CN201376655Y - Concrete tank ship - Google Patents
Concrete tank ship Download PDFInfo
- Publication number
- CN201376655Y CN201376655Y CN200920079681U CN200920079681U CN201376655Y CN 201376655 Y CN201376655 Y CN 201376655Y CN 200920079681 U CN200920079681 U CN 200920079681U CN 200920079681 U CN200920079681 U CN 200920079681U CN 201376655 Y CN201376655 Y CN 201376655Y
- Authority
- CN
- China
- Prior art keywords
- concrete
- ship
- tank
- belt conveyor
- band conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a concrete tank ship, which is characterized in that the concrete tank ship consists of a ship body, concrete stirring tanks, a U-shaped belt conveyor, a bracket and a distribution beam, and a power station. The concrete stirring tanks are arranged on the bracket; a feeding hopper is arranged above one end of a tank body; the U-shaped belt conveyor is arranged below the middle of the two concrete stirring tanks; a U-shaped belt conveyor collecting hopper and two concrete stirring tanks are arranged between the U-shaped belt conveyor and the ship with the two concrete stirring tanks; the U-shaped belt conveyor is arranged on a floor board through the bracket and the distribution beam; and the power station is provided with a diesel engine and a distributing hydraulic oil tank to drive an oil pressure motor to work. The concrete tank ship adopts the using principle that the concrete tank bodies are arranged on the ship, the engine adopting diesel provides power for rotation of the concrete tank bodies, the belt conveyor conveys the concrete to a conveyor pump, and the conveyor pump conveys the concrete to the concrete pouring points, therefore different construction schemes need to suit the local conditions, more comparisons need to be carried out to minimize the project cost, and the purpose of economic and social benefits is achieved.
Description
Technical field:
The utility model relates to building jar ship, specifically is a kind of concrete tank ship.
Background technology:
For carrying out the stirring of concrete material in the building engineering scene of satisfying coastal and interior ground river waters, according to carrying the cast requirements of one's work, or away from the island on land or building ground and near to be provided with the cement concrete manufacturing equipment local or the place of cement concrete manufacturing equipment is arranged is will pass through newly-built concrete making apparatus under the situation of businessman's monopolization, building of concrete that target carries out, but as adopt the construction of said method manufacturing equipment or remove and all need a huge expense expense, the time spent must guarantee that a bigger place is used to build the concrete manufacturing equipment.
The utility model content:
The purpose of this utility model provides a kind of concrete that loads and makes the concrete boat of carrying on deck in ship structure, promptly reduce expenses, can be used for again special construction site, therefore has high economic benefit and social benefit.
The technical solution of the utility model is to realize like this, a kind of concrete tank ship, it is characterized in that by hull, concrete drums and stirring hoop, U type band conveyor, support and distribution beam, power station constitutes, the ready-mixed concrete jar is located on the concrete truck tank bracket, the one end top of tank body is provided with loading hopper, two concrete drums below therebetween are provided with U type band conveyor, establish U type band conveyor aggregate bin between U type band conveyor and the two concrete drums ships, two concrete drums, U type band conveyor is installed on the cabin base plate by the support distribution beam, power station is provided with diesel engine, fuel tank is pressed in dosing, drives hydraulic motor work.
Described band conveyor mounted angle is the 0-6 degree.
Described distribution beam material is an I-beam section.
Concrete tank ship use principle will be adorned concrete tank body exactly and lay aboard ship, the driving engine of employing diesel oil provides the power of cement concrete tank body rotation, the employing band conveyor in transmission pump, arrives the concreting point with transmission pump with transmission and concrete transmission with transmission and concrete transmission.
Advantage of the present utility model: the concrete boat use principle will be adorned concrete tank body exactly and lay aboard ship, the driving engine of employing diesel oil provides the power of cement concrete tank body rotation, the employing band conveyor in transmission pump, arrives the concreting point with transmission pump with transmission and concrete transmission with transmission and concrete transmission.Adopt any arrangement and method for construction to suit measures to local conditions in a word, compare more, project cost is minimized, reach purpose with economic benefit and social benefit.
Description of drawings:
Fig. 1 is a plane structure chart of the present utility model
Fig. 2 is that the A-A of Fig. 1 analyses and observe result schematic diagram
Fig. 3 is Fig. 2 B-B cutaway view
Wherein: 1, hull; 2, concrete drums; 3, inlet point; 4, hydraulic reservoir; 5, stirred pot support; 6, U type band conveyor aggregate bin; 7, U type band conveyor; 8, distribution beam; 9, power station;
The specific embodiment:
Shown in Fig. 1-3, a kind of concrete tank ship, by hull 1, concrete drums 2, U type band conveyor 7, support 5 and distribution beam 8, power station 9 constitutes, be equipped with two stirred pots on its every the concrete jar ship, a U type band conveyor, a power station, ready-mixed concrete jar 2 is located on the support 5, the one end top of tank body is provided with loading hopper 6, two concrete drums 2 below therebetween are provided with U type band conveyor 7, establish U type band conveyor aggregate bin 6 between U type band conveyor 7 and the two concrete drums ships, two concrete drums 2, U type band conveyor 7 is by support 5, distribution beam 8 is installed on the cabin base plate, the concrete truck tank bracket is welded on the I 25 I-beam section distribution beam, I 25 I-beam sections are welded on the cabin base plate, guarantee that it is solid and reliable, and can suitably adjust the size and the height of distribution beam according to the cabin degree of depth, can be in the transmission pump on bank to make things convenient for U type band conveyor with transmission and concrete transmission, power station is provided with diesel engine, fuel tank 4 is pressed in dosing, drives hydraulic motor work.Described band conveyor 7 mounted angles are the 0-6 degree.Described distribution beam 8 materials are the I25 I-beam section.
Shown in Fig. 1-3, adopt the method need be with two transmission pumps, one be connected in the mixing plant, and to the jar ship, one is used near the concreting, and the transmission and concrete transmission on the jar ship is gone into mould with transmission and concrete transmission.This scheme successfully solves cement concrete transportation problem, according to the actual conditions of this project, adopts two jar ships, joins two 9m on every jar ship
3Rotatable tank body.By rational allocation, strengthen transmission pump operational throughput etc.Adopting this programme transportation cement concrete, can replace the large-scale underwater foundation needed mixing station waterborne that constructs on the one hand, is over-water construction supply cement concrete, saves the measure expense of setting up mixing station waterborne greatly.Can be used for special construction site on the other hand, works all be arranged, but another bank is not suitable for setting up mixing station, can adopt the mode of water transportation to solve the transportation of block concrete as two sides.Three, as the two sides condition of all building a station, but it is higher to set up two mixing station expenses, as adopts this arrangement and method for construction, under condition permission situation, adopt a mixing station, can save the expense at a station, improve the utilization ratio of having built mixing station, also the construction cost on the saving project greatly.Adopt any arrangement and method for construction to suit measures to local conditions in a word, compare more, project cost is minimized, reach the purpose of saving project cost.
Claims (3)
1, a kind of concrete tank ship, it is characterized in that by hull (1), concrete drums (2), U type band conveyor (7), support (5) and distribution beam (8), power station (9) constitutes, ready-mixed concrete jar (2) is located on the concrete support (5), the one end top of tank body is provided with loading hopper (3), two concrete drums (2) below therebetween are provided with U type band conveyor (7), establish U type band conveyor aggregate bin (6) between U type band conveyor (7) and the two concrete drums ships, two concrete drums (2), U type band conveyor (7) is installed on the cabin base plate by support (5) and distribution beam (8), power station is provided with diesel engine, fuel tank (4) is pressed in dosing, drives hydraulic motor work.
2, a kind of concrete tank ship according to claim 1 is characterized in that band conveyor (7) mounted angle is the 0-6 degree.
3, a kind of concrete tank ship according to claim 1 is characterized in that distribution beam (8) material is an I-beam section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920079681U CN201376655Y (en) | 2009-03-20 | 2009-03-20 | Concrete tank ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920079681U CN201376655Y (en) | 2009-03-20 | 2009-03-20 | Concrete tank ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201376655Y true CN201376655Y (en) | 2010-01-06 |
Family
ID=41516754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920079681U Expired - Fee Related CN201376655Y (en) | 2009-03-20 | 2009-03-20 | Concrete tank ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201376655Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105014792A (en) * | 2015-07-20 | 2015-11-04 | 嘉兴高通混凝土有限公司 | Multifunctional water concrete mixing ship |
-
2009
- 2009-03-20 CN CN200920079681U patent/CN201376655Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105014792A (en) * | 2015-07-20 | 2015-11-04 | 嘉兴高通混凝土有限公司 | Multifunctional water concrete mixing ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201245235Y (en) | Deep water jackstone leveling ship | |
CN103144743B (en) | Integral sludge solidification ship | |
US20140338321A1 (en) | Novel floating eagle type wave power generating device with semi-submersible characteristic | |
CN104260209B (en) | Waterborne mobile concrete stirring boat in inland waterway | |
CN203345167U (en) | Movable jack-up artificial island | |
CN105484307A (en) | Chain bucket dredger | |
CN206635654U (en) | A kind of barging device of underwater narrow-bore tunnel super long type prefabricated case beam | |
CN102963494A (en) | Buoyancy mounting method for blocks | |
CN201376655Y (en) | Concrete tank ship | |
CN215053031U (en) | High-precision environment-friendly riprap leveling ship | |
CN109322309A (en) | The construction method that greater coasting area offshore concrete pours | |
CN203937832U (en) | A kind of combination is refuted | |
CN101941510A (en) | Method for improving ship handling efficiency of containers (or bulk cargo) and equipment thereof | |
CN206230683U (en) | A kind of bridge construction concrete central mix plant | |
CN2687006Y (en) | Submersible semi-submerged barge | |
CN203946246U (en) | For transporting the hydrophyte of water surface cleaning ship collection and the carrier of floating debris | |
CN204322301U (en) | A kind of cruiseway Waterborne movable concrete mixer vessel | |
CN104846813B (en) | A kind of mixing pile ship for the construction of Underwater Soft Foundation plinth | |
CN201883414U (en) | Bollard structure of lower platform of double-layer dock | |
CN201334925Y (en) | Horizontal sand silo for mine filling | |
CN209755717U (en) | Concrete mixing and distributing ship set | |
CN204626391U (en) | A kind of agitation pile ship for the construction of Underwater Soft Foundation plinth | |
CN209367900U (en) | A kind of flusher being easily assembled to Rapid Implementation | |
CN212859942U (en) | Portable concrete system of stirring on water mixes device and system | |
CN203199156U (en) | Integrated sludge curing vessel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100106 Termination date: 20180320 |