CN201420263Y - Breast wall of prefabricated concrete pipe of manual hole digging pile - Google Patents
Breast wall of prefabricated concrete pipe of manual hole digging pile Download PDFInfo
- Publication number
- CN201420263Y CN201420263Y CN2009200519272U CN200920051927U CN201420263Y CN 201420263 Y CN201420263 Y CN 201420263Y CN 2009200519272 U CN2009200519272 U CN 2009200519272U CN 200920051927 U CN200920051927 U CN 200920051927U CN 201420263 Y CN201420263 Y CN 201420263Y
- Authority
- CN
- China
- Prior art keywords
- concrete pipe
- concrete
- pipe
- pile
- cascaded surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200519272U CN201420263Y (en) | 2009-02-25 | 2009-02-25 | Breast wall of prefabricated concrete pipe of manual hole digging pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200519272U CN201420263Y (en) | 2009-02-25 | 2009-02-25 | Breast wall of prefabricated concrete pipe of manual hole digging pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201420263Y true CN201420263Y (en) | 2010-03-10 |
Family
ID=41806915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009200519272U Expired - Fee Related CN201420263Y (en) | 2009-02-25 | 2009-02-25 | Breast wall of prefabricated concrete pipe of manual hole digging pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201420263Y (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101956390A (en) * | 2010-09-27 | 2011-01-26 | 攀钢集团冶金工程技术有限公司 | Bored pile channel partition method |
CN102425156A (en) * | 2011-09-08 | 2012-04-25 | 广东省基础工程公司 | Cross section-variable underground continuous wall and construction method thereof |
CN103758123A (en) * | 2014-01-24 | 2014-04-30 | 江苏建筑职业技术学院 | Method for constructing protecting wall lining of cast-in-place manual hole digging pile |
CN105421339A (en) * | 2015-12-14 | 2016-03-23 | 中冶集团武汉勘察研究院有限公司 | Novel combined concrete protection wall for manual rectangular anti-slide digging pile and installation method of novel combined concrete protection wall |
CN106168034A (en) * | 2015-09-30 | 2016-11-30 | 洛阳武轩重工机械有限公司 | A kind of retaining wall plate |
CN107326901A (en) * | 2016-04-29 | 2017-11-07 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of prefabricated bamboo formula retaining wall of stake holes |
CN113266011A (en) * | 2021-04-28 | 2021-08-17 | 李俊飞 | Novel composite pile enclosure device |
-
2009
- 2009-02-25 CN CN2009200519272U patent/CN201420263Y/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101956390A (en) * | 2010-09-27 | 2011-01-26 | 攀钢集团冶金工程技术有限公司 | Bored pile channel partition method |
CN101956390B (en) * | 2010-09-27 | 2012-02-08 | 东北金城建设股份有限公司 | Bored pile channel partition method |
CN102425156A (en) * | 2011-09-08 | 2012-04-25 | 广东省基础工程公司 | Cross section-variable underground continuous wall and construction method thereof |
CN103758123A (en) * | 2014-01-24 | 2014-04-30 | 江苏建筑职业技术学院 | Method for constructing protecting wall lining of cast-in-place manual hole digging pile |
CN103758123B (en) * | 2014-01-24 | 2015-12-09 | 江苏建筑职业技术学院 | The construction method of manually digging hole filling pile retaining wall lining |
CN106168034A (en) * | 2015-09-30 | 2016-11-30 | 洛阳武轩重工机械有限公司 | A kind of retaining wall plate |
CN105421339A (en) * | 2015-12-14 | 2016-03-23 | 中冶集团武汉勘察研究院有限公司 | Novel combined concrete protection wall for manual rectangular anti-slide digging pile and installation method of novel combined concrete protection wall |
CN107326901A (en) * | 2016-04-29 | 2017-11-07 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of prefabricated bamboo formula retaining wall of stake holes |
CN113266011A (en) * | 2021-04-28 | 2021-08-17 | 李俊飞 | Novel composite pile enclosure device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201420263Y (en) | Breast wall of prefabricated concrete pipe of manual hole digging pile | |
CN105114105A (en) | Steel-concrete composite tunnel lining supporting structure and manufacturing and construction method thereof | |
CN106761768B (en) | A kind of steel pipe curtain structure support system and its construction method | |
CN110331727B (en) | Support structure combining cast-in-place pile and underground diaphragm wall and construction method | |
CN110593890B (en) | Tunnel corrugated steel double-layer primary lining supporting method | |
CN101503882A (en) | Construction method for underground continuous wall with conjoined reinforcing cage by topdown construction method | |
KR101751418B1 (en) | Grouting device using a reinforced network is equipped with a small steel pipe | |
CN102493446B (en) | Steel tube column capable of preventing concrete spillover and method for mounting steel tube column | |
KR100850028B1 (en) | Construction method using concrete mould for concrete piles cast in position | |
CN107740427A (en) | A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure | |
CN201605599U (en) | Integrated prefabricated inspection well | |
CN208472717U (en) | A kind of depth back filled region bored concrete pile steel pile casting retaining wall | |
JP5919675B2 (en) | Composite foundation pile and construction method of composite foundation pile | |
CN108086307B (en) | Steel pipe concrete hole digging and pouring composite miniature pile | |
JP2011017188A (en) | Demolition method of existing building | |
JP2010209645A (en) | Foundation pile structure and construction method for the foundation pile | |
CN101525875B (en) | Reinforced concrete bifurcated pipe structure under action of high pressure water and construction method | |
CN103911986B (en) | A kind of construction method combining strike-on steel pipe pile | |
CN217325391U (en) | Construction tool for high-speed rail line deep foundation pit secant pile | |
CN105350547A (en) | Method applicable to inter-pile soil support of slope protection pile | |
KR101884663B1 (en) | Construction method for soil retaining wall using cap slab | |
CN101979777A (en) | Cast-in-place hollow square pile and combined underground continuous wallboard and construction method thereof | |
CN101691753B (en) | Pile mould for PCC pile and construction method for overlong PCC pile | |
CN103397650B (en) | A kind of large-scale steel cylinder cofferdam structure | |
CN113957880A (en) | Construction method of steel-concrete underground continuous wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Free format text: FORMER OWNER: YE ZHANGQING Effective date: 20110829 Free format text: FORMER OWNER: ZHU KUI |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20110829 Address after: 325000 Fairview Road, Fairview Midtown tower, Wenzhou, 6F-7F Patentee after: Wenzhou Zhongcheng Building Group Co., Ltd. Address before: 325000 No. 4, Jinchuan Road, Longwan District, Zhejiang, Wenzhou Co-patentee before: Zhu Kui Patentee before: Ye Changqing |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100310 Termination date: 20130225 |