CN202657861U - Pipeline assembly trolley - Google Patents

Pipeline assembly trolley Download PDF

Info

Publication number
CN202657861U
CN202657861U CN 201220337141 CN201220337141U CN202657861U CN 202657861 U CN202657861 U CN 202657861U CN 201220337141 CN201220337141 CN 201220337141 CN 201220337141 U CN201220337141 U CN 201220337141U CN 202657861 U CN202657861 U CN 202657861U
Authority
CN
China
Prior art keywords
longeron
well
pipeline
pound
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220337141
Other languages
Chinese (zh)
Inventor
刘洪彬
张继宇
刘培勋
李杲
刘国章
杨丰华
刘玉森
刘龙
都意
尹志凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN HUANGHE ENGINEERING Co Ltd
Original Assignee
HENAN HUANGHE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN HUANGHE ENGINEERING Co Ltd filed Critical HENAN HUANGHE ENGINEERING Co Ltd
Priority to CN 201220337141 priority Critical patent/CN202657861U/en
Application granted granted Critical
Publication of CN202657861U publication Critical patent/CN202657861U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a pipeline assembly trolley. The trolley comprises an upper frame consisting of a pair of upper longitudinal beams and a pair of upper cross beams, wherein a stand column is arranged on the lower side of the upper frame, and the lower end of the stand column is connected with a lower longitudinal beam; an upper longitudinal beam rail is arranged inside each upper longitudinal beam, and a pound-shaped beam structure is arranged inside the upper longitudinal beam rail; the pound-shaped beam structure comprises cross beams of the pound-shaped beam and longitudinal beams of the pound-shaped beam; two ends of each cross beam of the pound-shaped beam are matched with the upper longitudinal beam rail through a traveling bearing, and two ends of each longitudinal beam of the pound-shaped beam are matched with the rail inside the cross beams of the pound-shaped beam through the traveling bearing; and a chain block is arranged on the longitudinal beam of the pound-shaped beam. The pipeline assembly trolley is simple in structure and practical in functions, can well complete the adjustment to the position of a pipeline to be assembled in a three-dimensional direction, and can guarantee quick location and assembly of the pipeline.

Description

A kind of pipeline is installed chassis
Technical field
The utility model relates to a kind of pipeline chassis is installed.
Background technology
At present, large-scale pipeline is installed normal large-tonnage wheel crane or the gauntry crane of adopting and is installed because bore is large, weight is large.Prior art existing problems and not enough: utilize large-tonnage vapour crane pipe laying to have very strong manoevreability and alerting ability, shortcoming is often to be subjected to the restriction of workyard and to increase constructional difficulties.Large-scale pipeline is installed needs the multi-section large tonnage crane unite use usually, and the cooperation between the crane, commander's difficulty are very large.The large tonnage crane arm is long, and pipeline installation fineness is high, and installation rate is slow, and is high to the operating personal technical requirements.The operating costs of large tonnage crane is high, takies personnel many.
The gauntry crane pipe laying has the advantages such as speed of application is fast, the personnel that take are few, efficient is high, quality is good, safe.Shortcoming is limited by on-the-spot place, and the other gauntry crane track of need to mating formation has requirement to intensity, the planeness of track foundation, and the track construction cycle of mating formation is long, and expense is high.
The utility model content
The utility model provides a kind of pipeline that chassis is installed, and greatly improves the ability that pipeline is installed, and reduces the expense that pipeline is installed, and guarantees the quality that pipeline is installed.
In order to solve the problems of the technologies described above, the utility model adopts following technical scheme: a kind of pipeline is installed chassis, comprises the upper frame that is comprised of a pair of upper longeron and a pair of entablatrance, and the upper frame downside is provided with column, and the lower end of column connects by lower longeron; Upper longeron inboard is provided with the longeron track, be provided with " well " word girder construction in the upper longeron track, described " well " word girder construction comprises " well " word beam crossbeam and " well " word beam longeron, " well " word beam crossbeam two ends cooperate with upper longeron track by the walking bearing, and " well " word beam longeron two ends cooperate by the inboard track that arranges of walking bearing and " well " word beam crossbeam; On " well " word beam longeron chain and tackle block is installed.
Be provided with diagonal brace between column middle and lower part and the entablatrance.
Column and upper longeron, lower longeron junction are provided with reinforced company's fishplate bar.
Column arranges six, respectively perpendicular to upper longeron setting and be separately positioned on upper longeron two ends and central authorities.
The utility model is simple in structure, practical function, and the fine position adjustment of finishing on the pipeline stereoscopic three-dimensional direction to be installed has guaranteed fast in place and installation of pipeline.
The utility model specifically has following advantage: chassis processing is simple, and installation, conveniently moving are easy and simple to handle, and convenient the popularization is with low cost; The chassis pipe laying is quick, required artificial few, and expense is low; The chassis size can be manufactured according to bore and place, the camp site situation amount body of pipe laying; Trolley running available elevator machine travel in place or machinery (bulldozer) mode of traction.
Description of drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is lateral plan of the present utility model;
Fig. 3 is the structural representation of " well " word girder construction.
The specific embodiment
Embodiment: as Figure 1-3, a kind of pipeline is installed chassis, comprises the upper frame that is comprised of a pair of upper longeron 11 and a pair of entablatrance 4, and the upper frame downside is provided with column 2, and the lower end of column 2 connects by lower longeron 1; Upper longeron 11 inboards are provided with the longeron track, be provided with " well " word girder construction in the upper longeron track, described " well " word girder construction comprises " well " word beam crossbeam 5 and " well " word beam longeron 6, " well " word beam crossbeam 5 two ends cooperate with upper longeron 11 tracks by walking bearing 9, and " well " word beam longeron 6 two ends cooperate with " well " word beam crossbeam 5 inboard tracks that arrange by walking bearing 10; The chain and tackle block 7 that is used for riser tubing is installed on " well " word beam longeron 6.Be provided with diagonal brace 3 between column 2 middle and lower parts and the entablatrance 4.Column 2 is provided with reinforced company's fishplate bar 8 with upper longeron 11, lower longeron 1 junction.Column 2 arranges six, arranges and be separately positioned on upper longeron 11 two ends and central authorities perpendicular to upper longeron 11 respectively.
Use procedure:
Chassis is in place: promote chassis by the winch traction or by bulldozer, loader, move to pipeline location;
The pipeline vertical direction is in place: utilize chain and tackle block on chassis " well " the word beam longeron pipeline of slinging, adjust duct height and make it to meet designing requirement;
The pipe level direction is in place: utilize manual lifting screw to promote chassis " well " word beam longeron and carry out parallel motion, reach adjustment pipe level position and make it installing on the axis;
Pipeline axial is in place: utilize manual lifting screw to promote chassis " well " word beam crossbeam and move axially, carry out the docking of pipeline opening (bell and spigot);
Restrained line unclasps chain and tackle block, finishes pipeline and installs.

Claims (4)

1. a pipeline is installed chassis, and it is characterized in that: comprise the upper frame that is comprised of a pair of upper longeron and a pair of entablatrance, the upper frame downside is provided with column, and the lower end of column connects by lower longeron; Upper longeron inboard is provided with the longeron track, be provided with " well " word girder construction in the upper longeron track, described " well " word girder construction comprises " well " word beam crossbeam and " well " word beam longeron, " well " word beam crossbeam two ends cooperate with upper longeron track by the walking bearing, and " well " word beam longeron two ends cooperate by the inboard track that arranges of walking bearing and " well " word beam crossbeam; On " well " word beam longeron chain and tackle block is installed.
2. pipeline according to claim 1 is installed chassis, it is characterized in that: be provided with diagonal brace between column middle and lower part and the entablatrance.
3. pipeline according to claim 2 is installed chassis, and it is characterized in that: column and upper longeron, lower longeron junction are provided with reinforced company's fishplate bar.
4. pipeline according to claim 3 is installed chassis, and it is characterized in that: column arranges six, respectively perpendicular to upper longeron setting and be separately positioned on upper longeron two ends and central authorities.
CN 201220337141 2012-07-12 2012-07-12 Pipeline assembly trolley Expired - Fee Related CN202657861U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220337141 CN202657861U (en) 2012-07-12 2012-07-12 Pipeline assembly trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220337141 CN202657861U (en) 2012-07-12 2012-07-12 Pipeline assembly trolley

Publications (1)

Publication Number Publication Date
CN202657861U true CN202657861U (en) 2013-01-09

Family

ID=47452782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220337141 Expired - Fee Related CN202657861U (en) 2012-07-12 2012-07-12 Pipeline assembly trolley

Country Status (1)

Country Link
CN (1) CN202657861U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105540448A (en) * 2016-02-03 2016-05-04 湖南三一石油科技有限公司 Pipe column lifting mechanism and pipe column conveying device
CN112856038A (en) * 2019-11-27 2021-05-28 中国石油天然气集团有限公司 Pipeline assembly device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105540448A (en) * 2016-02-03 2016-05-04 湖南三一石油科技有限公司 Pipe column lifting mechanism and pipe column conveying device
CN112856038A (en) * 2019-11-27 2021-05-28 中国石油天然气集团有限公司 Pipeline assembly device

Similar Documents

Publication Publication Date Title
CN103334381B (en) Full-bracket track-bogie bearing and moving device and construction method for installing steel box girders
CN201825671U (en) Hoisting trolley for track plate
CN102633194B (en) Railway crane for high-speed railway rescue and construction
CN102051860B (en) Bridge erecting and track laying machine for railway
CN105002831A (en) Wheel-rail type loading and traveling cable crane
CN103074829B (en) Railway switch changing construction method and railway switch track laying unit thereof
CN102862580A (en) Overline operation crane for high-speed railways
CN203452009U (en) Self-walking device for mounting steel beam
CN103628416B (en) Stiffening girder of suspension bridge is to pulling type pier side bracket
CN201933415U (en) Highway and railway twin-girder bridge erection machine
CN201634332U (en) Heavy girder gantry crane
CN202657861U (en) Pipeline assembly trolley
CN204343172U (en) A kind of Bridge Erector
CN204152426U (en) A kind of quick removal of home rig of hydraulic cylinder raising
CN202657865U (en) Railway crane used for high speed railway and track traffic overline work
CN203428766U (en) Electric hoist
CN104875670A (en) Conveying vehicle special for tower drum
CN202429889U (en) Crane travel mechanism for bridge crane
CN201305409Y (en) Bridge crane
CN204778394U (en) Crane cart running gear
CN104514200B (en) The rear auxiliary support apparatus of large-tonnage Bridge Erector
CN204875543U (en) Wheel rail formula load walking cable carries loop wheel machine
CN202705904U (en) Small-radius hydraulic power tyre bridge girder erection machine
CN202429915U (en) Large-tonnage lifting hook overhead crane
CN204356659U (en) The rear auxiliary support apparatus of novel large-tonnage Bridge Erector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130109

Termination date: 20200712

CF01 Termination of patent right due to non-payment of annual fee