CN201474702U - 热力盾构隧道热力管道固定传力支架 - Google Patents
热力盾构隧道热力管道固定传力支架 Download PDFInfo
- Publication number
- CN201474702U CN201474702U CN2009203074213U CN200920307421U CN201474702U CN 201474702 U CN201474702 U CN 201474702U CN 2009203074213 U CN2009203074213 U CN 2009203074213U CN 200920307421 U CN200920307421 U CN 200920307421U CN 201474702 U CN201474702 U CN 201474702U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- thermodynamic
- shield tunnel
- force transfer
- fixing force
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
一种热力盾构隧道热力管道固定传力支架,间隔分布于隧道内壁,隧道由预制管片组合而成,所述隧道内壁由双拱形固定件固定两圈环梁,两圈环梁之间固定有两根或四根立柱,每根立柱的两端支撑在隧道内壁两侧,每两根立柱的前后两侧各连接有一个用于穿过热力管道的受力框架。本实用新型解决了热力盾构隧道中热力管道的固定问题,使热力管道能够承受管道轴向和侧向的水平推拉力。在水平推力作用下,固定支架系统可以均匀地将水平推力传递到6个管片。管片在外力作用下均匀移动,同时使管片间不产生相对位移。
Description
技术领域
本实用新型涉及一种热力管道的定位装置。
背景技术
在热力供暖运行过程中,沿热力管道轴向(X轴向)和侧向产生(Y轴向)会产生水平推力,X向水平推力设计值为800KN,Y向力设计值为500KN,所以必须采用管道固定传力支架来承受热力管道X和Y向的水平推力。传统热力浅埋暗挖隧道是先施工热力管道支架再灌注隧道的二次衬砌结构,这种传统的支架很容易固定在隧道的二次衬砌结构中。但是,在热力盾构隧道热力管道的施工工艺中,热力盾构隧道施工完毕后,无二次衬砌结构,因此,热力管道与隧道之间的固定就成为新的技术难题。
实用新型内容
本实用新型提供一种热力盾构隧道热力管道固定传力支架,要解决热力盾构隧道中热力管道的固定问题。
本实用新型解决其技术问题所采用的技术方案是:
这种热力盾构隧道热力管道固定传力支架,间隔分布于隧道内壁,隧道由预制管片组合而成,所述隧道内壁由双拱形固定件固定两圈环梁,两圈环梁之间固定有两根或四根立柱,每根立柱的两端支撑在隧道内壁两侧,每两根立柱的前后两侧各连接有一个用于穿过热力管道的受力框架。
所述受力框架由两片方形框体,以及方形框体之间的连杆构成,方形框体的两侧边分别焊接在两立柱侧面。
所述位于中部的两立柱在受力框架上下两侧带有两个固定卡环。
所述环梁由双拱形固定件及螺栓与预制管片内壁固定。
所述双拱形固定件与环梁以及预制管片之间有硫化硅胶垫层。
本实用新型的有益效果如下:
与传统热力浅埋暗挖隧道比较,热力盾构隧道是先施工隧道管片然后施工固定支架,可以保证热力管道的稳固定位。本实用新型解决了热力盾构隧道中热力管道的固定问题,使热力管道能够承受管道轴向和侧向的水平推拉力。在水平推力作用下,固定支架系统可以均匀地将水平推力传递到预制管片。预制管片在外力作用下均匀移动,同时使预制管片间不产生相对位移。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是本实用新型横截面的结构示意图。
图2是图1B-B剖面的结构示意图。
图3是图1A-A剖面的结构示意图。
图4是受力框架的结构示意图。
图5是环梁横截面的结构示意图。
图6是固定件、环梁、预制管片连接的结构示意图。
图7是本实用新型的立体结构示意图。
附图标记:1-预制管片、2-环梁、3-固定件、4-立柱、5-受力框架、6-固定卡环、7-螺栓、8-硫化硅胶垫层。
具体实施方式
实施例参见图1-3所示,这种热力盾构隧道热力管道固定传力支架,间隔分布于隧道内壁,隧道由6个预制管片1组合而成,预制管片组成,长1200mm,所述隧道内壁由双拱形固定件3固定两圈环梁2,两圈环梁之间固定有两根或四根立柱4,每根立柱4的两端支撑在隧道内壁两侧,每两根立柱的前后两侧各连接有一个用于穿过热力管道的受力框架5。
钢立柱的尺寸是400×400×20(mm)。钢立柱的材料是Q235钢材。
参见图3-4所示,受力框架5由两片方形框体,以及方形框体之间的连杆构成,方形框体的两侧边分别焊接在两立柱侧面。
参见图5所示,环梁的横截面可以为矩形。环梁尺寸:200×100×10(mm)。环梁的材料是铸钢ZG200-400。
参见图6所示,所述环梁由双拱形固定件3及螺栓7与预制管片内壁固定。所述双拱形固定件3与环梁以及预制管片之间垫有硫化硅胶垫层8。固定件尺寸:200×1200×10(mm)。固定件材料是铸钢ZG200-400。
参见图7所示,两圈环梁之间固定有两根立柱4,立柱的两端支撑在隧道内壁两侧,每两根立柱的前后两侧各连接有一个用于穿过热力管道的受力框架5,两立柱4在受力框架上下两侧带有两个固定卡环6,热力管道穿过受力框架而定位。
Claims (5)
1.一种热力盾构隧道热力管道固定传力支架,间隔分布于隧道内壁,隧道由预制管片(1)组合而成,其特征在于:所述隧道内壁由双拱形固定件(3)固定两圈环梁(2),两圈环梁之间固定有两根或四根立柱(4),每根立柱(4)的两端支撑在隧道内壁两侧,每两根立柱的前后两侧各连接有一个用于穿过热力管道的受力框架(5)。
2.根据权利要求1所述的热力盾构隧道热力管道固定传力支架,其特征在于:所述受力框架(5)由两片方形框体,以及方形框体之间的连杆构成,方形框体的两侧边分别焊接在两立柱侧面。
3.根据权利要求1所述的热力盾构隧道热力管道固定传力支架,其特征在于:所述位于中部的两立柱(4)在受力框架上下两侧带有两个固定卡环(6)。
4.根据权利要求1所述的热力盾构隧道热力管道固定传力支架,其特征在于:所述环梁由双拱形固定件(3)及螺栓(7)与预制管片内壁固定。
5.根据权利要求1所述的热力盾构隧道热力管道固定传力支架,其特征在于:所述双拱形固定件(3)与环梁以及预制管片之间有硫化硅胶垫层(8)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009203074213U CN201474702U (zh) | 2009-08-05 | 2009-08-05 | 热力盾构隧道热力管道固定传力支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009203074213U CN201474702U (zh) | 2009-08-05 | 2009-08-05 | 热力盾构隧道热力管道固定传力支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201474702U true CN201474702U (zh) | 2010-05-19 |
Family
ID=42410950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009203074213U Expired - Fee Related CN201474702U (zh) | 2009-08-05 | 2009-08-05 | 热力盾构隧道热力管道固定传力支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201474702U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101614304B (zh) * | 2009-08-05 | 2011-01-12 | 北京市政建设集团有限责任公司 | 热力盾构隧道热力管道固定传力支架 |
CN104033161A (zh) * | 2014-07-03 | 2014-09-10 | 北京特泽热力工程设计有限责任公司 | 一种热力盾构隧道固定支架 |
CN104033162A (zh) * | 2014-07-03 | 2014-09-10 | 北京特泽热力工程设计有限责任公司 | 一种热力盾构隧道导向支架 |
-
2009
- 2009-08-05 CN CN2009203074213U patent/CN201474702U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101614304B (zh) * | 2009-08-05 | 2011-01-12 | 北京市政建设集团有限责任公司 | 热力盾构隧道热力管道固定传力支架 |
CN104033161A (zh) * | 2014-07-03 | 2014-09-10 | 北京特泽热力工程设计有限责任公司 | 一种热力盾构隧道固定支架 |
CN104033162A (zh) * | 2014-07-03 | 2014-09-10 | 北京特泽热力工程设计有限责任公司 | 一种热力盾构隧道导向支架 |
CN104033162B (zh) * | 2014-07-03 | 2016-04-20 | 北京特泽热力工程设计有限责任公司 | 一种热力盾构隧道导向支架 |
CN104033161B (zh) * | 2014-07-03 | 2016-04-20 | 北京特泽热力工程设计有限责任公司 | 一种热力盾构隧道固定支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207919899U (zh) | 一种钢管混凝土柱法兰套筒连接机构 | |
CN101614304B (zh) | 热力盾构隧道热力管道固定传力支架 | |
CN108412128A (zh) | 一种钢管混凝土柱的连接结构 | |
CN201474702U (zh) | 热力盾构隧道热力管道固定传力支架 | |
CN102425237A (zh) | 现场装配式外伸臂组合节点 | |
CN103291065A (zh) | 一种装配式混凝土用支撑装置及吊装定位方法 | |
CN102704596A (zh) | 型钢叠合柱间嵌钢板密梁外包混凝土组合剪力墙及其作法 | |
CN111270763A (zh) | 一种具有连接节点的装配式混凝土框架结构梁柱 | |
CN108915768B (zh) | 热力盾构隧道内热力管道固定传力支架系统 | |
CN203546618U (zh) | 一种桥梁现浇混凝土模板八字支撑架 | |
CN202482766U (zh) | 大跨度连续梁施工支架结构 | |
CN212026270U (zh) | 一种基坑装配式h型钢支撑体系 | |
CN210439163U (zh) | 一种适用于连续梁可拆装斜拉托梁支撑结构 | |
CN210395840U (zh) | 一种带凹槽的预制剪力墙 | |
CN210530875U (zh) | 一种非对称小净距隧道的支护结构 | |
CN210712909U (zh) | 一种可周转钢格构柱塔吊基础结构 | |
CN204000936U (zh) | 基于扣件式钢管地锚桁架的地下室外墙单面支模体系 | |
CN103397638A (zh) | 高刚度整体预应力装配式基坑支护内支撑系统用的拉杆 | |
CN103628568B (zh) | 一种网壳结构用的球铰支撑架的排布方式 | |
CN202945846U (zh) | 大直径无内支撑锥顶罐锥顶结构 | |
CN111980052A (zh) | 一种电力施工桩基结构 | |
CN206859260U (zh) | 管廊抗大推力支架结构 | |
CN218621769U (zh) | 空间线形拱肋在拱脚位置处的快调精确定位连接结构 | |
CN110761405A (zh) | 一种方钢连接柱与方钢管梁的贯通螺栓装配结构 | |
CN104612030A (zh) | 小跨径的钢混复合桥梁板及其施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100519 Termination date: 20100805 |