CN201387003Y - Water supply device of boiler with balanced pressure - Google Patents

Water supply device of boiler with balanced pressure Download PDF

Info

Publication number
CN201387003Y
CN201387003Y CN200920114810U CN200920114810U CN201387003Y CN 201387003 Y CN201387003 Y CN 201387003Y CN 200920114810 U CN200920114810 U CN 200920114810U CN 200920114810 U CN200920114810 U CN 200920114810U CN 201387003 Y CN201387003 Y CN 201387003Y
Authority
CN
China
Prior art keywords
water
water supply
valve
boiler
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920114810U
Other languages
Chinese (zh)
Inventor
叶文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200920114810U priority Critical patent/CN201387003Y/en
Application granted granted Critical
Publication of CN201387003Y publication Critical patent/CN201387003Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a water supply device of a boiler with balanced pressure, belonging to the technical field of the water supply device of the boiler, and aiming at overcoming the disadvantages that the current high pressure centrifugal pump has high energy consumption, hidden trouble to safety operation, complicated maintenance work and noise and pollution to the environment while water is replenished to the boiler. The utility model comprises a water storage tank, a water supply valve, a water supply pipe, a boil cylinder and a water replenishing tank; the water storage tank is communicated with the water replenishing tank through the water supply valve and the water supply pipe; the water replenishing tank is communicated with the boiler cylinder through the water replenishing valve and the water replenishing tank; a balance pipe is installed between the water replenishing tank and the boiler cylinder; the balance pipe is provided with a balance valve; the top of water replenishing tank is provided with a pressure release pipe; and the pressure release pipe is provided with a pressure relief valve. The water supply device has the advantages of energy saving, safe and reliable operation, no noise and pollution, and the like, and is applicable to various types of hot water and steam boilers.

Description

Boiler pressure balance water supply installation
Technical field
The utility model relates to the boiler water supply equipment technical field, particularly relates to a kind of boiler pressure balance water supply installation.
Background technology
At the boiler of usefulness, having very, major part provides steam or hot water to the user with regard at present.Steam that they are exported or hot water do not return drum.So this class boiler must often replenish qualified water, just can keep continual safe operation.To the mode of boiler replenishing water, be mostly to adopt the mode of centrifugal high pressure water pump pressure now to the drum water filling.By analysis, be not difficult to find, have the following disadvantages with the mode of high pressure centrifugal pump to boiler replenishing water:
At first be, current are in being transferred process, be under the situation of high flow rate, constantly flowed to and fluidised form, and be subjected to the high speed shear of pump rotor: especially adopt in the operating mode of multistage polyphone centrifugal pump current the suddenlyd change flow direction, fluidised form by flip-flop, situation by high speed shear is more serious, so just make being consumed in a large number by head of current, cause the operating efficiency of centrifugal high pressure water pump low, i.e. the energy consumption height.
Next is, because the centrifugal high pressure pumping system involves pot motor, power train, slipper seal system, the pump housing and rotor, conveyance conduit etc., and all be state work, be easy to be out of order, promptly bring hidden danger and maintenance work numerous and diverse safe operation at high rotating speed High Voltage.
Also have, high pressure centrifugal pump is because rotating speed height during operation, and suffered pressure is big, so bigger noise is arranged, environment is polluted.
Summary of the invention
The purpose of this utility model provides a kind of boiler pressure balance water supply installation, overcome present with high pressure centrifugal pump to the existing energy consumption height of the mode of boiler feedwater, have hidden danger and maintenance work numerous and diverse to safe operation, environment is caused deficiencies such as noise pollution.
The utility model is achieved by following technical proposals.
The utility model comprises water storage tank, water-supply valve, feed pipe, boiler drum, is provided with water supply tank, as special usefulness of giving the boiler drum moisturizing.Water storage tank makes to store the usefulness at treated qualified water source, and water storage tank is communicated with water supply tank by water-supply valve, feed pipe.Water supply tank is communicated with boiler drum by water compensating valve, filling pipe, be provided with balance pipe between water supply tank and the boiler drum, balanced valve is housed on the balance pipe, and relief tube is equipped with at the top of water supply tank, and relief valve is housed on the relief tube, setting height(from bottom) is concerning the utility model, most important, flow into the target that needs supplementing water in order to reach the gravity that makes full use of water, should make has enough differences of height between them, the caliber of aqueduct amplifies as far as possible simultaneously, to reduce flow resistance.In the utility model, the permission lowest water level line of water supply tank is fair with the permission maximum water level of boiler drum at least, and the permission lowest water level line of water storage tank is fair with the permission maximum water level of water supply tank at least.Here water storage tank is that the position is the highest, but because it is open to atmosphere, horizontal plane does not have impressed pressure, therefore, if water treatment procedure with the platform of water storage tank sustained height on carry out, then need not increase the water pump that water storage tank supplies water, as long as utilize the pressure head of running water pipe network enough.Even use water supply pump, as long as also select the high efficiency water pump of low pressure and mass flow for use; Simultaneously, consider that water supply tank is to utilize some in order to pressure balanced pressure head to the boiler drum moisturizing, the energy that the two addition consumed also is to be significantly less than the energy that high-pressure hydraulic pump directly supplies water and will consume to boiler drum.
The utility model can also can be controlled with automatic by manually-operated in implementation process.As long as water-supply valve, water compensating valve, balanced valve, relief valve are all used instead motor-driven valve, be equipped with automatic control electric wiring again and get final product.
Compare with prior art, the utlity model has following beneficial effect:
1. because in feedwater and the moisturizing process, the fluidised form of current is not really serious turbulent flow or even laminar flows, and the situation of sudden change direction and sudden change shape significantly reduces, so, the suffered resistance of current is very little, consume can head and directly compare with high-pressure hydraulic pump and to want much less to the boiler drum water filling, therefore, saved the energy.
2. operating ratio is more safe and reliable, and long service life has been saved the expense and the man-hour of keeping in repair.
3. in service do not have a noise, free from environmental pollution.
Description of drawings
Accompanying drawing is a scheme of installation of the present utility model.
Among the figure: 1. boiler drum, 2. water supply tank, 3. water storage tank, 4. balanced valve, 5. balance pipe, 6. water compensating valve, 7. filling pipe, 8. relief valve, 9. relief tube, 10. water-supply valve, 11. feed pipes.
The specific embodiment
All filled water when boiler drum 1 and water supply tank 2 and water storage tank 3, under the situation that each valve is all closed, boiler normally moves.Boiler is through after a while operation, and the water level of boiler drum 1 has dropped to lowest water level, and needed moisturizing this moment.Operating sequence is: balanced valve 4 is opened by elder generation, and the pressure in the boiler drum 1 makes the pressure in the water supply tank 2 equate with boiler drum 1 interior pressure by the transmission of balance pipe 5.Then, open water compensating valve 6, the water in the water supply tank 2 is just because the effect of gravity flows into boiler drum 1 by filling pipe 7.After supplying water, close balanced valve 4 and water compensating valve 6, open relief valve 8, allow water supply tank 2 interior overbottom pressure discharge by relief tube 9, open water-supply valve 10 again, the water in the water storage tank 3 just flow to water supply tank 2 by feed pipe 11.Then close relief valve 8 and water-supply valve 10 after water supply tank 2 is supplied water, wait for next moisturizing operating process.

Claims (2)

1, a kind of boiler pressure balance water supply installation, comprise water storage tank, water-supply valve, feed pipe, boiler drum, it is characterized in that, be provided with water supply tank, water storage tank passes through water-supply valve, feed pipe is communicated with water supply tank, water supply tank passes through water compensating valve, filling pipe is communicated with boiler drum, be provided with balance pipe between water supply tank and the boiler drum, balanced valve is housed on the balance pipe, relief tube is equipped with at the top of water supply tank, and relief valve is housed on the relief tube, and setting height(from bottom) is, the permission lowest water level line of water supply tank is fair with the permission maximum water level of boiler drum at least, and the permission lowest water level line of water storage tank is fair with the permission maximum water level of water supply tank at least.
2, a kind of boiler pressure balance water supply installation according to claim 1 is characterized in that described water-supply valve, water compensating valve, balanced valve, relief valve are motor-driven valve.
CN200920114810U 2009-03-03 2009-03-03 Water supply device of boiler with balanced pressure Expired - Fee Related CN201387003Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920114810U CN201387003Y (en) 2009-03-03 2009-03-03 Water supply device of boiler with balanced pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920114810U CN201387003Y (en) 2009-03-03 2009-03-03 Water supply device of boiler with balanced pressure

Publications (1)

Publication Number Publication Date
CN201387003Y true CN201387003Y (en) 2010-01-20

Family

ID=41579537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920114810U Expired - Fee Related CN201387003Y (en) 2009-03-03 2009-03-03 Water supply device of boiler with balanced pressure

Country Status (1)

Country Link
CN (1) CN201387003Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105782947A (en) * 2014-11-18 2016-07-20 孔令斌 Unpowered water replenishing control method for steam boiler
KR20160119965A (en) * 2015-04-07 2016-10-17 명광록 High Pressure Feed Water Device and Water Supplying Method of Vapor Generator Using The Pressure Transfer Tank
CN106642724A (en) * 2016-12-14 2017-05-10 谭潘 Explosionproof automatic pressure relief boiler
CN108361997A (en) * 2018-03-21 2018-08-03 芜湖鸣人热能设备有限公司 The water supply installation of hot-water boiler
CN111939841A (en) * 2020-08-13 2020-11-17 中国科学院西北生态环境资源研究院 Method for dynamically adjusting water content of medium in hydrate forming process
CN112538409A (en) * 2020-12-15 2021-03-23 四川安岳中柠柠檬产业技术研究有限公司 Lemon wine system wine equipment

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105782947A (en) * 2014-11-18 2016-07-20 孔令斌 Unpowered water replenishing control method for steam boiler
KR20160119965A (en) * 2015-04-07 2016-10-17 명광록 High Pressure Feed Water Device and Water Supplying Method of Vapor Generator Using The Pressure Transfer Tank
KR101708835B1 (en) 2015-04-07 2017-02-21 명광록 High Pressure Feed Water Device and Water Supplying Method of Vapor Generator Using The Pressure Transfer Tank
CN106642724A (en) * 2016-12-14 2017-05-10 谭潘 Explosionproof automatic pressure relief boiler
CN106642724B (en) * 2016-12-14 2022-07-12 谭潘 Explosion-proof automatic pressure relief boiler
CN108361997A (en) * 2018-03-21 2018-08-03 芜湖鸣人热能设备有限公司 The water supply installation of hot-water boiler
CN111939841A (en) * 2020-08-13 2020-11-17 中国科学院西北生态环境资源研究院 Method for dynamically adjusting water content of medium in hydrate forming process
CN111939841B (en) * 2020-08-13 2022-05-17 中国科学院西北生态环境资源研究院 Method for dynamically adjusting water content of medium in hydrate forming process
CN112538409A (en) * 2020-12-15 2021-03-23 四川安岳中柠柠檬产业技术研究有限公司 Lemon wine system wine equipment
CN112538409B (en) * 2020-12-15 2024-04-19 四川安岳中柠柠檬产业技术研究有限公司 Lemon wine system wine equipment

Similar Documents

Publication Publication Date Title
CN201387003Y (en) Water supply device of boiler with balanced pressure
CN203949361U (en) A kind of intelligent air energy domestic hot-water produces system
CN102748231A (en) Wind energy heating device of airfoil fan with vertical shaft
CN202040890U (en) Distribution type heat supply system
CN202832672U (en) Circulating water balance water supply device
RU40411U1 (en) HYDROTARAN
CN105240816A (en) Heating system provided with water level controller
CN210118733U (en) Intelligent water replenishing device for boiler
JP2009144514A (en) Auxiliary electric power combination type circulating hydraulic power generating device
CN205773480U (en) A kind of constant-pressure water supplementing vacuum degassing group
BE1022242B1 (en) DEVICE FOR STORING AND CONVERTING ENERGY
CN202182459U (en) Circulation line system for booster pump of turbine driven boiler feed water pump and deaerator water tank
CN102759098B (en) Non-kinetic energy water supplying system
CN201401267Y (en) Siphon-type fluid propulsion plant
CN207317063U (en) A kind of electric heating equipment and coal-fired arcola and machine heating system
CN101598323B (en) Non-pump water adding horizontal boiler
CN202018028U (en) Closed circulation water cooler for power station boilers
CN105222213B (en) Closed scheme of hot-water supply and operation method using residual heat of air compressor as heat source
CN212537784U (en) Solar steam generation device and solar steam generation system
CN202099313U (en) Buffer and balance device for water feed pump system of waste heat boiler of converter
CN113250890B (en) Power generation device capable of improving water quality
CN211177431U (en) Novel energy-saving environment-friendly hydrothermal liquid hot water oil furnace
CN202675259U (en) Water supply system
CN216342547U (en) Energy storage system for comprehensively utilizing solar energy and water energy
CN108758586A (en) A kind of clean energy resource energy storage steam generating system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100120

Termination date: 20110303