CN201347586Y - 大跨度预应力索托桁架结构 - Google Patents
大跨度预应力索托桁架结构 Download PDFInfo
- Publication number
- CN201347586Y CN201347586Y CNU2008202054364U CN200820205436U CN201347586Y CN 201347586 Y CN201347586 Y CN 201347586Y CN U2008202054364 U CNU2008202054364 U CN U2008202054364U CN 200820205436 U CN200820205436 U CN 200820205436U CN 201347586 Y CN201347586 Y CN 201347586Y
- Authority
- CN
- China
- Prior art keywords
- truss
- horizon bar
- span prestressed
- diagonal brace
- brace structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
本实用新型涉及一种大跨度预应力索托桁架结构,包括桁架(1),其特征是:在桁架(1)的两端分别设有斜撑结构(2),沿桁架(1)的下弦杆(1-3)方向设置水平杆(3),所述斜撑结构(2)的上端与桁架(1)的上弦杆(1-1)固定连接,所述斜撑结构(2)的下端与水平杆(3)固定连接;水平杆(3)直接或通过连接件与桁架(1)固定连接。本实用新型,在普通桁架结构基础上,设置预应力水平索托杆件,可以有效的提高桁架的刚度,减少桁架的杆件额外增加的内力;本实用新型操作简单,施工成本低。
Description
技术领域
本实用新型一种大跨度预应力索托桁架结构,属于建筑结构技术领域。
背景技术
20世纪90年代以后,随着我国大跨度公共建筑的兴建,以及建筑外观或使用上的要求,桁架结构要适应低高度、大跨度的要求。跨度变大,桁架为了能够满足建筑结构的受力要求,必须增加桁架杆件的数量,这样会导致桁架本身自重及其负载增大,桁架挠度变大;目前也有采用在桁架两端设置拉索的方法,但由于桁架大跨度、低高度的限制,拉索与水平面的夹角太小,导致拉索只能产生较小的有效垂直分力,水平分力较大,而拉索所产生的水平分力直接作用在本身受拉下弦杆上,增加了本身拉力较大的下弦中部杆件的内力,这对结构不利,同时,由于受桁架高度限制,杆件抵抗变形能力较弱。因此,找到一种有效的,可以尽量减少桁架杆件的内力,提高桁架刚度,适应新型公共建筑外观需要的结构是项非常有意义的工作。
实用新型内容
本实用新型的目的,是为了提供一种大跨度预应力索托桁架结构,具有减少桁架的杆件的内力、减少桁架挠度、提高桁架整体刚度、操作简单、施工成本低的特点。
本实用新型的目的,可以通过以下技术方案实现:
大跨度预应力索托桁架结构,包括桁架,其结构特点是:在桁架的两端分别设有斜撑结构,沿桁架的下弦杆方向设置水平杆,所述斜撑结构的上端与桁架的上弦杆固定连接,所述斜撑结构的下端与水平杆固定连接;水平杆直接或通过连接件与桁架固定连接。
本实用新型的目的,还可以通过以下技术方案实现:
本实用新型的一种实施方案是:所述斜撑结构由至少二条斜杆构成,所述斜杆设置在桁架的两端对称位置,形成对称式斜向支撑结构。
本实用新型的一种实施方案是:所述水平杆上施加适当预拉力,斜撑结构承受拉力,起到拉索作用。
本实用新型的一种实施方案是:所述斜撑结构与桁架上弦杆的固定采用锚固定。
本实用新型的一种实施方案是:所述斜撑结构与水平杆的固定采用锚固定。
本实用新型的一种实施方案是:所述水平杆与桁架下弦杆的连接采用连接件连接。
本实用新型的一种实施方案是:所述水平杆与连接件接触处垫聚四氟乙烯材料,使两者间基本不产生摩擦力,同时保护水平杆。
本实用新型的一种实施方案是:所述桁架可以由钢桁架结构构成。
本实用新型具有如下有益效果:
本实用新型的大跨度预应力索托桁架是在普通桁架上引入预应力体系,它不仅可以节约大量的桁架,大大降低生产及安装成本,同时,水平预应力索托与桁架相互作用,对桁架的作用力接近垂直,而水平方向分力方向指向桁架中心,可以有效的提高桁架的刚度,减少了桁架的杆件额外增加的内力;本实用新型操作简单,施工成本低。
附图说明
图1为本实用新型一个具体实施例的结构示意图。
具体实施方式
具体实施例1:
如图1所示,本实施例包括桁架1,桁架1由上弦杆1-1、下弦杆1-3和位于上弦杆1-1、下弦杆1-3之间的若干条支撑杆1-2连接而成;在桁架1的两端分别设有斜撑结构2,沿桁架1的下弦杆1-3方向设置水平杆3,所述斜撑结构2的上端与桁架1的上弦杆1-1固定连接,所述斜撑结构2的下端与水平杆3固定连接;水平杆3直接或通过连接件与桁架1固定连接。桁架1上弦杆的两端斜向对称分别设置两根斜杆2-1,斜杆2-1承拉,起到拉索作用;沿桁架1下弦杆方向设置水平杆3,斜杆2-1的上端分别锚固定于上弦杆的两端,斜杆2-1的下端分别锚固定于水平杆3的两端与四分之一处,水平杆3与桁架1通过连接件连接。所述水平杆3与连接件接触处垫聚四氟乙烯材料,使两者间基本不产生摩擦力,同时保护水平杆3,在水平杆3上施加预应力。
本实施例中:所述斜撑结构2由至少二条斜杆2-1构成,所述斜杆2-1设置在桁架1的两端对称位置,形成对称式斜向支撑结构。
将本实用新型应用于某省政府综合楼入口的大跨度建筑结构中,某省政府综合楼入口处跨度87米,受建筑外观控制,桁架高度控制在5米左右。桁架平面挂花岗岩石板,不但荷载大,而且对变形的要求较高。为解决刚度问题,在桁架本身采用钢桁架结构的基础上,采用本实用新型的大跨度预应力索托桁架,按照上述方法,分别设置两根斜杆2-1与水平杆3,施加预应力的水平杆3采用上海浦江缆索厂生产的扭绞型平行镀锌钢丝束,钢丝强度为1670N/m2,外包塑料,索头采用冷铸锚,水平杆3与钢桁架采用紧固件连接。2008年初,该省遇罕见大雪,屋面积冰达60厘米,大大超过现行规范荷载值。现场测试表明,积雪虽引起桁架一定的变形,但融雪后得到恢复。实践证明,本实用新型,大跨度预应力索托桁架结构不但能有效增加桁架抵抗变形的能力,而且安全可靠。
Claims (4)
1、大跨度预应力索托桁架结构,包括桁架(1),其特征是:在桁架(1)的两端分别设有斜撑结构(2),沿桁架(1)的下弦杆(1-3)方向设置水平杆(3),所述斜撑结构(2)的上端与桁架(1)的上弦杆(1-1)固定连接,所述斜撑结构(2)的下端与水平杆(3)固定连接;水平杆(3)直接或通过连接件与桁架(1)固定连接。
2、根据权利要求1所述大跨度预应力索托桁架结构结构,其特征是:所述水平杆(3)与桁架(1)的连接处设有垫接件,该垫接件由聚四氟乙烯材料构成。
3、根据权利要求1所述大跨度预应力索托桁架结构,其特征是:所述斜撑结构(2)的上端锚固于桁架(1)上弦杆(1-1),所述斜撑结构(2)的下端锚固定于水平杆(3)。
4、根据权利要求1所述大跨度预应力索托桁架结构,其特征是:所述斜撑结构(2)由至少二条斜杆(2-1)构成,所述斜杆(2-1)设置在桁架(1)的两端对称位置,形成对称式斜向支撑结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202054364U CN201347586Y (zh) | 2008-12-17 | 2008-12-17 | 大跨度预应力索托桁架结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202054364U CN201347586Y (zh) | 2008-12-17 | 2008-12-17 | 大跨度预应力索托桁架结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201347586Y true CN201347586Y (zh) | 2009-11-18 |
Family
ID=41367058
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008202054364U Expired - Lifetime CN201347586Y (zh) | 2008-12-17 | 2008-12-17 | 大跨度预应力索托桁架结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201347586Y (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060759A (zh) * | 2014-06-11 | 2014-09-24 | 江苏科技大学 | 一种内置斜牵索的张弦桁架 |
CN104863307A (zh) * | 2015-04-28 | 2015-08-26 | 成都迅德科技有限公司 | 桁架结构 |
CN104947793A (zh) * | 2015-06-29 | 2015-09-30 | 东南大学 | 一种增设备用索的张弦桁架结构 |
CN105234217A (zh) * | 2015-11-05 | 2016-01-13 | 江苏理工学院 | 一种超宽卷板机用上压棍支撑桁架 |
-
2008
- 2008-12-17 CN CNU2008202054364U patent/CN201347586Y/zh not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060759A (zh) * | 2014-06-11 | 2014-09-24 | 江苏科技大学 | 一种内置斜牵索的张弦桁架 |
CN104863307A (zh) * | 2015-04-28 | 2015-08-26 | 成都迅德科技有限公司 | 桁架结构 |
CN104947793A (zh) * | 2015-06-29 | 2015-09-30 | 东南大学 | 一种增设备用索的张弦桁架结构 |
CN105234217A (zh) * | 2015-11-05 | 2016-01-13 | 江苏理工学院 | 一种超宽卷板机用上压棍支撑桁架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104032891A (zh) | 一种预应力双拼胶合木梁 | |
CN204282199U (zh) | 桩柱式混凝土空心桩桥墩结构 | |
CN201347586Y (zh) | 大跨度预应力索托桁架结构 | |
CN201695572U (zh) | 劲性混凝土柱与钢筋混凝土框架梁混合结构 | |
CN203559354U (zh) | 一种应用于预应力混凝土部分斜拉桥的斜拉索锚固结构 | |
CN202787047U (zh) | 一种上承式三角桁架钢桁结合梁 | |
CN101594095A (zh) | 一种钢丝绳网结构太阳能发电场 | |
CN205999769U (zh) | 一种高速铁路钢混组合独塔部分斜拉桥 | |
CN201328275Y (zh) | 一种具有张拉结构的温室大棚 | |
CN208094486U (zh) | 一种基于预应力索桁架的零扰度大跨度光伏支架结构 | |
CN207354115U (zh) | 光伏鱼腹式索杆结构 | |
CN202831384U (zh) | 一种双预制叠合框架梁 | |
CN215593681U (zh) | 一种内置式钢绞线-撑杆斜拉桥索塔锚固结构 | |
CN205171343U (zh) | 组合梁自锚式悬索桥 | |
CN111926702B (zh) | 一种可抑制拉索振动的外置式钢锚箱结构 | |
CN105220609B (zh) | 组合梁自锚式悬索桥及其施工工艺 | |
CN211171560U (zh) | 一种钢斜撑杆组合pc梁 | |
CN208844443U (zh) | 一种基于拱的箱型梁加固结构 | |
CN203440912U (zh) | 一种索与变截面梁、拱组合结构体系 | |
CN202730633U (zh) | 独柱塔平行空间主缆自锚式悬索桥 | |
CN111893861A (zh) | 一种钢桁腹式混凝土组合梁的部分斜拉桥及其施工方法 | |
CN202866083U (zh) | 钢筋混凝土楼板结构 | |
CN201460020U (zh) | 平面网格弦支结构 | |
CN207484299U (zh) | 一种立交桥梁钢结构防护棚 | |
CN112813847A (zh) | 一种现浇箱梁临边防护结构及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20091118 |
|
CX01 | Expiry of patent term |