CN201347421Y - Cracking and slag draining device for fuel produced by organic refuses - Google Patents

Cracking and slag draining device for fuel produced by organic refuses Download PDF

Info

Publication number
CN201347421Y
CN201347421Y CNU200920010151XU CN200920010151U CN201347421Y CN 201347421 Y CN201347421 Y CN 201347421Y CN U200920010151X U CNU200920010151X U CN U200920010151XU CN 200920010151 U CN200920010151 U CN 200920010151U CN 201347421 Y CN201347421 Y CN 201347421Y
Authority
CN
China
Prior art keywords
slag
cracking
transporting
condensing funnel
tubulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200920010151XU
Other languages
Chinese (zh)
Inventor
仲伟洲
李国君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHAOYANG SENYUAN ACTIVATED CARBON Co Ltd
Original Assignee
CHAOYANG SENYUAN ACTIVATED CARBON Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHAOYANG SENYUAN ACTIVATED CARBON Co Ltd filed Critical CHAOYANG SENYUAN ACTIVATED CARBON Co Ltd
Priority to CNU200920010151XU priority Critical patent/CN201347421Y/en
Application granted granted Critical
Publication of CN201347421Y publication Critical patent/CN201347421Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A cracking and slag draining device for fuel produced by organic refuses is composed of a pipe cracking furnace, a material slag draining device, an electric heater unit and a drive and control device. The tube cracking furnace mainly consists of a collector and transporting tubebanks at two sides. The transporting tubebanks are linked at two sides of the collector in parallel. Each tubebank independently transports materials and the transporting terminal of which is abutted with the collector. An air outlet on the collector corresponds to the transporting tubebank and is communicated with the slag draining device. The collector collecting tube is installed with an electric heater and provided with a transporting hinge at lower. The tube cracking furnace solves the problems in the kettle thick tube hot feed process, has the advantages of uniform heating, continuous production operation, organic refuse processing amount 60-90 T each day and more than 50% of recovery rate. The slag draining device has high strength, no dead angle for transporting materials, no residues and small device volume and safe production and low replacement frequency of the device and parts and avoids local overheat and device deformation due to scale formation and coke.

Description

Organic waste is made fuel cracking slag discharging device
Technical field
The utility model relates to refuse treatment plant, particularly reclaims organic waste and produces the cracking slag discharging device that fuel is used.
Background technology
The scientific utilization of municipal wastes and harmless treatment are always various countries and pay attention to, and rubbish is improved to recycling by burning landfill, particularly reclaim the organic waste technology and equipment that uses that acts as a fuel and have been seen in report.CN1204227C number " refuse disposal system of derivatived fuel ", this technology at first removes the air in the rubbish material, under vacuum condition, makes at 400~700 ℃ that hot gas flow is reverse to be contacted with material in thermo-cracking light.Carry out thermo-cracking, then by purify and filter fuel gas.Its shortcoming is that technical matters flow process and equipment are loaded down with trivial details, and consumes energy is big; Have only the partial organic substances gas that acts as a fuel to be recovered, gasification part and a small amount of combustion prod do not obtain recycling.In the present already used organic waste recycling equipment, single (slightly) pipe or the still formula heating pyrolyze equipment of adopting more, the production cycle is long, efficient is low, is not suitable for a large amount of organic wastes of handling continuously.Heat as tubular type, a large amount of organic wastes inequality of being heated causes partial occlusion, treatment capacity is big more, caliber is thick more, and obstruction is just serious more, and the fouling of slag charge wall built-up, coking occur now and then in the operational process, cause local superheating, equipment distortion, so that can not the serialization normal operation, this technical barrier is not resolved all the time so far.
Summary of the invention
The utility model purpose is to overcome the deficiency that existing organic waste recycling technology and equipment exists, provide a kind of day and handle organic waste 60T~90T, high and the continuous running job of energy of the rate of recovery, reasonable, the safe recovery organic waste of processing unit is produced the cracking slag discharging device that fuel is used.
Organic waste provided by the utility model is made the cracking slag discharging device that fuel is used, mainly contain the tube cracking furnace [3] that is used for defeated material and thermo-cracking, material slag off apparatus [5], electric heater unit and driving control device, be characterized in that this tube cracking furnace mainly is made of condensing funnel [3-6] and two Jis defeated material tubulations [3-3], defeated material tubulation [3-3] is connected in condensing funnel [3-6] both sides with parallel way, every tubulation independence convey materials and defeated material terminal are docked with condensing funnel, condensing funnel is provided with and the defeated material corresponding pneumatic outlet of tubulation [3-1], this pneumatic outlet is communicated with material slag off apparatus [5], and condensing funnel [3-6] bottom is provided with carries the not conveying hinge dragon [3-4] of gasification materiel.
For continuing to be warming up to the temperature of doing of regulation, further cracking material, the utility model design has the material slag off apparatus [5] that is connected with tube cracking furnace [3], the pneumatic outlet [5-1] that material slag off apparatus [5] is provided with locates to be equipped with catalytic bed, and with separating and reclaiming device UNICOM, gas inlet [5-2] is communicated with the pneumatic outlet [3-1] of tube cracking furnace condensing funnel [3-6], not gasification materiel import [5-3] is communicated with the deslagging outlet of condensing funnel hinge dragon [3-4], tubular type spiral hinge dragon [5-5] is equipped with in slag off apparatus [5] bottom, and residue outlet [5-4] connection-carbonoxide producer carries out the gas deep processing.Material slag off apparatus end face than reasonable structural design is: spiral cuts with scissors imperial pipe and becomes neither isometrical up and down half arc until the periphery design of slag off apparatus, and two halves arc and bottom spiral hinge dragon are spool concentric and connect into symmetrical structure with trapezoidal side plate.
The utility model is compared with existing installation and is had the following advantages:
1, tube cracking furnace has solved present still formula, extra heavy pipe adds the technical barrier in the explained hereafter such as hot feed, be heated evenly clog-free, can realize the continuous production operation, day handle organic waste 60~90T/ day, the rate of recovery reaches more than 50% (gas, liquid fuel occupy machine rubbish per-cent) and utilizes the microcomputer complete monitoring;
2, the tubulation quantity of tube cracking furnace can be set according to output, because caliber and screw diameter are little, torque is little, with compare total capacitance with the miscellaneous equipment of equal yield line and do not increase, but enlarged heat transfer area, improved heat utilization efficiency, reduced equipment investment cost with equal yield line, prolonged service life of equipment, maintain and replace is convenient;
3, condensing funnel in the pyrolyzer and material slag off apparatus adopt the most reasonably project organization, equipment intensity height, convey materials do not have dead angle, no residue, avoided equipment encrustation, coking to cause local superheating, cause the equipment distortion, this equipment volume is little, internal volume is little, material does not stop, moves smooth and easy for a long time, production process safety coefficient height, and equipment and part replacement frequency reduce greatly.
Description of drawings
Fig. 1, Fig. 2 and Fig. 3 are respectively front view, left view and the vertical view of tube cracking furnace.
Fig. 4, Fig. 5 are respectively the front view and the left view of material slag off apparatus.
Embodiment
Referring to Fig. 1 Fig. 2 and Fig. 3 tube cracking furnace view, organic waste is pushed in condensing funnel 3-6 in stove by the defeated material tubulation 3-3 of loading hopper 1 by tube cracking furnace 3 both sides, dress spiral toggle is advanced material by buncher 2 controls in the defeated material tubulation 3-3 to pyrolyzer intermediary hole enlargement condensing funnel 3-6, and electric heater is respectively defeated material tubulation 3-3, pyrolyzer condensing funnel 3-6 and enters the heating that heats up of set pipeline between the material slag off apparatus.Tube cracking furnace mainly constitutes by being positioned at intermediary condensing funnel 3-6 and two Jis defeated material tubulation 3-3, and defeated material tubulation is connected in the condensing funnel both sides with the parallel way connection, and 2~10 of every sides are equipped with the spiral toggle in the tubulation, determine tubulation quantity according to handling the organic waste amount; Every tubulation passes through the spiral toggle independence convey materials of the inside, the defeated material terminal of both sides defeated material tubulation 3-3 is docked with it on condensing funnel 3-6 top, condensing funnel is equipped with bracing frame 3-2 near the end socket position, supporting leg 3-5 is equipped with in the bottom, the condensing funnel top is provided with and the corresponding pneumatic outlet 3-1 of defeated material tubulation, material gas enters material slag off apparatus 5 by this outlet through compiling house steward, condensing funnel has carries not that the spiral of gasification materiel cuts with scissors imperial 3-4, and condensing funnel [3-6] compiles house steward and is peripherally equipped with insulated electro hot jacket [4].
Referring to the material slag off apparatus 5 among Fig. 4 and Fig. 5, slag off apparatus 5 tops are provided with pneumatic outlet 5-1, and the exit is equipped with catalytic bed and pneumatic outlet and separating and reclaiming device UNICOM; Slag off apparatus 5 one sides are respectively equipped with gas inlet 5-2 and gasification materiel import 5-3 not, gas inlet 5-2 compiles outlet 3-1 with the gas of pyrolyzer condensing funnel 3-6 top and is communicated with, gasification materiel import 5-3 and condensing funnel do not cut with scissors imperial 3-4 deslagging outlet and are communicated with, slag off apparatus 5 bottoms are equipped with the tubular type spiral and are cut with scissors imperial 5-5, and the residue outlet 5-4 connection-carbonoxide producer that is provided with in hinge dragon pipe bottom carries out the gas deep processing.The effect of material slag off apparatus has: 1. cracking residual residue cooling is inputed to-the carbonoxide producer carries out the gas deep processing; 2. the heating pyrolyze function is thoroughly reacted incomplete cracked material; 3. the catalytic bed of installing at the upper outlet of material slag off apparatus can guarantee technical qualification such as catalytic cracking reaction is temperature required.For guaranteeing the no dead angle of the defeated material of material slag off apparatus, do not have residue, avoiding coking to cause local superheating and equipment distortion, material slag off apparatus 5 end face structures are designed to: become neither isometrical up and down half arc along the imperial pipe of hinge until the slag off apparatus periphery design, the two halves arc is all concentric and connect into symmetrical structure with trapezoidal side plate with imperial of the hinge of bottom.

Claims (4)

1, a kind of organic waste is made the cracking slag discharging device that fuel is used, mainly contain the tube cracking furnace [3] that is used for defeated material and thermo-cracking, material slag off apparatus [5], electric heater unit and driving control device, it is characterized in that this tube cracking furnace mainly is made of condensing funnel [3-6] and two Jis defeated material tubulations [3-3], defeated material tubulation [3-3] is connected in condensing funnel [3-6] both sides with parallel way, every tubulation independence convey materials and defeated material terminal are docked with condensing funnel, condensing funnel is provided with and the defeated material corresponding pneumatic outlet of tubulation [3-1], this pneumatic outlet is communicated with material slag off apparatus [5], and condensing funnel [3-6] bottom is provided with carries the not conveying hinge dragon [3-4] of gasification materiel.
2, make the cracking slag discharging device that fuel is used according to the described organic waste of claim 1, it is characterized in that the defeated material terminal of described both sides defeated material tubulation 3-3 is docked with it on condensing funnel 3-6 top, 2~10 of every sides are equipped with the spiral toggle in the tubulation.
3, make the cracking slag discharging device that fuel is used according to the described organic waste of claim 1, the pneumatic outlet [5-1] that it is characterized in that material slag off apparatus [5] setting locates to be equipped with catalytic bed, and with separating and reclaiming device UNICOM, gas inlet [5-2] is communicated with the pneumatic outlet [3-1] of tube cracking furnace condensing funnel [3-6], not gasification materiel import [5-3] is communicated with the deslagging outlet of condensing funnel hinge dragon [3-4], tubular type spiral hinge dragon [5-5] is equipped with in slag off apparatus [5] bottom, and residue outlet [5-4] connection-carbonoxide producer carries out the gas deep processing.
4, make the cracking slag discharging device that fuel is used according to the described organic waste of claim 3, it is characterized in that described material slag off apparatus end face structure is: spiral cuts with scissors imperial pipe and becomes neither isometrical up and down half arc until the periphery design of slag off apparatus, and two halves arc and bottom spiral hinge dragon are spool concentric and connect into symmetrical structure with trapezoidal side plate.
CNU200920010151XU 2009-01-11 2009-01-11 Cracking and slag draining device for fuel produced by organic refuses Expired - Fee Related CN201347421Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200920010151XU CN201347421Y (en) 2009-01-11 2009-01-11 Cracking and slag draining device for fuel produced by organic refuses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200920010151XU CN201347421Y (en) 2009-01-11 2009-01-11 Cracking and slag draining device for fuel produced by organic refuses

Publications (1)

Publication Number Publication Date
CN201347421Y true CN201347421Y (en) 2009-11-18

Family

ID=41366895

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200920010151XU Expired - Fee Related CN201347421Y (en) 2009-01-11 2009-01-11 Cracking and slag draining device for fuel produced by organic refuses

Country Status (1)

Country Link
CN (1) CN201347421Y (en)

Similar Documents

Publication Publication Date Title
CN104128349B (en) The equipment that a kind of house refuse produces fuel oil, combustion gas or/and fuel gas generation
CN104804775A (en) Method and system for producing combustible gas from domestic waste through pyrolysis gasification
CN102492443A (en) External-heating type integrated biomass pyrolysis equipment
CN100503784C (en) Waste plastic and rubber reduction and reducing system
CN101463256B (en) Method and special equipment for recycling organic refuse to produce fuel
CN106256877A (en) A kind of carbonizing and gasifying composite furnace
CN202576344U (en) Equipment for extracting oil fuel from sandy oil sludge or/and organic waste
CN101108972B (en) Waste and old tire cracking device and cracking method thereof
CN211570562U (en) Sectional type continuous thermal cracking device for waste plastics
CN1038260C (en) Method and apparatus for controlling of operation of double-furnace
CN106867559B (en) A kind of multistage cracking quantity-produced oil refining method
CN205893035U (en) Low heat value mud " three change " processing apparatus
CN201347421Y (en) Cracking and slag draining device for fuel produced by organic refuses
CN203582803U (en) Municipal waste pyrolysis, dry distillation and gasification treatment system for preventing and controlling dioxin emission
CN216236866U (en) Novel conversion of abandonment organic matter energy device
CN105331380A (en) Power generation system and power generation method
CN205368272U (en) Composite furnace catalytic gasification's device
CN201095629Y (en) Cracking device for waste and old tyre
CN209685688U (en) A kind of house refuse thermal pyrolysis device
CN101482363B (en) Biomass gas and exhaust heat combination type materiel drying system
CN203498324U (en) Environmentally-friendly multifunctional continuous oil refining machine
CN206736179U (en) A kind of multistage cracking quantity-produced oil refining apparatus
CN201695000U (en) Sludge treatment system
CN112625703A (en) Environment-friendly biomass gasification stove
CN205170756U (en) Power generation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhong Weizhou

Inventor after: Li Guojun

Inventor before: Zhong Weizhou

Inventor before: Li Guojun

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091118

Termination date: 20160111