CN201371927Y - Hypostyle SPAR platform mooring cable arrangement structure - Google Patents

Hypostyle SPAR platform mooring cable arrangement structure Download PDF

Info

Publication number
CN201371927Y
CN201371927Y CN200920104815U CN200920104815U CN201371927Y CN 201371927 Y CN201371927 Y CN 201371927Y CN 200920104815 U CN200920104815 U CN 200920104815U CN 200920104815 U CN200920104815 U CN 200920104815U CN 201371927 Y CN201371927 Y CN 201371927Y
Authority
CN
China
Prior art keywords
mooring line
mooring
spar platform
hypostyle
spar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920104815U
Other languages
Chinese (zh)
Inventor
彭程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Ship Design & Research Center Co Ltd
Original Assignee
China Ship Design & Research Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Ship Design & Research Center Co Ltd filed Critical China Ship Design & Research Center Co Ltd
Priority to CN200920104815U priority Critical patent/CN201371927Y/en
Application granted granted Critical
Publication of CN201371927Y publication Critical patent/CN201371927Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a hypostyle SPAR platform mooring cable arrangement structure. A mooring cable (2) is connected with a peripheral column (4) of a hypostyle SPAR platform hard cabin (1) through a cable chock (3). The hypostyle SPAR platform mooring cable arrangement structure is characterized by being composed of four groups of mooring cables (2), each two adjacent groups of mooring cables (2) have an interval of 90 DEG, and the adjacent mooring cables (2) in each group have an interval of 5 DEG; the mooring cables (2) are respectively arranged on the outer surface of the peripheral column (4), the number and the specification of the mooring cables (2) in each group are determined through calculation, and the other end of the mooring cable (2) is connected with seabed anchoring foundation. Each mooring cable (2) consists of an upper end anchor chain (5), a middle end anchor chain (6) and a lower end anchor chain (7). The arrangement structure is suitable for the hypostyle SPAR platform with eight peripheral columns. Meanwhile, the structure has good withstand effect to wave and current in any direction.

Description

A kind of polystyle SPAR platform mooring line arrangement structure
Technical field
The utility model relates to a kind of arrangement structure of polystyle SPAR platform mooring line, particularly has the polystyle SPAR platform of eight peripheral cylinders.
Background technology
The SPAR platform is a kind of of offshore platform, and it is applicable to from 300 meters deep-seas to 3000 meters of the depth of waters of the depth of water, can exploit the work of aspects such as oil gas, drilling and repairing well.Part between the bottom is called hard cabin to the SPAR main platform body from the main body flying deck to variable ballast tank.The SPAR platform has multiple pattern, the SPAR platform can be divided into two big classes according to its hard cabin pattern, and a class is open side type SPAR, and its hard cabin part is made up of single cylinder; Another kind of is polystyle SPAR, and its hard cabin part is made up of some cylinders than minor diameter.Polystyle SPAR periphery has six or eight isodiametric cylinders.
The SPAR platform for reducing the displacement of platform under effects such as stormy waves stream, needs to arrange mooring line usually when marine work.The layout of mooring line is relevant with platform hard cabin pattern, and the mooring line arrangement structure that the polystyle platform is commonly used has two kinds at present, respectively corresponding two kinds of different platform hard cabin structures:
The one, the platform hard cabin is surrounded by six isodiametric cylinders, arranges a mooring line between per two adjacent cylinders, altogether the six roots of sensation.This arrangement can reduce the disturbance of mooring line to the current that flow through periphery, but because the mooring line radical is less, needs higher mooring line specification.
The 2nd, the platform hard cabin is surrounded by a central cylindrical and six isodiametric peripheral cylinders, arranges mooring line at peripheral cylindrical outer surface, arranges three groups altogether, is separated by 120 ° between every group, three mooring lines is arranged, 5 ° at interval of adjacent mooring lines in every group.This arrangement only is applicable to the pattern of six peripheral cylinders, is not suitable for the pattern of eight peripheral cylinders.
The utility model content
The purpose of this utility model is to design a kind of polystyle SPAR platform mooring line arrangement structure with eight peripheral cylinders that is applicable at the deficiency of existing polystyle SPAR platform mooring line arrangement structure.The utility model is characterised in that the mooring line layout is made of four groups of mooring lines, the interval is 90 ° between the two adjacent groups mooring line, be spaced apart 5 ° in every group between the adjacent mooring line, mooring line is arranged in the outside face of peripheral cylinder, the radical of mooring line, specification determine that by calculating the mooring line other end links to each other with the seabed anchor foundation in every group.
The outside face of the peripheral cylinder of described polystyle SPAR flat-bed is provided with mooring pipe, is used to connect mooring line.
Described mooring line is made up of three parts, is respectively that upper end anchor chain, middle-end connect, the lower end anchor chain.Wherein the middle-end connection can adopt wirerope also can adopt the polyester cable.The length of upper end anchor chain will guarantee that the middle-end connection can not touch the SPAR main platform body, and the length of lower end anchor chain will guarantee that the middle-end connection can not touch the seabed.
The point of connection of the peripheral cylinder of described mooring line and polystyle SPAR platform all is in the sustained height place.
A kind of polystyle SPAR platform mooring line arrangement structure of the present utility model is suitable for and has the platform in the polystyle SPAR of eight peripheral cylinders, can select only mooring line radical and specification by calculating, and reach the effect that reduces cost.Simultaneously the utility model all has the stormy waves stream of any direction and well resists effect, is specially adapted to the marine site that environmental data lacks.
Description of drawings
Fig. 1 is the utility model side schematic view.
Fig. 2 is the front elevation of Fig. 1.
Fig. 3 is a structural representation of the present utility model.
Among the figure: 1 is polystyle SPAR platform hard cabin, and 2 is mooring line, and 3 is mooring pipe, and 4 enclose cylinder out of my cabin for polystyle SPAR platform hard, and 5 is mooring line upper end anchor chain, and 6 are the connection of mooring line middle-end, and 7 is mooring line lower end anchor chain.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described.
As depicted in figs. 1 and 2, polystyle SPAR platform hard cabin 1 is outer to be with eight peripheral cylinders 4, and mooring line 2 is divided into four groups, and between the two adjacent groups mooring line 90 ° at interval, in same group between adjacent two mooring lines 5 ° at interval.Every mooring line 2 all is arranged in peripheral cylinder 4 outside faces by mooring pipe 3.The quantity of mooring line 2 and specification can be determined according to calculating.
As shown in Figure 3, the mooring line upper end is connected with peripheral cylinder 4 by mooring pipe 3, and the lower end is connected with the seabed anchor foundation.Mooring line 2 is made up of upper end anchor chain 5, middle-end connection 6, lower end anchor chain 7.The length of upper end anchor chain 5 will guarantee that middle-end connects 6 and can not touch the SPAR main platform body, and the length of lower end anchor chain 7 will guarantee that middle-end connects 6 and can not touch the seabed.
When SPAR platform during marine moving, can cause the change of mooring line 2 shapes, produce a restoring force, reduce the flat-bed displacement.Motion in any direction all has good restriction to the utility model to the SPAR platform.
The utility model is applicable to the polystyle SPAR platform of eight cylinders, can select only mooring line radical and specification by calculating, and reaches the effect that reduces cost.Simultaneously the utility model all has the stormy waves stream of any direction and well resists effect, is specially adapted to the marine site that environmental data lacks.

Claims (2)

1, a kind of polystyle SPAR platform mooring line arrangement structure, mooring line (2) is connected with the peripheral cylinder (4) in polystyle SPAR platform hard cabin (1) by mooring pipe (3), it is characterized in that the mooring line layout is made of four groups of mooring lines (2), the interval is 90 ° between the two adjacent groups mooring line (2), be spaced apart 5 ° in every group between the adjacent mooring line (2), mooring line (2) is arranged in the outside face of peripheral cylinder (4), mooring line (2) other end links to each other with the seabed anchor foundation, and every mooring line (2) is by upper end anchor chain (5), middle-end connects (6), lower end anchor chain (7) is formed.
2, a kind of polystyle SPAR platform mooring line layout pattern according to claim 1 is characterized in that it can be wirerope that middle-end connects (6), also can be the polyester cable.
CN200920104815U 2009-01-06 2009-01-06 Hypostyle SPAR platform mooring cable arrangement structure Expired - Fee Related CN201371927Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920104815U CN201371927Y (en) 2009-01-06 2009-01-06 Hypostyle SPAR platform mooring cable arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920104815U CN201371927Y (en) 2009-01-06 2009-01-06 Hypostyle SPAR platform mooring cable arrangement structure

Publications (1)

Publication Number Publication Date
CN201371927Y true CN201371927Y (en) 2009-12-30

Family

ID=41498010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920104815U Expired - Fee Related CN201371927Y (en) 2009-01-06 2009-01-06 Hypostyle SPAR platform mooring cable arrangement structure

Country Status (1)

Country Link
CN (1) CN201371927Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103224007A (en) * 2013-04-17 2013-07-31 哈尔滨工程大学 Multi-floating-body mooring device for floating ocean platform
CN105705415A (en) * 2013-10-30 2016-06-22 智康风能Ip有限公司 Support structure floating in the open sea and connected to anchors by bracing means, for wind turbines, service stations, or converter stations
CN106697201A (en) * 2016-12-13 2017-05-24 中国海洋石油总公司 Single point mooring transferring buoy and multi-column type floating body thereof
CN108945307A (en) * 2018-07-12 2018-12-07 上海理工大学 A kind of anchoring system for floatation type wind energy conversion system Spar platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103224007A (en) * 2013-04-17 2013-07-31 哈尔滨工程大学 Multi-floating-body mooring device for floating ocean platform
CN105705415A (en) * 2013-10-30 2016-06-22 智康风能Ip有限公司 Support structure floating in the open sea and connected to anchors by bracing means, for wind turbines, service stations, or converter stations
CN106697201A (en) * 2016-12-13 2017-05-24 中国海洋石油总公司 Single point mooring transferring buoy and multi-column type floating body thereof
CN106697201B (en) * 2016-12-13 2018-10-23 中国海洋石油总公司 Floating drum transfers in single point mooring
CN108945307A (en) * 2018-07-12 2018-12-07 上海理工大学 A kind of anchoring system for floatation type wind energy conversion system Spar platform

Similar Documents

Publication Publication Date Title
CN103129715B (en) Conduit-rack semi-submersible type oil-extraction platform
CN111469992A (en) Floating offshore wind power structure foundation with damping effect and stability control method
CN201371927Y (en) Hypostyle SPAR platform mooring cable arrangement structure
CN210653580U (en) Offshore wind power platform group with shared mooring
CN103600818B (en) A kind of regulatable semisubmersible platform in buoyancy aid direction and regulate and control method
CN107140138A (en) A kind of dry tree oil storage semi-submersible type production platform of deep drinking water
CN110654510A (en) Offshore wind power platform group with shared mooring
CN203819467U (en) Ocean platform positioning system
CN103482036A (en) Buoyancy tower type ocean platform
CN206012900U (en) A kind of light-duty semi-submersible type production platform of high payload ratio
CN103395481B (en) Production and mooring system for sea floating type oil extraction platform and operating method thereof
CN106114774B (en) A kind of light-duty semi-submersible type production platform of high payload ratio
CN210653579U (en) Offshore wind power platform group sharing mooring point
CN2815871Y (en) Strong-anti-outer-force high stability on-sea platform
CN104029799A (en) Box-type lower floating body multi-stand-column-type semi-submersible platform
CN203486110U (en) Buoyant-tower-type ocean platform
CN203684192U (en) Offshore jacket production platform
CN110758662A (en) Movable free-rising and sinking storm platform
CN203439237U (en) Production and mooring system for sea floating type oil extraction platform
CN203767043U (en) Tension leg platform
CN205524857U (en) Take how much truss -like stand platforms in oil storage tank
CN202609060U (en) Underwater oil storage and outward conveying system used in deep sea
CN201842225U (en) Semi-submersible platform
CN211032946U (en) Movable free-rising and sinking storm platform
CN103465742B (en) The latent amphibious working ship of walking half

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091230

Termination date: 20180106

CF01 Termination of patent right due to non-payment of annual fee