CN201395870Y - 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 - Google Patents

钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 Download PDF

Info

Publication number
CN201395870Y
CN201395870Y CN2009200377731U CN200920037773U CN201395870Y CN 201395870 Y CN201395870 Y CN 201395870Y CN 2009200377731 U CN2009200377731 U CN 2009200377731U CN 200920037773 U CN200920037773 U CN 200920037773U CN 201395870 Y CN201395870 Y CN 201395870Y
Authority
CN
China
Prior art keywords
shear wall
groove
slot
precast beam
fabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200377731U
Other languages
English (en)
Inventor
山姆·西格曼
侯海泉
董年才
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Construction General Contractor Co., Ltd.
Original Assignee
NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd filed Critical NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd
Priority to CN2009200377731U priority Critical patent/CN201395870Y/zh
Application granted granted Critical
Publication of CN201395870Y publication Critical patent/CN201395870Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

本实用新型公开了一种钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点,包括剪力墙和预制梁槽,其特征在于:所述预制梁槽的宽度与剪力墙的厚度相同,所述预制梁槽呈“凹”字型,所述剪力墙在节点处具有一凹形槽,所述预制梁槽伸入剪力墙的凹形槽一段距离,在剪力墙的凹形槽内及预制梁槽的凹槽、上方为叠合板现浇混凝土,在预制梁槽的凹槽上部和下部分别设置有梁上部附加筋和梁下部附加筋,同时梁上部附加筋和梁下部附加筋伸入至剪力墙内,所述预制梁槽上方的叠合板现浇混凝土内的钢筋与预制梁槽的钢筋为一整体。本实用新型的连接节点可以使剪力墙与梁连接成为一个整体,能够承受与传递竖直及水平方向的外力,且结构简单,施工过程简单。

Description

钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点
技术领域
本实用新型涉及一种钢筋混凝土全预制装配机构剪力墙与梁之间的连接结构,属于建筑结构技术领域。
背景技术
剪力墙是由钢筋混凝土浇成的墙体。由剪力墙组成的承受竖向和水平作用的结构,称为剪力墙结构。剪力墙的抗侧移刚度很大,它主要用来抵抗水平作用和承担竖向作用;墙体同时也作为维护及房屋分隔构件。剪力墙结构可建得很高,主要用于12-30层的住宅建设。剪力墙结构是由钢筋混凝土墙板代替框架结构中的梁柱作为建筑主要承重构件的结构。因为高层建筑所要抵抗的水平剪力主要是地震引起,所以剪力墙较之其他结构形式而言,更能有效地控制结构的水平剪力,抵抗破坏的能力更强,抗震性能更好,安全性更高,居住也很舒适。在剪力墙与板或梁连接处,需要使剪力墙与板或梁成为整体,使剪力墙保持连续,在地震力等外力的作用下,能够传递竖向反力与水平剪力,保证建筑物安全。目前,剪力墙与梁的连接节点有很多种,专利号为CN97248704.2的实用新型公开了一种预应力空心板与混凝土剪力墙及梁的连接节点,由混凝土剪力墙、先张预应力空心板、锚固筋组成,其特征是:在空心板端的孔洞位置开设键槽,槽内放置钢筋,钢筋伸入每层剪力墙体与墙体中钢筋锚固,满足规范要求的搭接长度,键槽内的混凝土与剪力墙混凝土同时浇筑,使板墙或梁节点成为整体。该节点连接,可使剪力墙保持连续,在地震力的作用下,传递竖向反力并避免空心板塌落;作为水平隔板的空心板传递水平剪力,适用于多层及高层住宅建筑,但这种节点结构复杂、施工相对复杂。
实用新型内容
本实用新型所要解决的技术问题是提供一种可使剪力墙与梁成为整体、且结构简单的钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点。
为解决上述技术问题,本实用新型提供一种钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点,包括剪力墙和预制梁槽,其特征在于:所述预制梁槽的宽度与剪力墙的厚度相同,所述预制梁槽呈“凹”字型,所述剪力墙在节点处具有一凹形槽,所述预制梁槽伸入剪力墙的凹形槽一段距离,在剪力墙的凹形槽内及预制梁槽的凹槽内为叠合板现浇混凝土,在预制梁槽的凹槽下部设置有梁下部附加筋,同时梁下部附加筋伸入至剪力墙内,在预制梁槽的凹槽上部设置有梁上部附加筋,同时梁上部附加筋伸入至剪力墙内,梁下部附加筋和梁上部附加筋在剪力墙内及预制梁槽的凹槽内的长度满足锚固要求,所述预制梁槽上方的叠合板现浇混凝土内的钢筋与预制梁槽的钢筋为一整体。
本实用新型所达到的有益效果:
本实用新型的钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点,通过设置预制梁槽并在连接处设置有附加筋,再在现场浇注叠合板现浇混凝土,所以使剪力墙与梁连接成为一个整体,能够承受与传递竖直及水平方向的外力,保证建筑物的安全,且结构简单,施工过程简单。
附图说明
图1为本实用新型的钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点结构示意图;
图2为图1的A-A向剖面图;
图3为图2的B-B向剖面图。
附图中的各标记所表示的结构名称为:
1.剪力墙
2.预制梁槽
3.叠合板现浇混凝土
4.梁上部附加筋
5.梁下部附加筋
6.梁箍筋
具体实施方式
下面结合附图对本实用新型作进一步说明。图1为本实用新型的钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点结构示意图;图2为图1的A-A向剖面图;图3为图2的B-B向剖面图。本实用新型的一种钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点,包括剪力墙1和预制梁槽2,其特征在于:所述预制梁槽2的宽度与剪力墙1的厚度相同,所述剪力墙1在节点处具有一凹形槽,所述预制梁槽2伸入剪力墙1的凹形槽一段距离,在剪力墙1的凹形槽内及预制梁槽2的凹槽内为叠合板现浇混凝土3,在预制梁槽2的凹槽下部设置有梁下部附加筋5,同时梁下部附加筋5伸入至剪力墙1内,在预制梁槽2的凹槽上部设置有梁上部附加筋4,同时梁上部附加筋4伸入至剪力墙1内,梁下部附加筋5和梁上部附加筋4在剪力墙1内及预制梁槽2的凹槽内的长度满足锚固要求,所述预制梁槽2上方的叠合板现浇混凝土3内的钢筋与预制梁槽2的钢筋为一整体。
所述预制梁槽2伸入剪力墙1的凹形槽距离为15mm。
所述剪力墙1的凹形槽宽度为250mm。
本实用新型的钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点的施工方法为:
1)按照所制作梁的各种尺寸制作预制梁槽2及其内部和外部的包括梁箍筋6在内的钢筋;
2)按锚固的规范要求将一定数量的附加筋4锚入剪力墙1内,其位置与预制梁槽2内的位置相对应;
3)在入剪力墙1内的凹形槽内、预制梁槽2的凹槽内、上部现场浇注混凝土成为叠合板现浇混凝土3;
4)经过规定时间的养护后成为所需的梁及节点。

Claims (3)

1.一种钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点,包括剪力墙(1)和预制梁槽(2),其特征在于:所述预制梁槽(2)的宽度与剪力墙(1)的厚度相同,所述预制梁槽(2)呈“凹”字型,所述剪力墙(1)在节点处具有一凹形槽,所述预制梁槽(2)伸入剪力墙(1)的凹形槽一段距离,在剪力墙(1)的凹形槽内及预制梁槽(2)的凹槽内为叠合板现浇混凝土(3),在预制梁槽(2)的凹槽下部设置有梁下部附加筋(5),同时梁下部附加筋(5)伸入至剪力墙(1)内,在预制梁槽(2)的凹槽上部设置有梁上部附加筋(4),同时梁上部附加筋(4)伸入至剪力墙(1)内,梁下部附加筋(5)和梁上部附加筋(4)在剪力墙(1)内及预制梁槽(2)的凹槽内的长度满足锚固要求,所述预制梁槽(2)上方的叠合板现浇混凝土(3)内的钢筋与预制梁槽(2)的钢筋为一整体。
2.根据权利要求1所述的钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点,其特征在于:所述预制梁槽(2)伸入剪力墙(1)的凹形槽距离为15mm。
3.根据权利要求1所述的钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点,其特征在于:所述剪力墙(1)的凹形槽宽度为250mm。
CN2009200377731U 2009-02-04 2009-02-04 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点 Expired - Lifetime CN201395870Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200377731U CN201395870Y (zh) 2009-02-04 2009-02-04 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200377731U CN201395870Y (zh) 2009-02-04 2009-02-04 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点

Publications (1)

Publication Number Publication Date
CN201395870Y true CN201395870Y (zh) 2010-02-03

Family

ID=41618374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200377731U Expired - Lifetime CN201395870Y (zh) 2009-02-04 2009-02-04 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点

Country Status (1)

Country Link
CN (1) CN201395870Y (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503892B (zh) * 2009-02-04 2011-02-16 南通建筑工程总承包有限公司 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点
CN102995613A (zh) * 2012-12-17 2013-03-27 中国水电顾问集团贵阳勘测设计研究院 水电站厂房墙体与板梁分期浇筑的连接方法及结构
CN103556710A (zh) * 2013-10-08 2014-02-05 沈阳建筑大学 预制半片剪力墙与梁露骨料连接方法
CN104594528A (zh) * 2014-12-11 2015-05-06 天津住宅集团建设工程总承包有限公司 一种预制连梁和预制墙连接端部施工方法
CN105040677A (zh) * 2015-08-12 2015-11-11 济南轨道交通集团有限公司 基坑预制桩与现浇叠合内衬墙箍筋的连接方法
CN105986621A (zh) * 2016-04-13 2016-10-05 上海建工二建集团有限公司 预制装配式建筑混凝土梁柱型钢组合连接节点构造及方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503892B (zh) * 2009-02-04 2011-02-16 南通建筑工程总承包有限公司 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点
CN102995613A (zh) * 2012-12-17 2013-03-27 中国水电顾问集团贵阳勘测设计研究院 水电站厂房墙体与板梁分期浇筑的连接方法及结构
CN103556710A (zh) * 2013-10-08 2014-02-05 沈阳建筑大学 预制半片剪力墙与梁露骨料连接方法
CN104594528A (zh) * 2014-12-11 2015-05-06 天津住宅集团建设工程总承包有限公司 一种预制连梁和预制墙连接端部施工方法
CN104594528B (zh) * 2014-12-11 2017-02-22 天津住宅集团建设工程总承包有限公司 一种预制连梁和预制墙连接端部施工方法
CN105040677A (zh) * 2015-08-12 2015-11-11 济南轨道交通集团有限公司 基坑预制桩与现浇叠合内衬墙箍筋的连接方法
CN105986621A (zh) * 2016-04-13 2016-10-05 上海建工二建集团有限公司 预制装配式建筑混凝土梁柱型钢组合连接节点构造及方法

Similar Documents

Publication Publication Date Title
CN101503892B (zh) 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点
CN201395870Y (zh) 钢筋混凝土全预制装配结构剪力墙与梁之间的连接节点
CN109469202A (zh) 一种预应力装配整体式混凝土框架结构体系及其施工方法
CN101845852B (zh) 轻钢轻混凝土结构体系及其施工方法
CN201809864U (zh) 具有“t”型连接构件的抗震叠合板式剪力墙
CN102808450A (zh) 一种装配整体式剪力墙建筑结构及建造方法
CN203452228U (zh) 框架—剪力墙建筑结构
CN2288226Y (zh) 钢筋混凝土剪力键式双向空心大板
CN106869567A (zh) 一种耗能型冷弯薄壁钢管混凝土抗侧力体系
CN101503887B (zh) 内剪力墙与板及剪力墙层间连接节点
CN2921139Y (zh) 组合式空腹大板楼盖
CN108625491B (zh) 装配式h型钢柱-独立基础-混凝土圈梁l形连接节点
CN212562032U (zh) 一种带洞口叠合剪力墙纵横墙侧面出筋连接节点构造
CN201395859Y (zh) 内剪力墙与板及剪力墙层间连接节点
CN205329970U (zh) 一种预制混凝土墙板及其构建的带暗框架的墙板结构体系
CN111691580A (zh) 空腔内配置大直径边缘构件竖向受力钢筋的叠合暗柱及预制墙
CN108412036B (zh) 装配式h型钢柱-独立基础-混凝土圈梁十字形连接节点
CN108978996B (zh) 一种在既有砖混结构中增加的挑梁及其施工方法
CN201050113Y (zh) 轻骨料钢筋砼节能住宅建筑结构新体系
CN110359612A (zh) 一种装配式新型双向密肋压型钢板组合楼板
CN201433465Y (zh) 外剪力墙与板及剪力墙层间连接节点
CN212562033U (zh) 空腔内配置大直径竖向受力钢筋的叠合暗柱及预制墙
CN108589924A (zh) 一种装配式混合型组合框架及预制叠合楼板结构体系
CN111576880B (zh) 开窗洞叠合剪力墙连梁装配施工方法
CN210049380U (zh) 钢砼组合框架柱与钢筋混凝土框架柱组合装配式结构体系

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: KANNUOC (SHANGHAI ) ENGINEERING TECHNOLOGY ADVICE

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sam.Sigelman

Inventor after: Hou Haiquan

Inventor after: Dong Niancai

Inventor after: Zhang Jun

Inventor before: Sam.Sigman

Inventor before: Hou Haiquan

Inventor before: Dong Niancai

Inventor before: Zhang Jun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SAM SIGMAN HOU HAIQUAN DONG NIANCAI ZHANG JUN TO: SAM SAIGMAN HOU HAIQUAN DONG NIANCAI ZHANG JUN

TR01 Transfer of patent right

Effective date of registration: 20100603

Address after: 226124 Jiangsu Province Haimen Changle Town

Co-patentee after: Nantong Construction General Contractor Co., Ltd.

Patentee after: Nantong Construction General Contractor Co., Ltd.

Address before: 226124 Jiangsu Province Haimen Changle Town

Patentee before: Nantong Construction General Contractor Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20100203

Effective date of abandoning: 20090204