CN201460035U - Building column reinforcing steel positioning frame - Google Patents

Building column reinforcing steel positioning frame Download PDF

Info

Publication number
CN201460035U
CN201460035U CN2009200164472U CN200920016447U CN201460035U CN 201460035 U CN201460035 U CN 201460035U CN 2009200164472 U CN2009200164472 U CN 2009200164472U CN 200920016447 U CN200920016447 U CN 200920016447U CN 201460035 U CN201460035 U CN 201460035U
Authority
CN
China
Prior art keywords
posting
locating slot
positioning frame
reinforcing steel
post muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200164472U
Other languages
Chinese (zh)
Inventor
方萍
马彦杰
董晓梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
Construction Engineering Co Of Mcc Northeast Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Of Mcc Northeast Construction Co Ltd filed Critical Construction Engineering Co Of Mcc Northeast Construction Co Ltd
Priority to CN2009200164472U priority Critical patent/CN201460035U/en
Application granted granted Critical
Publication of CN201460035U publication Critical patent/CN201460035U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a building column reinforcing steel positioning frame which comprises a positioning frame, a cross support and a positioning groove, wherein the cross support is welded and fixed at the inner side of the positioning frame and the positioning groove is welded and fixed at the outer side of the positioning frame. The building column reinforcing steel positioning frame is simple in structure and convenient to use and is installed at the upper end and the lower end of the reinforced concrete column. The building column reinforcing steel positioning frame effectively ensures the thickness of the vertical reinforcing steel protection layer of the reinforced concrete column and the accuracy of the position of the vertical reinforcing steel plane of the reinforced concrete column.

Description

A kind of post muscle posting for building
Technical field
The utility model relates to a kind of positioner, particularly relates to a kind of post muscle posting for building.
Background technology
In building engineering construction, run into the construction of reinforced concrete column through regular meeting; in the vertical reinforcement installation process of reinforced concrete column; in order to guarantee the thickness of vertical reinforcement concrete cover, generally the method for Cai Yonging is the cement mortar cushion block of colligation site prefabrication on the pillar vertical reinforcement or uses the plastic cushion of directly buying.The cement mortar cushion block of site prefabrication is because the various human factors in the manufacturing process; can not guarantee effectively that the thickness of this cushion block satisfies the requirement of pillar vertical reinforcement protective layer thickness; cushion block after the colligation also is easy to produce landing or turn to, and does not usually have the effect that guarantees pillar vertical reinforcement protective layer thickness.In addition, what the colligation cushion block need be certain is artificial, wastes time and energy the effect that but not necessarily obtains.Though directly the plastic cushion of buying has overcome above-mentioned deficiency, the greatest problem that its exists is that not only cost height, intensity are low, and the raw material coefficient of expansion is concrete about 3 times.Therefore, this cushion block is imbedded in the pillar mileage amount of load-bearing when big, can because of the coefficient of expansion than big-difference, reinforcing bar in cushion block and the concrete is broken away from each other, produce the crack, malaria enters in the concrete, can cause the corrosion reinforcing bar, exist certain potential safety hazard after for many years.
Summary of the invention
The utility model has overcome deficiency of the prior art, and a kind of simple in structure, easy for installation, intensity is high, with low cost post muscle posting for building is provided.
In order to address the above problem, the utility model by the following technical solutions:
A kind of post muscle posting for building comprises formed frame, cross hang and locating slot, and the formed frame inboard is fixed with cross hang, and the formed frame outside is fixed with locating slot.
Described formed frame, cross hang and locating slot adopt reinforcing bar to weld together respectively.
Described locating slot width is than the big 2mm of diameter of steel concrete cement pillar vertical reinforcement.
Described locating slot length equals steel concrete cement pillar vertical reinforcement diameter and protective layer thickness sum.
Described posting Outside Dimensions equals steel concrete cement pillar Outside Dimensions.
Compared with prior art, the beneficial effects of the utility model are:
1, in the reinforcing bar the work items construction stage of reinforced concrete column, the stirrup of the utility model and reinforced concrete column is installed simultaneously, utilizes the positioning action of locating slot to vertical reinforcement, guarantees that effectively pillar vertical reinforcement plan-position is accurate.
2, in the template the work items construction stage of reinforced concrete column, post template and the utility model abut against together, utilize the supporting role of locating slot to template, effectively guarantee the thickness of reinforcement cover.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is for being equipped with reinforced concrete column structural representation of the present utility model.
Among the figure: 1, formed frame 2, cross hang 3, locating slot 4 reinforced concrete columns 5, vertical reinforcement
A is the length of locating slot, and b is the width of locating slot, and c, d are the cross section length of side of reinforced concrete column, and e is a thickness of concrete cover.
The specific embodiment
A kind of post muscle posting for building as shown in Figure 1, comprises formed frame 1, cross hang 2 and locating slot 3, and formed frame 1 inboard is fixed with cross hang 2, and formed frame 1 outside is fixed with locating slot 3.Formed frame 1, cross hang 2 and locating slot 3 adopt reinforcing bar to weld together respectively.Locating slot 3 width b are than the big 2mm of diameter of steel concrete cement pillar vertical reinforcement 5.The length a of locating slot 3 equals the diameter and the protective layer thickness e sum of steel concrete cement pillar vertical reinforcement 5.The posting Outside Dimensions equals steel concrete cement pillar Outside Dimensions.
Embodiment one
(c * d) is that the reinforced concrete column 4 of 500 * 500mm is an example, specifically sets forth the utility model with sectional dimension below.
As shown in Figure 2, the vertical reinforcement 5 of this pillar is 12 φ25, the thickness of concrete cover e of this pillar vertical reinforcement 5 is 30mm.
Post muscle posting adopts φ14 reinforcing bars are welded.During making, should first setting-out on steel plate, take measurements according to data essences such as pillar sectional dimension, pillar vertical reinforcement diameter and quantity, pillar vertical reinforcement protective layer thickness, make and be used to make formed frame 1, cross hang 2 and locating slot 3 φThe real size of 14 reinforcing bars utilizes double welding to incite somebody to action then φ14 reinforcing bars are according to firm welding shown in Figure 2.
In order effectively to utilize on-the-spot discarded steel bar end, also can adopt the reinforcement fabrication post muscle posting of other diameters, but should guarantee the strength and stiffness of post muscle posting, and setting-out on steel plate again, satisfy instructions for use with the manufactured size that guarantees post muscle posting.If the pillar sectional dimension is bigger, post muscle posting can be selected thicker reinforcement fabrication for use according to actual conditions, and the cross hang 2 in the corresponding increase post muscle posting, to guarantee the strength and stiffness of post muscle posting.
In work progress; the stirrup of the utility model and reinforced concrete column 4 should be installed simultaneously; in the top and bottom of every pillar all erection column muscle posting (if the pillar height surpasses 3m; can suitably increase the quantity of post muscle posting according to the actual height of pillar; to guarantee that the utility model fully guarantees the plan-position of pillar vertical reinforcement 5 and the function of thickness of protection tier); pillar vertical reinforcement 5 is placed in respectively in the locating slot 3, and 1 colligation is in the same place with formed frame then.In order to prevent that the locating slot 3 too small pillar vertical reinforcements 5 that cause can't be installed in the locating slot 3, when post muscle posting is made setting-out, should guarantee that locating slot 3 width b are than the big 2mm of pillar vertical reinforcement 5 diameters.

Claims (5)

1. a post muscle posting for building is characterized in that comprise formed frame, cross hang and locating slot, the formed frame inboard is fixed with cross hang, and the formed frame outside is fixed with locating slot.
2. a kind of post muscle posting for building according to claim 1 is characterized in that described formed frame, cross hang and locating slot adopt reinforcing bar to weld together respectively.
3. a kind of post muscle posting for building according to claim 1 is characterized in that described locating slot width is than the big 2mm of diameter of steel concrete cement pillar vertical reinforcement.
4. a kind of post muscle posting for building according to claim 1 is characterized in that described locating slot length equals steel concrete cement pillar vertical reinforcement diameter and protective layer thickness sum.
5. a kind of post muscle posting for building according to claim 1 is characterized in that described posting Outside Dimensions equals steel concrete cement pillar Outside Dimensions.
CN2009200164472U 2009-08-20 2009-08-20 Building column reinforcing steel positioning frame Expired - Fee Related CN201460035U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200164472U CN201460035U (en) 2009-08-20 2009-08-20 Building column reinforcing steel positioning frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200164472U CN201460035U (en) 2009-08-20 2009-08-20 Building column reinforcing steel positioning frame

Publications (1)

Publication Number Publication Date
CN201460035U true CN201460035U (en) 2010-05-12

Family

ID=42387388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200164472U Expired - Fee Related CN201460035U (en) 2009-08-20 2009-08-20 Building column reinforcing steel positioning frame

Country Status (1)

Country Link
CN (1) CN201460035U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040912A (en) * 2015-07-03 2015-11-11 中国十七冶集团有限公司 Distance frame of high-rise building standard floor shear wall and column rebar
CN105155853A (en) * 2015-08-20 2015-12-16 中铁建大桥工程局集团第五工程有限公司 Process for positioning and constructing reinforced concrete for high-rise residential buildings
CN109849178A (en) * 2019-01-24 2019-06-07 五冶集团上海有限公司 A kind of assembled architecture reinforcing bar fixing piece

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040912A (en) * 2015-07-03 2015-11-11 中国十七冶集团有限公司 Distance frame of high-rise building standard floor shear wall and column rebar
CN105155853A (en) * 2015-08-20 2015-12-16 中铁建大桥工程局集团第五工程有限公司 Process for positioning and constructing reinforced concrete for high-rise residential buildings
CN109849178A (en) * 2019-01-24 2019-06-07 五冶集团上海有限公司 A kind of assembled architecture reinforcing bar fixing piece

Similar Documents

Publication Publication Date Title
CN107288218B (en) Beam column node of assembled reinforced concrete frame structure and manufacturing method thereof
CN204662736U (en) Gas concrete out-hung panel slippage node
CN102817422A (en) Prestressed concrete constraining buckling-restrained brace
CN105201143A (en) Carbon fiber thin-wall steel tube concrete composite column with internal FRP sectional material and method
CN105649203A (en) Prefabricated prestressed concrete frame beam column joint with U-shaped steel bar and sleeves
CN102383420A (en) High-strength concrete prefabricated pile doped with fiber-reinforced plastic bar
CN102635177A (en) Un-bonded concealed bracing type shear wall for reinforced concrete frame and construction method thereof
Patel et al. Analysis of CFT, RCC and steel building subjected to lateral loading
CN201460035U (en) Building column reinforcing steel positioning frame
CN106245821A (en) A kind of lightweight steel construction lightweight concrete prefabrication and assembly construction body of wall and construction method thereof
CN205399774U (en) Cast -in -place hollow superstructure mandrel is anti to float and prevents side and move structure
CN101298796A (en) Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof
CN104264897B (en) Alternate tooth must superimposed beam and plate
CN203640061U (en) Node connecting structure of reinforced concrete column of basement
CN105735470A (en) Precast concrete frame system using high-performance materials differentially
CN201972315U (en) Vertical steel bar positioning device of rectangular concrete column members
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN101775876A (en) Spacial steel roof truss
CN101525918A (en) Method for making winged steel tube-concrete composite beam
CN205242989U (en) I -steel safety of encorbelmenting reinforced structure
CN104060762A (en) L-shaped steel pipe-steel framework recycled concrete combined pillar
CN104453045B (en) Separate prefabricated truss frame floor bearing plate and construction method thereof
CN103541478B (en) Lattice superposed beam and plate and construction method thereof
CN208717939U (en) A kind of efficiently molding building hoist foundation structure
CN203097109U (en) Pre-tensioning pre-stressing superposed secondary beam prefabricated component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA THIRD METALLURGICAL GROUP CO., LTD.

Free format text: FORMER OWNER: CONSTRUCTION ENGINEERING COMPANY OF MCC NORTHEAST CONSTRUCTION CO., LTD.

Effective date: 20140710

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 114001 ANSHAN, LIAONING PROVINCE TO: 114039 ANSHAN, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140710

Address after: 114039 Anshan province Liaoning City Mountain Road No. 105 building materials

Patentee after: CHINA THREE METALLURGICAL GROUP CO., LTD.

Address before: 114001 Anshan province Liaoning City Tiedong Gangcheng Street No. 79

Patentee before: Construction Engineering Company of MCC Northeast Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20150820

EXPY Termination of patent right or utility model