CN201362807Y - Track girder subgrade for large walking crane - Google Patents
Track girder subgrade for large walking crane Download PDFInfo
- Publication number
- CN201362807Y CN201362807Y CNU2009200677488U CN200920067748U CN201362807Y CN 201362807 Y CN201362807 Y CN 201362807Y CN U2009200677488 U CNU2009200677488 U CN U2009200677488U CN 200920067748 U CN200920067748 U CN 200920067748U CN 201362807 Y CN201362807 Y CN 201362807Y
- Authority
- CN
- China
- Prior art keywords
- concrete
- track girder
- subgrade
- track beam
- tower crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The utility model relates to a track girder subgrade for a large walking crane. The track girder subgrade comprises a concrete bearing platform, and is characterized in that a concrete track girder is arranged above the concrete bearing platform, wherein wheel rails are placed at the upper end of the concrete track girder; and soft fiber boards are arranged between the concrete bearing platform and the concrete track girder. The track girder subgrade with the structure can achieve more rapid and convenient construction, lower the construction cost and provide conditions for large-area constructions.
Description
Technical field:
The utility model relates to a kind of large-scale stepped type tower crane field, particularly a kind of rail beam roadbed that is used for large-scale stepped type tower crane.
Background technology:
In order to solve the large-scale stepped type tower crane of ZSL55145 (1060t.m) roadbed, as adopt the steel plate subgrade case must special subgrade case, cost on making or leasing is very expensive, adopt the steel plate subgrade case on the other hand, according to construction requirement, steel plate subgrade case total length reaches 1152 meters, does not have so many special subgrade case on the market at all.
Summary of the invention:
The purpose of this utility model is a kind of rail beam roadbed that is used for large-scale stepped type tower crane, can address the above problem.
To achieve these goals, the technical solution of the utility model is as follows: a kind of rail beam roadbed that is used for large-scale stepped type tower crane, comprise the concrete cushion cap, it is characterized in that concrete cushion cap top is provided with the concrete track beam, this concrete track beam upper end is provided with rail, is provided with soft fiberboard between concrete cushion cap and the concrete track beam.
Adopt such structure, make that construction is more convenient, more reduced construction cost, for large-area construction provides condition.
The utility model
Description of drawings:
Accompanying drawing is a structural representation of the present utility model
The specific embodiment:
Below in conjunction with drawings and Examples the utility model is elaborated.
A kind of rail beam roadbed that is used for large-scale stepped type tower crane comprises concrete cushion cap 1, it is characterized in that concrete cushion cap 1 top is provided with concrete track beam 2, and these concrete track beam 2 upper ends are provided with rail 3, are provided with soft fiberboard 4 between concrete cushion cap 1 and the concrete track beam 2.Rail 3 is as the walking rail of tower crane, soft fiberboard 4 be used between concrete track beam 2 and the concrete cushion cap 1 effective separation and as bed die.
According to an embodiment, be used for ZSL55145 (1060t.m) stepped type tower crane cast-in-situ concrete rail beam ground, the concrete track beam is in place builds, and the planeness of concrete track beam position and rail beam is just controlled by ZSL55145 (1060t.m) stepped type tower crane arrangement requirement and instructions for use.When finding that as rail beam sedimentation exceeds 60mm, the scene can adopt ZSL55145 (1060t.m) stepped type tower crane to adjust, and the every 12m segmentation of concrete track beam is built, deadweight 35t.ZSL55145 (1060t.m) stepped type tower crane is in the 26.5m radius of clean-up, and biggest lifting capacity 40t capable of hoisting satisfies the requirement of lifting capacity.The scene considers because the cast in situs of concrete track beam, soft fiberboard 4 that may adopt and concrete cushion cap 1 fail to isolate fully between reinforcing, therefore on-the-spot special small-sized portal frame, two ends at 12m concrete track beam, utilize the lifting built-in fitting of burying underground in advance as suspension centre, utilize the jack of 50t to carry the empty issuable settlement issues of concrete track beam that solves.
Claims (1)
1, a kind of rail beam roadbed that is used for large-scale stepped type tower crane comprises the concrete cushion cap, it is characterized in that concrete cushion cap top is provided with the concrete track beam, and this concrete track beam upper end is provided with rail, is provided with soft fiberboard between concrete cushion cap and the concrete track beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009200677488U CN201362807Y (en) | 2009-02-16 | 2009-02-16 | Track girder subgrade for large walking crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009200677488U CN201362807Y (en) | 2009-02-16 | 2009-02-16 | Track girder subgrade for large walking crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201362807Y true CN201362807Y (en) | 2009-12-16 |
Family
ID=41473467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2009200677488U Expired - Lifetime CN201362807Y (en) | 2009-02-16 | 2009-02-16 | Track girder subgrade for large walking crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201362807Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108277704A (en) * | 2018-01-05 | 2018-07-13 | 中铁工程设计咨询集团有限公司 | A kind of straddle-type monorail composite bridge track and its construction method |
-
2009
- 2009-02-16 CN CNU2009200677488U patent/CN201362807Y/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108277704A (en) * | 2018-01-05 | 2018-07-13 | 中铁工程设计咨询集团有限公司 | A kind of straddle-type monorail composite bridge track and its construction method |
CN108277704B (en) * | 2018-01-05 | 2023-08-08 | 中铁工程设计咨询集团有限公司 | Straddle type monorail combined bridge rail bearing platform and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201089696Y (en) | Spar boom of explosion-proof suspension crane | |
CN202131563U (en) | Combined gate type bridge pier for one-step suspension in position of steel crossbeam | |
CN201419626Y (en) | hydraulic suspension mechanism | |
CN201619972U (en) | Caterpillar crane provided with caterpillar type super-hoisting counterweight car | |
CN102060241A (en) | Universal crane for construction process of high-speed railway sound barrier | |
CN201932846U (en) | Universal crane used in construction process of high-speed railway noise barrier | |
CN201362807Y (en) | Track girder subgrade for large walking crane | |
CN202880701U (en) | Trackless gantry crane | |
CN210366808U (en) | Lifting and dismantling device for rail walking | |
CN202000221U (en) | Ballastless track structure for steep slope subgrade | |
CN204529248U (en) | Vehicle-mounted mobile platform is installed in gobo lifting | |
CN201128876Y (en) | Horizontal movement device for box girder segment of viaduct bridge | |
CN207373758U (en) | A kind of big draw box mechanism in Novel clean intelligent mobile station | |
CN204530506U (en) | End bay closing device | |
CN203904840U (en) | Novel frame bridge jacking jigger | |
CN203891055U (en) | Steel-structure base device for tower crane | |
CN201695287U (en) | Ballastless track pouring trolley | |
CN202657861U (en) | Pipeline assembly trolley | |
CN207312376U (en) | A kind of stable big draw box mechanism in intelligent mobile station | |
CN202913360U (en) | Bridge floor rotary hoisting device | |
CN205576656U (en) | Rail that bridge floor railway was laid welds rail production line | |
CN201087075Y (en) | Trackless portal jib crane | |
CN206345616U (en) | A kind of building tower crane of stable safety | |
CN201971595U (en) | Factory building crane beam height adjustment device | |
CN201024051Y (en) | All-hydraulic rail-free type gantry crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20091216 |