CN201358469Y - Prefabricated reinforced concrete combined inspection well - Google Patents

Prefabricated reinforced concrete combined inspection well Download PDF

Info

Publication number
CN201358469Y
CN201358469Y CNU2009200136538U CN200920013653U CN201358469Y CN 201358469 Y CN201358469 Y CN 201358469Y CN U2009200136538 U CNU2009200136538 U CN U2009200136538U CN 200920013653 U CN200920013653 U CN 200920013653U CN 201358469 Y CN201358469 Y CN 201358469Y
Authority
CN
China
Prior art keywords
shaft
well
section
reinforced concrete
step structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009200136538U
Other languages
Chinese (zh)
Inventor
林刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Kaidi Science & Technology Industrial Development Co Ltd
Original Assignee
Shenyang Huixinjian Trade Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Huixinjian Trade Co ltd filed Critical Shenyang Huixinjian Trade Co ltd
Priority to CNU2009200136538U priority Critical patent/CN201358469Y/en
Application granted granted Critical
Publication of CN201358469Y publication Critical patent/CN201358469Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The prefabricated reinforced concrete combined inspection well is used for water supply, sewage and rainwater discharge, heat supply network, power supply, telecommunication, gas and other pipe networks in urban construction; the prefabricated reinforced concrete combined inspection well consists of a well cover, a closing section, a well shaft and a well seat; the lower port of the closing-up section is made into a step structure with a concave outer diameter, the upper port of the shaft is made into a step structure matched with the step structure with the concave outer diameter of the lower port of the closing-up section, the lower port of the shaft is made into a step structure with a concave outer diameter, the upper port of the well seat is made into a step structure with a concave inner diameter matched with the step structure with the concave outer diameter of the lower port of the shaft, the lower end of the well seat is provided with a bottom plate, and the lower wall is provided with two; installing a shaft on a shaft seat, installing a closing section on the shaft, and installing a well cover on the closing section; the advantages are that: the inspection well is made of segmented reinforced concrete prefabricated parts, so that the field working efficiency of the inspection well is improved, and the construction period is shortened; the bearing capacity is large, and the bearing is easy to damage; not easy to leak and does not pollute the underground water.

Description

The prefabricated reinforced concrete combined inspection shaft
Technical field:
The invention is the manhole of pipe networks such as the feedwater that is used for urban construction, effluent discharge, storm-water drainage, fire-fighting, heat supply network, power supply, telecommunications, coal gas.
Background technology:
At present, the manhole of pipe networks such as the feedwater in the urban construction, effluent discharge, storm-water drainage, fire-fighting, heat supply network, power supply, telecommunications generally adopts brick, and bearing capacity is not enough, destructive loss often appears in work progress, because brick, seepage and polluted underground water often appear in long construction period.
Summary of the invention:
The purpose of the invention provides a kind of prefabricated reinforced concrete combined inspection shaft that shortens the construction period of manhole; The purpose of the invention is achieved through the following technical solutions: the prefabricated reinforced concrete combined inspection shaft is characterized in that being made up of close up section, pit shaft and well seat; The section that closes up lower port is made the recessed ledge structure of external diameter, the ledge structure that the recessed ledge structure of the pit shaft upper port section made and close up lower port external diameter matches, the pit shaft lower port is made the recessed ledge structure of external diameter, well seat upper port is made the recessed ledge structure of internal diameter, the ledge structure recessed with pit shaft lower port external diameter matches, and well seat lower end is shaped on base plate, is shaped on through hole on well seat sidewall, it is big that through hole is made the internal orifice diameter, the through hole that the collar extension diameter is little; Pit shaft is contained on the well seat, and the section that closes up is contained on the pit shaft.
The advantage of the invention: because manhole is adopted segmental structure, and these segmental structures can be prefabricated into reinforced concrete member in advance, can constitute a complete manhole in the manhole job site as long as segmental structure installed in order, improve the site work efficient of manhole, shortened the construction period of manhole; Because adopt precast reinforced concrete structure, bearing capacity is big, and is not fragile; Owing to adopt precast reinforced concrete structure, not easy to leak, not polluted underground water.
Description of drawings:
Fig. 1 is a prefabricated reinforced concrete combined inspection shaft structural representation.
Among the figure: 1, well lid 2, closing in section 3, pit shaft 4, well seat 5, through hole
The specific embodiment:
The prefabricated reinforced concrete combined inspection shaft is characterized in that being made up of close up section, pit shaft and well seat; The section that closes up lower port is made the recessed ledge structure of external diameter, the ledge structure that the recessed ledge structure of the pit shaft upper port section made and close up lower port external diameter matches, the pit shaft lower port is made the recessed ledge structure of external diameter, well seat upper port is made the recessed ledge structure of internal diameter, the ledge structure recessed with pit shaft lower port external diameter matches, and well seat lower end is shaped on base plate, is shaped on through hole on well seat sidewall, it is big that through hole is made the internal orifice diameter, the through hole that the collar extension diameter is little; Pit shaft is contained on the well seat, and the section that closes up is contained on the pit shaft.
Well lid is contained on the section that closes up.
Well lid, close up section, pit shaft and well seat are made circle, can make tetrahedron, can make six shapes, can make octahedral shape, also can make 16 shapes and ellipse.
The through hole of making on well seat sidewall can be shaped on two through holes or three through holes or four through holes and more as required, and it is big that through hole is made the internal orifice diameter, and the through hole that the collar extension diameter is little is convenient to plaster after tube connector is installed.
Advantage: because inspection shaft is adopted segmental structure, and these segmental structures can be in advance pre-Make reinforced concrete member, need only in the inspection shaft job site segmental structure is installed in order Can consist of a complete inspection shaft, improve the work on the spot efficient of inspection shaft, shorten The construction period of inspection shaft; Because adopt precast reinforced concrete structure, bearing capacity is big, show easily Damage; Owing to adopt precast reinforced concrete structure, not easy to leak, not polluted underground water.

Claims (1)

1, prefabricated reinforced concrete combined inspection shaft is characterized in that being made up of close up section, pit shaft and well seat; The section that closes up lower port is made the recessed ledge structure of external diameter, the ledge structure that the recessed ledge structure of the pit shaft upper port section made and close up lower port external diameter matches, the pit shaft lower port is made the recessed ledge structure of external diameter, well seat upper port is made the recessed ledge structure of internal diameter, the ledge structure recessed with pit shaft lower port external diameter matches, and well seat lower end is shaped on base plate, is shaped on through hole on well seat sidewall, it is big that through hole is made the internal orifice diameter, the through hole that the collar extension diameter is little; Pit shaft is contained on the well seat, and the section that closes up is contained on the pit shaft.
CNU2009200136538U 2009-05-12 2009-05-12 Prefabricated reinforced concrete combined inspection well Expired - Fee Related CN201358469Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200136538U CN201358469Y (en) 2009-05-12 2009-05-12 Prefabricated reinforced concrete combined inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200136538U CN201358469Y (en) 2009-05-12 2009-05-12 Prefabricated reinforced concrete combined inspection well

Publications (1)

Publication Number Publication Date
CN201358469Y true CN201358469Y (en) 2009-12-09

Family

ID=41424230

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200136538U Expired - Fee Related CN201358469Y (en) 2009-05-12 2009-05-12 Prefabricated reinforced concrete combined inspection well

Country Status (1)

Country Link
CN (1) CN201358469Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002976A (en) * 2015-04-16 2015-10-28 北京市政路桥管理养护集团有限公司 Prefabricated gutter inlet and construction method thereof
CN105089073A (en) * 2014-05-24 2015-11-25 厦门嘉达环保建造工程有限公司 Precast concrete inspection well module
CN106759793A (en) * 2016-12-30 2017-05-31 武汉兴天宇环境股份有限公司 A kind of adjustable road surface sewage inspection well new device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089073A (en) * 2014-05-24 2015-11-25 厦门嘉达环保建造工程有限公司 Precast concrete inspection well module
CN105002976A (en) * 2015-04-16 2015-10-28 北京市政路桥管理养护集团有限公司 Prefabricated gutter inlet and construction method thereof
CN106759793A (en) * 2016-12-30 2017-05-31 武汉兴天宇环境股份有限公司 A kind of adjustable road surface sewage inspection well new device

Similar Documents

Publication Publication Date Title
CN201883454U (en) Prefabricated reinforced-concrete assembly-type combined inspection well chamber
CN210031914U (en) Assembled inspection shaft
CN202660067U (en) Waterproof sleeve preventing wall body leakage
CN201358469Y (en) Prefabricated reinforced concrete combined inspection well
CN202202545U (en) Outer sleeve type exhaust pipeline connecting device
CN203389471U (en) Ceramic water film dust collector
CN209873839U (en) Steel corrugated plate concrete open caisson
CN204492335U (en) Construction repeats to use mobile sound barrier
CN202227694U (en) Embedded sleeve for concrete pouring construction of bathroom floor
CN203284803U (en) Combined type multifunctional comprehensive inspection well chamber
CN105350610A (en) Anti-floating device suitable for glass fiber reinforced plastic integrated pumping station
CN202125056U (en) Internal-sleeved connecting device of exhaust pipeline
CN205012325U (en) Prefabricated precipitation tubular pile in building foundation
CN207633358U (en) A kind of prefabricated assembled pipe gallery jointing construction
CN107152034B (en) Comprehensive pipe rack and construction method thereof
CN100410457C (en) Combined pipe fitting inspection well
CN204326105U (en) A kind of plastic inspection well
CN212003260U (en) Water delivery pipeline fixing device
CN208996003U (en) Power station outlet vertical shaft with discharge structure
CN201738429U (en) Drainage inspection well
CN202369996U (en) Water-draining sealing device for foundation pit
CN201620424U (en) Combined inspection well
CN203583521U (en) Constructional engineering well body structure
CN205677031U (en) A kind of sewage piece well
CN200940336Y (en) Wire connection well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LIAONING KAIDISEN TECHNOLOGY INDUSTRIAL DEVELOPMEN

Free format text: FORMER OWNER: SHENYANG HUIXINJIAN TRADING CO., LTD.

Effective date: 20110614

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 110165 NO. 25, SHANLI VILLAGE, YINGDA TOWN, DONGLING DISTRICT, SHENYANG CITY, LIAONING PROVINCE TO: 110042 ROOM 902, TOWER A, JINLONG BUILDING, NO. 31-A, JINQIAO ROAD, DADONG DISTRICT, SHENYANG CITY, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110614

Address after: Jinqiao Road 110042 in Liaoning Province, Shenyang City District No. 31 Jinlong building block A room 902

Patentee after: Liaoning Kaidi Science & Technology Industrial Development Co. Ltd.

Address before: 110165, 25, Yamanashi village, Ying Da Town, Dongling District, Liaoning, Shenyang

Patentee before: Shenyang Huixinjian Trading Co., Ltd.

PP01 Preservation of patent right

Effective date of registration: 20130423

Granted publication date: 20091209

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20140423

Granted publication date: 20091209

RINS Preservation of patent right or utility model and its discharge
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091209