CN201386418Y - Prayer pole - Google Patents

Prayer pole Download PDF

Info

Publication number
CN201386418Y
CN201386418Y CN200920079304U CN200920079304U CN201386418Y CN 201386418 Y CN201386418 Y CN 201386418Y CN 200920079304 U CN200920079304 U CN 200920079304U CN 200920079304 U CN200920079304 U CN 200920079304U CN 201386418 Y CN201386418 Y CN 201386418Y
Authority
CN
China
Prior art keywords
rod
flagpole
long narrow
narrow flag
flag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920079304U
Other languages
Chinese (zh)
Inventor
李甫永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deyang Yongqiang Stainless Steel Co Ltd
Original Assignee
Deyang Yongqiang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deyang Yongqiang Stainless Steel Co Ltd filed Critical Deyang Yongqiang Stainless Steel Co Ltd
Priority to CN200920079304U priority Critical patent/CN201386418Y/en
Application granted granted Critical
Publication of CN201386418Y publication Critical patent/CN201386418Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a prayer rod which is characterized in that the upper end of a flag pole (2) is fixed on a pole body (6), a chute (3) is fixed on the pole body (6), a wheel (b) at one end of a moving trolley (4) is mounted in the chute (3), and a sleeve (c) at the other end of the moving trolley (4) is sheathed on the flag pole (2). The prayer pole is beautiful and durable, is conveniently lifted, and has good stability and strong firmness.

Description

Bar
Technical field
The utility model relates to flagpole, especially relates to the bar of a kind of installation through long narrow flag.
Background technology
Pass culture through long narrow flag as deposition Tibetan for many years, with its colourful form, stayed the historical impression of buddhism culture, and showed a wide and mysterious world to common people, why it is called through long narrow flag, be because all be printed on Buddhist sutra on these long narrow flags, believing in the people of Tibetan Buddhist, with the wind and the dance wave through long narrow flag, recite scripture exactly once, in transmitter's hope Godwards ceaselessly, earnestly hope refreshing blessing.Like this, just become the tie that connects refreshing and people through long narrow flag.Every have through the place of long narrow flag promptly mean the gods place, mean the earnestly hope place of people to gods, entrusting to the care of the many wonderful dreams of people through long narrow flag.
Particularly in the Tibetan area, annual almost every household all can be changed new for long narrow flag, on the important date, as church festival, offer a sacrifice to an ancestor, moving to a better place, marriage, even go out to pay respects to, people such as working will rise extension through long narrow flag, with what link to each other closely through long narrow flag has been exactly bar, the Tibetan area people's bar is made of wooden now, wooden bar generally be 3 years one by turns, annual all have ten hundreds of Tibetan far place of making a difficult journey to seek wooden source, so that ecology is affected, living environment go fromes bad to worse, and has had a strong impact on the Tibetan area people's economic development and living standard, wooden bar all will be felled from far place at every turn, and the generation freight, mounting cost and labour cost, cost is high and not attractive in appearance.For the interests of Tibetan people, government proposes to protect forest resources, and the raw material of wooden bar are restricted.Hide to pass culture and develop in order to allow, make this bright jewel more bright and glittering, the applicant's utility model a kind of bar, in order to replace wooden bar.
The utility model content
It is convenient that the purpose of this utility model provides a kind of lifting, and fastness is strong, long service life, the bar of good looking appearance.
In order to achieve the above object, the utility model adopts following technical scheme: a kind of bar, whole chute is fixed on the body of rod, wear flagpole and be fixed on body of rod top through its upper end, rise when long narrow flag, the lower end of wearing flagpole is unsettled, be contained in through the installation sleeve on it through long narrow flag and wear on the flagpole, rise along wearing flagpole through the Circularly liftable rope of long narrow flag on fixed pulley, spaced apart from top to bottom jagged on the long narrow flag installation sleeve, when be pulled to jagged place through long narrow flag, the wheel on the end of billy gate is contained in the chute, and the sleeve pipe on the other end of billy gate passes breach through the long narrow flag installation sleeve and is sleeved on and wears on the flagpole.
The described body of rod is for being cylinder or up-small and down-big cone.
It is described that to wear flagpole be single piece or connected and composed by the more piece body of rod.
Described lower end of wearing flagpole is with clamp, and clamp is installed on the body of rod through screw.
Outside or the inner fixed pulley of installing of the described body of rod.
The bottom of the described body of rod is provided with base, between the base and the body of rod reinforcing rib is arranged.
Described base is rectangle or circle.
The adjusting bolt is installed on the described base.
Described wearing is equipped with on the flagpole through long narrow flag, is being arranged at intervals with breach on the installation sleeve of long narrow flag, and the sleeve pipe on the described billy gate passes breach on the long narrow flag installation sleeve and is sleeved on and wears on the flagpole.
The described body of rod is stainless steel or glass fiber reinforced plastic material or iron material matter.
The utility model is equipped with the lifting gear that is different from existing flagpole on the body of rod, because existing flagpole, as the red flag bar, red flag is shorter, red flag is being through it on flagpole before the liter, by halliard with red flag with wear the eminence that flagpole rises to flagpole, and the bar one of Tibetan area is than higher, and hang on the bar long through long narrow flag, general all is with the length that equals club shaft, such as 10-50 rice, if adopt this moment the lifting gear on traditional flagpole will be after the long narrow flag lifting is got on, owing to be not fixed on the body of rod through the long narrow flag lower part, whole is to rock everywhere through long narrow flag, since long through long narrow flag, therefore may injure near object, if greatly also can making the body of rod or wear flagpole, wind is subjected to heavy damage.Installation is when long narrow flag, since will with whole through long narrow flag along wear flagpole under be raised to, the bottom of wearing flagpole must be unsettled, without any barrier member, wear in the utility model that flagpole installs through long narrow flag, be on the body of long narrow flag installation sleeve, to have several breach from top to bottom at interval, when moving up along wearing flagpole through long narrow flag, move to first indentation, there through the long narrow flag installation sleeve, at this moment, wheel on one end of first billy gate is stuck in the chute, sleeve pipe on the other end of first billy gate passes through first breach of long narrow flag installation sleeve and is sleeved on and wears on the flagpole, like this, when through long narrow flag through the Circularly liftable rope on the fixed pulley when wearing flagpole and rise, because the wheel of first billy gate is contained in the chute and its sleeve pipe kink is being worn on the flagpole, therefore first billy gate is also along with following mobile through moving up of long narrow flag, when continuing to install second billy gate when flagpole is moved upwards up to second breach again along wearing through long narrow flag, by that analogy, up to billy gate all is installed on the breach of long narrow flag installation sleeve at all, and will rise to the top of wearing flagpole through long narrow flag, like this, whole very convenient in the rising installation process through long narrow flag, a people just can operate, in the time will needing to fall through long narrow flag, only need loosening halliard, under the gravity of long narrow flag, can descend rapidly, so lifting is all very convenient at self.Owing on the long narrow flag installation sleeve, have several breach from top to bottom at interval, when whole through long narrow flag be sleeved on wear flagpole after, it is whole through long narrow flag also is fixed on simultaneously chute on the body of rod by a plurality of billy gates on, like this, even reached 50 meters through long narrow flag, wearing flagpole and plurality of movable dolly can both guarantee to guarantee its stability and fastness under the influence of long narrow flag at wind-force.Last at clamp of bottom suit of wearing on the flagpole, one end of this clamp is enclosed within to be worn on the flagpole, the other end of clamp through screw on the body of rod, this clamp plays fixing effect (when installing through long narrow flag to wearing flagpole, the top of wearing flagpole is to be fixed on the body of rod, the bottom is unsettled), also can prevent from simultaneously to glide along wearing flagpole through long narrow flag.The body of rod of the utility model bar adopts non-wooden material; as stainless steel material or glass-reinforced plastic material or iron material; so not only make the ecological environment of Tibetan area receive protection; and body of rod appearance looks elegant, long service life; the body of rod in the utility model is for being cylinder or up-small and down-big cone, and it is very attractive in appearance that body of rod profile seems.
The beneficial effects of the utility model are: lifting is convenient, good stability, and fastness is strong, long service life, good looking appearance.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation of chute 3 in the utility model;
Fig. 3 is the structural representation of billy gate 4 in the utility model;
Fig. 4 is the structural representation of clamp 8 in the utility model;
Fig. 5 is through the structural representation of long narrow flag 7 in the utility model;
Fig. 6 is that the utility model is installed the structural representation behind long narrow flag 7;
Fig. 7 wears flagpole 2 to be installed in structural representation on the body of rod 6 in the utility model;
Fig. 8 is the scheme of installation of the body of rod 6 in the utility model.
The specific embodiment
The structure of a kind of bar of the utility model such as Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, shown in Figure 7, on the body of rod 6, be equipped with and wear flagpole 2 and chute 3, chute 3 is installed on the body of rod 6, the upper end of wearing flagpole 2 is installed on the body of rod 6, rising is when long narrow flag, its lower end is unsettled, be contained in through the installation sleeve d on it through long narrow flag 7 and wear on the flagpole 2, at spaced apart from top to bottom jagged a on the body of long narrow flag 7 installation sleeve d, when when long narrow flag is pulled to jagged place, wheel b on one end of billy gate 4 is contained in the chute 3, wheel on the billy gate 4 is two, sleeve pipe c on the other end of billy gate 4 passes the breach on long narrow flag 7 installation sleeves and is sleeved on and wears on the flagpole 2, rises along wearing flagpole 2 through the Circularly liftable rope of long narrow flag 7 on fixed pulley 1, on the two ends fixed pulley is installed respectively up and down at the body of rod.The described body of rod 6 is cylinder or up-small and down-big cone, and after the body of rod was fixing, stability and fastness were better.The described flagpole 2 worn connects and composes for single piece or by the more piece body of rod, wear flagpole 2 can for the more piece body of rod through being threaded formations, installation or removal make things convenient for like this.Described lower end of wearing flagpole 2 is with clamp 8, clamp 8 is installed on the body of rod 6 through screw, clamp 8 be installed in fully through long narrow flag 7 wear flagpole 2 after, wearing the lower end cover upper clip of flagpole 2, the clamp 8 of this moment can play fixation to wearing flagpole 2, can prevent from simultaneously to glide through long narrow flag 7.The described the body of rod 6 outer or body of rod 6 interior fixed pulleys 1 of installing.The bottom of the described body of rod 6 is provided with base 10, and base 10 is convenient to install on the ground through bolt, between the base 10 and the body of rod 6 reinforcing rib 13 is arranged, and the body of rod 6 is played stronger fastness, and base 10 can be rectangle or circle.The described body of rod 6 is stainless steel or glass fiber reinforced plastic material or iron material matter, has replaced the wooden body of rod, has reduced ecological disruption.
As shown in Figure 8, at underground pre-buried four or eight bolts 9 or more bolt 9, can increase or reduce according to actual conditions.On ground line, be embedded with and regulate iron plate 11, bolt 9 passes the screwed hole of regulating iron plate 11 from ground, the base 10 of the body of rod 6 lower ends is fixed on the bolt 9 through installation sleeve by nut, after the installation, regulate iron plate 11 and be positioned at base 10 bottoms, on the base 10 of the body of rod 6, be equipped with and regulate bolt 12, when the body of rod 6 and bottom surface out of plumb, can adjust by regulating bolt 12.Bolt 9 is owing to is connected with the base 10 of the body of rod 6, and bolt 9 at this moment can play lightning protection function, when bolt 9 is embedded in underground length when being lower than 2 meters, connects lightning protection in addition on bolt 9.
As Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, shown in Figure 7, the utility model is installed when long narrow flag, to be fixed on through the upper end of long narrow flag 7 on the circulation flagraising rope 5, to be installed in through the upper end of long narrow flag 7 installation sleeves on the lower end of wearing flagpole 2, the pulling circulation is hoisted a flag and is restricted 5, when first breach a place of being moved upwards up to through long narrow flag 7 on its installation sleeve, the wheel b of first billy gate 4 is contained in the chute 3, the sleeve pipe c of first billy gate 4 is passed in first breach a of long narrow flag 7, and the suit that makes progress from the lower end of wearing flagpole 2, the sleeve pipe c of first billy gate 4 is sleeved on wears on the flagpole 2, after first billy gate 4 installs, continue the pulling circulation rope 5 of hoisting a flag and make on long narrow flag 7 and move, when second breach a being moved upwards up to through long narrow flag 7 on its installation sleeve, second billy gate is installed again, install successively, whole being installed in through long narrow flag 7 worn on the flagpole 2, and last at clamp 8 of the lower end suit of wearing flagpole 7, clamp 8 is installed on the body of rod 6 through screw.

Claims (10)

1, a kind of bar, it is characterized in that: the upper end of wearing flagpole (2) is fixed on the body of rod (6), chute (3) is installed on the body of rod (6), and the wheel (b) on billy gate (4) one ends is contained in the chute (3), and the sleeve pipe (c) on billy gate (4) other end is sleeved on to be worn on the flagpole (2).
2, bar according to claim 1 is characterized in that: the described body of rod (6) is cylinder or up-small and down-big cone.
3, bar according to claim 1 is characterized in that: the described flagpole (2) of wearing connects and composes for single piece or by the more piece body of rod.
4, according to claim 1 or 3 described bars, it is characterized in that: described lower end of wearing flagpole (2) is with clamp (8), and clamp (8) is installed on the body of rod (6) through screw.
5, bar according to claim 1 is characterized in that: the outside or inner fixed pulley (1) of installing of the described body of rod (6).
6, bar according to claim 1 is characterized in that: the bottom of the described body of rod (6) is provided with base (10), between the base (10) and the body of rod (6) reinforcing rib (13) is arranged.
7, bar according to claim 6 is characterized in that: described base (10) is rectangle or circle.
8, according to claim 6 or 7 described bars, it is characterized in that: be equipped with on the described base (10) and regulate bolt (12).
9, bar according to claim 1, it is characterized in that: described wearing is equipped with on the flagpole (2) through long narrow flag (7), be arranged at intervals with breach (a) on the installation sleeve (d) of long narrow flag (7), the sleeve pipe (c) on the described billy gate (4) passes breach (a) through long narrow flag installation sleeve (d) and is sleeved on and wears on the flagpole (2).
10, bar according to claim 1 is characterized in that: the described body of rod (6) is stainless steel or glass fiber reinforced plastic material or iron material matter.
CN200920079304U 2009-02-27 2009-02-27 Prayer pole Expired - Lifetime CN201386418Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920079304U CN201386418Y (en) 2009-02-27 2009-02-27 Prayer pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920079304U CN201386418Y (en) 2009-02-27 2009-02-27 Prayer pole

Publications (1)

Publication Number Publication Date
CN201386418Y true CN201386418Y (en) 2010-01-20

Family

ID=41578948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920079304U Expired - Lifetime CN201386418Y (en) 2009-02-27 2009-02-27 Prayer pole

Country Status (1)

Country Link
CN (1) CN201386418Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103272380A (en) * 2013-05-15 2013-09-04 江苏金陵体育器材股份有限公司 Corner flag used in football field
CN104007858A (en) * 2014-06-06 2014-08-27 李香秀 Supporting follow-up device for mouse data line

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103272380A (en) * 2013-05-15 2013-09-04 江苏金陵体育器材股份有限公司 Corner flag used in football field
CN103272380B (en) * 2013-05-15 2015-09-16 江苏金陵体育器材股份有限公司 For the corner flag in football pitch
CN104007858A (en) * 2014-06-06 2014-08-27 李香秀 Supporting follow-up device for mouse data line
CN104007858B (en) * 2014-06-06 2016-09-28 慈溪市宝日电器有限公司 A kind of picking-up hunting gear of mouse data line

Similar Documents

Publication Publication Date Title
CN102570372B (en) Electrified lead deicer
CN201386418Y (en) Prayer pole
CN102613039B (en) A kind of large-span sunshade net device
CN101492978B (en) Ma-ni lever
CN202487084U (en) Curtain rolling screen
CN103840396A (en) Method for replacing lightning conductor on high-voltage iron towers
CN203022408U (en) Anchor cable pull rope structure for stabilizing wire pole
CN206719483U (en) A kind of anchor for being used to adjust photovoltaic floating body waterborne
CN202444998U (en) Aquaculture fixed platform mechanical fishing device
CN204860385U (en) Trees strutting arrangement is used in gardens
CN203707676U (en) Isolation net for replacement of high voltage iron tower lightning wire or composite ground wire
CN202503979U (en) Snake gourd shed frame
CN204047402U (en) Shelter from heat or light device in super fine tea powder raw material production tea place
CN205082374U (en) Trees securing device
CN208509671U (en) One planting fruit-trees sizing fixed frame
CN202503978U (en) Chinese gooseberry ventilation canopy frame
CN205235379U (en) Stress on both hands steel wire bridge of lifting rope walking
CN203475352U (en) Road green barrier
CN203237256U (en) Simple mining car blocking fence
CN204655917U (en) Novel high pin is competed for speed device
CN205604815U (en) Fastening and antiskid of pole
CN205596991U (en) Block bird device
CN206053394U (en) The passive protection net that a kind of shackle is coupled
CN205108971U (en) Can store basketball basket of net
CN203977748U (en) A kind of hollow balcony railing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20100120

Effective date of abandoning: 20090227