the side surface of the main bracket is provided with at least two groups of linkage support arm mechanisms, each group of linkage support arm mechanisms comprises a connecting rod and two linkage support arms which are movably articulated at both ends of the connecting rod, and a vibrating sheet is arranged on each linkage support arm; the tail ends of the two linkage support arms which are positioned at the same side of the hydraulic cylinder in the two groups of linkage support arm mechanisms are both butted on the piston. The pipe towing device can reduce the towing resistance of a pipe section so as to successfully tow in special condition, such as failure, and the like.

Description

Can walk and vibrate the hauling pipe device
Technical field
The utility model belongs to pipeline and uses the field, is specifically related to a kind ofly utilize vibrating motor to reduce pipeline section to return the walked vibration hauling pipe device that drags resistance.
Background technique
Along with technological progress, run into the river in the pipeline construction, highway, the construction of directional drilling row is all adopted in railway and the location that is not suitable for excavating, and can reduce cost like this, in advance the duration, reduces its damage to building and environment.
Directed boring is a kind of excessive risk, the technology of high repayment.If to survey data inaccurate, the reaming operation is lack of standardization, the reaming moulding is not up to standard, returns and drags resistance to increase, drilling rod breaks, and returns and drags the universal joint fault, all can return at pipeline and drag in the process, breaks down, and falls short of success for lack of final effort.Some pipeline section outer arm is used the sheave block that can produce the 600T pulling force to return to drag all and is not stirred a finger by the absorption of silt parcel, and the resistance that is produced in the time of can thinking pipeline section by the absorption of silt parcel is big.In Pipeline Construction on Site, the phenomenon that has many pipelines to pass through failure occurs.The direct economic loss that each accident causes is up to units up to a million, and indirect loss is inestimable especially in addition.
Summary of the invention
At the problem that exists in the above-mentioned background technology, the utility model provides a kind of silt of being adsorbed on the tube wall of parcel that makes to become loose, subdues resistance, returns the walked vibration hauling pipe device that drags when special circumstances such as conveniently breaking down smoothly.
The technical solution adopted in the utility model is as follows: a kind of vibration hauling pipe device of walking comprises main body rack and the driving wheel and the follower that are arranged on the main body rack below.Also be provided with hydraulic vibration motor and oil hydraulic cylinder in the main body rack, oil hydraulic cylinder is provided with mobile piston; The main body rack side is provided with at least two groups interlock support arm mechanism, and every group of interlock support arm mechanism comprises connecting rod and two interlock support arms that are movably articulated in the connecting rod two ends, and each interlock support arm is provided with vibrating reed; Two interlock support arm ends that are positioned at the oil hydraulic cylinder homonymy in two groups of interlock support arm mechanisms are all to being located on the piston.
The vibration hauling pipe device of walking of the present utility model also is provided with the driving oil hydraulic motor on the main body rack.
The vibration hauling pipe device of walking of the present utility model, the vibrating reed of interlock support arm is provided with rubber pad.
The vibration hauling pipe device of walking of the present utility model, the two ends of main body rack are provided with draw-barring.
The utlity model has following beneficial effect: driving wheel makes vibration hauling pipe device enter the pipeline section appointed part.The fluid pressure linkage support arm closely contacts work with tube wall, and the vibration force that vibrating motor produces is passed to the tube wall section, makes to be enclosed in the silt slippage on every side of tube wall section, becomes more loose.So can reduce back the resistance that need overcome when dragging, the elevator function is hauled out from pipeline section smoothly, carry out the operation of follow-up engineering.
Description of drawings
Fig. 1 is the structural representation of the utility model vibration hauling pipe device;
Fig. 2 is the right elevation of Fig. 1.
Embodiment
As shown in the figure, a kind of walked vibration hauling pipe device that is placed in the under ground piping A comprises main body rack 1, and main body rack 1 below is provided with driving wheel 61 and follower 62.Be provided with the oil hydraulic motor 5 that is used to drive driving wheel 61 in the main body rack 1, oil hydraulic motor 5 links to each other with driving wheel 61 by gear 7.Also be provided with hydraulic vibration motor 4 and oil hydraulic cylinder 3 in the main body rack 1, oil hydraulic cylinder 3 is provided with mobile piston 3.The side of main body rack 1 is provided with two groups of interlock support arm mechanisms, every group of interlock support arm mechanism comprises connecting rod 22 and two interlock support arms 2 that are movably articulated in connecting rod 22 two ends, each interlock support arm 2 is provided with vibrating reed 21, and vibrating reed 21 is provided with rubber pad 9.In two groups of interlock support arm mechanisms two are positioned at the end of two interlock support arms of oil hydraulic cylinder 3 the same sides all to being located on the piston 31.
The two ends of main body rack 1 are provided with draw-barring 8, can carry out spacing to a plurality of vibration hauling pipe machines of walking by draw-barring 8 and connect firmly, make whole pipeline section produce vibration, thereby reach good hauling pipe effect.
During use, when orientation bore back drag failure after, the utility model vibration hauling pipe machine of can walking is put into the pipeline that is exposed at ground one end, at first primer fluid pressure motor 5 drives driving wheels 61 and follower 62 makes machinery enter appointed positions in the pipeline.Make piston 31 promote interlock support arms 2 at primer fluid cylinder pressure 3 and make several rubber pads 9 be adjacent to tube wall, rubber pad 9 is not damage tube wall in order to vibrate.This moment, main body rack hanged, and promptly driving wheel 61 and follower 62 leave tube wall.Restart hydraulic vibration motor 4 and make it to produce the sharp power of shaking, by the supporting arm 2 that links the sharp power of shaking that produces is delivered to pipeline section, the silt that parcel is adsorbed on outside the tube wall is loose, reduces resistance.According to the caliber size, pipeline length can be undertaken spacing to a plurality of vibration hauling pipe devices of walking by draw-barring 8 and be connected firmly, makes whole pipeline section produce vibration, thereby reaches good hauling pipe effect.Be exposed at the tube head of ground one end again by winch and sheave block traction, make pipeline tow back to ground smoothly, reorganize the crossing construction operation.

Claims (4)

1. the vibration hauling pipe device of can walking comprises main body rack and the driving wheel and the follower that are arranged on the main body rack below, and it is characterized in that: also be provided with hydraulic vibration motor and oil hydraulic cylinder in the main body rack, oil hydraulic cylinder is provided with mobile piston; The main body rack side is provided with at least two groups interlock support arm mechanism, and every group of interlock support arm mechanism comprises connecting rod and two interlock support arms that are movably articulated in the connecting rod two ends, and each interlock support arm is provided with vibrating reed; Two interlock support arm ends that are positioned at the oil hydraulic cylinder homonymy in two groups of interlock support arm mechanisms are all to being located on the piston.
2. the vibration hauling pipe device of walking as claimed in claim 1 is characterized in that: also be provided with the driving oil hydraulic motor on the main body rack.
3. the vibration hauling pipe device of walking as claimed in claim 1 or 2, it is characterized in that: the vibrating reed of interlock support arm is provided with rubber pad.
4. the vibration hauling pipe device of walking as claimed in claim 1 or 2, it is characterized in that: the two ends of main body rack are provided with draw-barring.
CN2009201929522U 2009-09-03 2009-09-03 Walkable vibration pipe towing device Expired - Fee Related CN201487380U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201929522U CN201487380U (en) 2009-09-03 2009-09-03 Walkable vibration pipe towing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201929522U CN201487380U (en) 2009-09-03 2009-09-03 Walkable vibration pipe towing device

Publications (1)

Publication Number Publication Date
CN201487380U true CN201487380U (en) 2010-05-26

Family

ID=42426259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201929522U Expired - Fee Related CN201487380U (en) 2009-09-03 2009-09-03 Walkable vibration pipe towing device

Country Status (1)

Country Link
CN (1) CN201487380U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106481883A (en) * 2016-11-17 2017-03-08 浙江海洋大学 Ship laid by a kind of off-shore pipeline
CN106481882A (en) * 2016-11-17 2017-03-08 浙江海洋大学 A kind of off-shore pipeline laying apparatus and laying method
CN106481884A (en) * 2016-11-17 2017-03-08 浙江海洋大学 A kind of Multifunctional marine pipe installation ship
CN106499874A (en) * 2016-11-17 2017-03-15 浙江海洋大学 A kind of off-shore pipeline body transfers control device
CN106764062A (en) * 2016-11-17 2017-05-31 浙江海洋大学 A kind of underwater pipeline lays servicing unit
CN113898785A (en) * 2021-10-22 2022-01-07 安徽两淮建设有限责任公司 Horizontal directional drilling pipeline back-dragging linear counterweight device and back-dragging construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106481883A (en) * 2016-11-17 2017-03-08 浙江海洋大学 Ship laid by a kind of off-shore pipeline
CN106481882A (en) * 2016-11-17 2017-03-08 浙江海洋大学 A kind of off-shore pipeline laying apparatus and laying method
CN106481884A (en) * 2016-11-17 2017-03-08 浙江海洋大学 A kind of Multifunctional marine pipe installation ship
CN106499874A (en) * 2016-11-17 2017-03-15 浙江海洋大学 A kind of off-shore pipeline body transfers control device
CN106764062A (en) * 2016-11-17 2017-05-31 浙江海洋大学 A kind of underwater pipeline lays servicing unit
CN106764062B (en) * 2016-11-17 2018-10-12 浙江海洋大学 A kind of underwater pipeline laying auxiliary device
CN113898785A (en) * 2021-10-22 2022-01-07 安徽两淮建设有限责任公司 Horizontal directional drilling pipeline back-dragging linear counterweight device and back-dragging construction method

Similar Documents

Publication Publication Date Title
CN201487380U (en) Walkable vibration pipe towing device
CN206512995U (en) Hydraulic pressure driving-type finisher
CN103015893B (en) Non-excavation horizontal directional drilling machine
CN201310342Y (en) Continuous-tube well logging machine
CN103247976A (en) Cable drawing mechanism for cable filling device
CN102633136A (en) Automatic spiral train leveling device for train
CN102322056A (en) Super-large-torque spiral hole-boring and pile-pouring machine
CN103574159B (en) A kind of pipeline pusher
CN203947476U (en) Pipe rubbing machine is combined construction equipment with engineering machinery
CN103922152A (en) Material fetching device with material rake structures
CN203549112U (en) Pipeline boosting device in pipeline laying
CN203614033U (en) Crawler-type deep hole hydraulic cutting drill machine
CN202467646U (en) Spiral piling machine
CN205277490U (en) A draw and move device for elevating conveyor
CN101769126B (en) Hydraulic middle-drive retractable multi-spindle drilling and stirring device
CN103241683A (en) Rail type pipe lifting device of lower pipes of balancing weight production line of marine pipeline
CN102493765A (en) Spiral hammer
CN204646089U (en) Rotary drilling rig
CN201295713Y (en) An I-steel straightener
CN202542510U (en) Train screw automatic wagon flatting device
CN202346715U (en) Integral fast translation device for electric drilling machine
CN201843509U (en) Quick power head lifting device and vehicle-mounted drill using same
CN202165012U (en) Drilling device
CN2854056Y (en) Hydraulic rotation cathead
CN203223169U (en) Rotary pile drilling rig

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100526

Termination date: 20120903