CN201473600U - Layout structure of rectification station in electrolytic aluminum plant - Google Patents

Layout structure of rectification station in electrolytic aluminum plant Download PDF

Info

Publication number
CN201473600U
CN201473600U CN2009203023669U CN200920302366U CN201473600U CN 201473600 U CN201473600 U CN 201473600U CN 2009203023669 U CN2009203023669 U CN 2009203023669U CN 200920302366 U CN200920302366 U CN 200920302366U CN 201473600 U CN201473600 U CN 201473600U
Authority
CN
China
Prior art keywords
station
rectifier
rectification station
rectification
electrolytic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203023669U
Other languages
Chinese (zh)
Inventor
邓少强
胡向全
杨世勇
李红钧
舒茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2009203023669U priority Critical patent/CN201473600U/en
Application granted granted Critical
Publication of CN201473600U publication Critical patent/CN201473600U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The utility model discloses a layout structure of a rectification station in an electrolytic aluminum plant, comprising an electrolytic workshop (7), the other end of the electrolytic workshop (7) is provided with the rectification station (1), and the inside of the rectification station (1) is provided with a wave filtering device (6), a rectifier device room (5), a 220kV switching station (2), and a 220kV wire inlet device (3) and an outgoing feeder device (4); the wave filtering device (6) is arranged at the roof of the rectifier device room (5), and the 220kV wire inlet device (3) and the outgoing feeder device (4) are arranged at the same side of the 220kV switching station (2). The layout structure leads the length of the rectification station to be only 105 m; compared with the existing rectification station, the length of the rectification station provided by the utility model is shortened by 42.5 m, and the occupied area of the rectification station is decreased by about 12,000 m <2>; in the same range of occupied area, more plant lengths in the electrolytic workshop are provided for configurating more electrolyzers, therefore, the electrolytic aluminum production capacity is increased.

Description

A kind of electrolytic aluminium factory rectifier arrangement
Technical field
The utility model relates to a kind of rectifier arrangement, particularly a kind of electrolytic aluminium factory rectifier arrangement.
Background technology
Electrolytic aluminium factory will improve production capacity as far as possible in limited land use area, should shorten as far as possible rectifier with the length of potroom length direction, reduce the floor space of rectifier, dispose more electrolyzers with lengthening potroom factory building length.Existing electrolytic aluminium factory rectifier arrangement 220KV electric power incoming line equipment and outgoing equipment as shown in Figure 2 is configured in the both sides up and down of 220KV switching station, filter is installed on ground, this arrangement rectifier with the equidirectional 147.5m that needs of potroom length direction, floor space is big, is unfavorable for improving the electrolytic aluminum production capacity in limited land use area.
The utility model content
Technical problem to be solved in the utility model provides a kind of electrolytic aluminium factory rectifier arrangement that improves the electrolytic aluminum production capacity in same floor space scope, can overcome the deficiencies in the prior art.
The technical solution of the utility model is: it comprises potroom, and the potroom the other end is provided with rectifier, is provided with filter in the rectifier, the rectifying device chamber, the 220KV switching station, 220KV inlet wire equipment and outgoing equipment, filter are arranged on roof, rectifying device chamber.
220KV inlet wire equipment is located at 220KV switching station the same side mutually with outgoing equipment.
Compared with prior art, 220KV inlet wire equipment and outgoing equipment are configured in 220KV switching station the same side mutually, the former filter that is configured in ground is moved to the rectifier chamber roof, this arrangement makes the length of rectifier only be 105m, than existing rectifier contraction in length 42.5m, the rectifier floor space reduces about 12000m 2, in same floor space scope, make potroom that the more electrolyzers of more factory building length configuration be arranged, improved the electrolytic aluminum production capacity.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is existing rectifier arrangement synoptic diagram.
Embodiment
Embodiment 1 of the present utility model: as shown in Figure 1, when rectifier 1 is built layout, 220KV inlet wire equipment 3 and outgoing equipment 4 are built in 220KV switching station 2 the same side mutually, build filter 6 to be joined after finishing at rectifier chamber and be placed on 5 roofs, rectifying device chamber, the length of rectifier 1 only is 105m like this, shortened 42.5m, rectifier 1 floor space reduces about 12000m 2, in identical floor space scope, make potroom 7 that the more electrolyzers of more factory building length configuration be arranged, improved the electrolytic aluminum production capacity.

Claims (2)

1. electrolytic aluminium factory rectifier arrangement, it comprises potroom (7), potroom (7) the other end is provided with rectifier (1), be provided with filter (6) in the rectifier (1), rectifying device chamber (5), 220KV switching station (2), 220KV inlet wire equipment (3) and outgoing equipment (4) is characterized in that: filter (6) is arranged on roof, rectifying device chamber (5).
2. electrolytic aluminium factory rectifier arrangement according to claim 1 is characterized in that: 220KV inlet wire equipment (3) is located at 220KV switching station (2) the same side mutually with outgoing equipment (4).
CN2009203023669U 2009-04-20 2009-04-20 Layout structure of rectification station in electrolytic aluminum plant Expired - Fee Related CN201473600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203023669U CN201473600U (en) 2009-04-20 2009-04-20 Layout structure of rectification station in electrolytic aluminum plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203023669U CN201473600U (en) 2009-04-20 2009-04-20 Layout structure of rectification station in electrolytic aluminum plant

Publications (1)

Publication Number Publication Date
CN201473600U true CN201473600U (en) 2010-05-19

Family

ID=42409844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203023669U Expired - Fee Related CN201473600U (en) 2009-04-20 2009-04-20 Layout structure of rectification station in electrolytic aluminum plant

Country Status (1)

Country Link
CN (1) CN201473600U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396702A (en) * 2019-08-30 2019-11-01 沈阳铝镁设计研究院有限公司 A kind of arragement construction of electrolytic aluminium factory rectifier and potroom

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396702A (en) * 2019-08-30 2019-11-01 沈阳铝镁设计研究院有限公司 A kind of arragement construction of electrolytic aluminium factory rectifier and potroom

Similar Documents

Publication Publication Date Title
CN201473600U (en) Layout structure of rectification station in electrolytic aluminum plant
CN203742903U (en) High-power offshore wind generating set tower external electric appliance assembly working platform
CN205231583U (en) Integration box formula integration charging station
CN107965177A (en) A kind of new energy carport
CN203962294U (en) A kind of high-rise wind resistance energy saving device
CN206116965U (en) Novel transformer substation
CN201762911U (en) Eave trim system used for steel structure
CN204926954U (en) Many hollow direct current sensillas of aluminium ribbon line duplex winding formula
CN202058761U (en) Screen printing crystalline silica solar energy cell positive silver screen printing plate
CN204597230U (en) One is high voltage distribution installation line framework arrangement within doors
CN201381367Y (en) Rectification unit layout structure matched with electrolysis plant in electrolytic aluminum factory
CN203374014U (en) Solar awning
CN203312342U (en) Building photovoltaic shutter assembly
CN201634782U (en) Connecting structure of regulating rectifier transformer of electrolytic aluminum plant
CN204651129U (en) Three-phase three-limb transformation reactance all-in-one
CN202630455U (en) Solar hot water supply and power generation system
CN205430135U (en) Photovoltaic component mounting structure
CN201682270U (en) Overvoltage absorption device of special frequency converter of mine hoist
CN203691330U (en) Tree-shaped solar receiver
CN203774642U (en) Prefabricated case of transformer station
CN203707722U (en) Lightning arrester of transformer station
CN202370188U (en) Roof glass membrane photoelectric curtain wall
CN203416218U (en) Profile on solar photovoltaic panel mounting bracket
CN209748491U (en) Movable plug photovoltaic junction box
CN201799325U (en) Novel power supply for electric dust collector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20130420