CN201344635Y - Water tank for energy-saving hot water boiler - Google Patents

Water tank for energy-saving hot water boiler Download PDF

Info

Publication number
CN201344635Y
CN201344635Y CNU2009200381667U CN200920038166U CN201344635Y CN 201344635 Y CN201344635 Y CN 201344635Y CN U2009200381667 U CNU2009200381667 U CN U2009200381667U CN 200920038166 U CN200920038166 U CN 200920038166U CN 201344635 Y CN201344635 Y CN 201344635Y
Authority
CN
China
Prior art keywords
water
casing
exchange pipe
energy
wall box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2009200381667U
Other languages
Chinese (zh)
Inventor
朱兴军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2009200381667U priority Critical patent/CN201344635Y/en
Application granted granted Critical
Publication of CN201344635Y publication Critical patent/CN201344635Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Housings, Intake/Discharge, And Installation Of Fluid Heaters (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model provides a pair of water tank for energy-conserving hot-water boiler relates to boiler component, specifically speaking is a hot-water boiler's heating water tank. It at least comprises a box body, a box cover and an exhaust pipeline; the box cover is connected with the box body through a flange; the method is characterized in that: the exhaust pipeline consists of an exchange pipe I, an exchange pipe II and an air collection chamber, the air collection chamber is arranged at the top of the box body, one end of the exchange pipe I is opened on the bottom wall of the box body, the other end of the exchange pipe I is communicated with the air collection chamber, one end of the exchange pipe II is communicated with the air collection chamber, and the other end of the exchange pipe II is arranged at the lower part of the side wall of the box body; the upper part of the box body is provided with at least one special access hole which is communicated with the air collecting chamber, the exchange tube II is arranged at the port on the side wall of the box body and is also used as the access hole on the lower part of the box body, and the side wall of the box body is at least provided with a water inlet and a water outlet. The utility model has the advantages that water and hot gas carry out very abundant heat exchange, therefore the thermal efficiency is high.

Description

A kind of water tank for energy-saving hot water boiler
Technical field
The utility model relates to a kind of boiler component, specifically, is a kind of heating water tank of hot-water boiler.
Background technology
The hot-water boiler that is widely used in hotel, hotel, restaurant, enterprises and institutions at present, usually form by a heating furnace and a heating water tank, the advantage of this hot-water boiler be simple in structure, easily manufactured, production cost is low, shortcoming is that energy consumption is big, the use cost height.Through patent retrieval, we find some improvement to conventional hot water boiler, and it is that the one way exhaust passage is set in heating water tank that a kind of scheme is wherein arranged, and help heating furnace to pull out wind on the one hand, also make full use of the heat energy in the flue gas on the other hand, improved the efficiency of heating surface.Through practical proof, the EGT of discharging through a heat exchange in heating water tank is still very high, and directly discharge is the significant wastage to thermal source.
Summary of the invention
The purpose of this utility model is to provide a kind of flue gas that heating furnace is produced to carry out sufficient heat exchange, the water tank for energy-saving hot water boiler that the efficiency of heating surface is high in heating water tank.
Technical solution of the present utility model is: a kind of water tank for energy-saving hot water boiler which comprises at least casing, case lid and discharge duct; Case lid connects with casing by flange; It is characterized in that: discharge duct is made up of exchange pipe I, exchange pipe II and wind assembling set, wind assembling set is arranged on the top of casing, and the end opening of exchange pipe I is located on the casing diapire, and the other end communicates with wind assembling set, the end of exchange pipe II communicates with wind assembling set, and the other end is opened in the wall box bottom; Casing top is provided with at least one special-purpose access hole, and special-purpose access hole communicates with wind assembling set, and exchange pipe II is located at the port on the wall box, and double as lower box access hole also is provided with water inlet and delivery port at least on the wall box simultaneously.
In order to strengthen heat insulation effect, described case lid is a hollow cap, fill insulant material in the hollow cap.
In order to strengthen heat insulation effect, make full use of the heat in the wind assembling set simultaneously, described case lid is a hollow cap, and caping is provided with water inlet, and the lid side is provided with delivery port.
Described case lid delivery port connects with the casing water inlet.
In order to strengthen heat insulation effect, make water heating step by step gradually in casing simultaneously, described casing is provided with water jacket layer, water jacket layer is made of wall box and water jacket wall, water jacket wall is arranged on box house along wall box, water jacket wall upper limb and wall box upper limb are fixedly connected, and the water jacket wall lower edge is shorter than wall box, and be logical to guarantee water and the water in the casing drum in the water jacket.
The water inlet of described casing is arranged on the wall box upper limb, communicates with water jacket layer; The delivery port of casing is arranged on the middle and upper part of wall box, the upper limb of the corresponding casing drum in its position, and delivery port communicates with the drum of casing.
Described exchange pipe I has some.
Described exchange pipe II is inverse-T-shaped, and a port communicates with wind assembling set, and two ports are opened in the wall box bottom respectively.
The utility model has the advantages that water and hot gas have carried out heat exchange very fully, so thermal efficiency height.
Description of drawings
Fig. 1 is the front view of the utility model embodiment one.
Fig. 2 is the rearview of the utility model embodiment one.
Fig. 3 is the left view of the utility model embodiment one.
Fig. 4 is the A-A cutaway view of the utility model embodiment one.
Fig. 5 is the B-B profile of the utility model embodiment one.
Fig. 6 is the C-C cutaway view of the utility model embodiment one.
Fig. 7 is the D-D profile of the utility model embodiment one.
Fig. 8 is the cutaway view of the utility model embodiment two along exchange pipe II port of export axis direction.
Fig. 9 is the cutaway view of the utility model embodiment two vertical exchanger tube II port of export axis directions.
Among the figure: 1, bottom access hole, 2, casing, 3, special-purpose access hole, 4, case lid, 5, the top cover water inlet, 6, the top cover delivery port, 7, casing water inlet, 8, the casing delivery port, 9, sewage draining exit, 10, exchange pipe I, 11, exchange pipe II, 12, wall box, 13, water jacket wall, 14, wind assembling set, 15, drum.
Below in conjunction with accompanying drawing the utility model is elaborated.
The specific embodiment
Embodiment one
A kind of water tank for energy-saving hot water boiler, it is made up of casing 2, case lid 4 and discharge duct.Case lid 4 is a hollow cap, and caping is provided with top cover water inlet 5, and two symmetric positions of lid side respectively are provided with a top cover delivery port 6.Case lid 4 connects with casing 2 by flange.Casing 2 is provided with water jacket layer, and water jacket layer is made of wall box 12 and water jacket wall 13.Water jacket wall 13 is arranged on casing 2 inside along wall box 12, and the water storage space that is surrounded by water jacket layer in the casing 2 is called drum 15.Water jacket wall 13 upper limbs and wall box 12 upper limbs are fixedly connected, and water jacket wall 13 lower edges are shorter than wall box 12, and are logical to guarantee water and the water in the drum 15 in the water jacket.Casing water inlet 7 is arranged on wall box 12 upper limbs, communicates with water jacket layer.Casing water inlet 7 has two, and the position is corresponding with case lid delivery port 6.Case lid delivery port 6 connects by water pipe and flange with casing water inlet 7.Casing delivery port 8 is arranged on the middle and upper part of wall box 12, the upper limb of the corresponding casing drum 15 in its position, and casing delivery port 8 communicates with the drum 15 of casing 2.Discharge duct is made up of 14 exchange pipe I 10, inverse-T-shaped exchange pipe II 11 and wind assembling set 14, wind assembling set 14 is arranged in the space that water jacket layer surrounds, the top of drum 15, the end opening of every exchange pipe I 10 is located on the casing diapire, the other end communicates with wind assembling set 14, the port of exchange pipe II11 communicates with wind assembling set 14, and two ports are opened in wall box 12 lower edges respectively.Casing 2 tops are provided with the special-purpose access hole 3 of two position symmetries, and special-purpose access hole 3 communicates with wind assembling set 14; Exchange pipe II11 is located at the port on the wall box 12, and double as lower box access hole 1 simultaneously; Wall box 12 lower edges are provided with sewage draining exit 9.Wind assembling set 14, exchange pipe I 10, exchange pipe II 11 do not communicate with water jacket layer, drum 15, and water jacket layer and drum 15 are built-in with heat-absorbing medium---liquid.
The flow trace and the heating process of embodiment one water are: rely on municipal pressure, water enters case lid 4 from top cover water inlet 5, and 14 pairs of water of wind assembling set once heat; Rely on municipal pressure, water flows out the water jacket layer that enters casing 2 from case lid 4, and hot water and heating furnace in wind assembling set 14, the drum 15 carry out post bake to water jointly; Rely on municipal pressure, water is pressed into from water jacket layer in the drum 15, and exchange pipe I 10, exchange pipe II 11, wind assembling set 14 and heating furnace carry out three heating to water jointly; In drum 15, because hot water constantly rises, cold water is the water convective principles of decline constantly, and finally the water of emitting from casing delivery port 8 is the hottest water the casing 2.Present embodiment one is when being used as the energy-saving hot water boiler main water box, when promptly being arranged on the heating furnace, the flow process of hot gas is: rely on the wind apparatus of setting up that pulls out, hot gas enters from the opening part of bottom half exchange pipe I 10, the exchange pipe I 10 that flows through enters wind assembling set 14, enter exchange pipe II 11 by wind assembling set 14 again, finally flow out casing 2; Present embodiment one is when being used as energy-saving hot water boiler pair water tank, the flow process of hot gas is: rely on the wind apparatus of setting up that pulls out, hot gas enters from the openend 1 that exchange pipe II 11 is arranged on the wall box 12, the exchange pipe II 11 that flows through enters wind assembling set 14, enter exchange pipe I 10 by wind assembling set 14 again, I10 flows out casing 2 by the exchange pipe.
Embodiment two
A kind of water tank for energy-saving hot water boiler, it is made up of casing 2, case lid 4 and discharge duct.Case lid 4 is hollow cap, wherein fill insulant material.Case lid 4 connects with casing 2 by flange.Discharge duct is arranged in the casing 2, and it is made up of 14 exchange pipe I 10, inverse-T-shaped exchange pipe II 11 and wind assembling set 14.Wind assembling set 14 is arranged on casing 2 tops.The end opening of every exchange pipe I 10 is located on the casing diapire, and the other end communicates with wind assembling set 14, and the port of exchange pipe II 11 communicates with wind assembling set 14, and two ports are opened in wall box 12 lower edges respectively in addition.Casing 2 tops are provided with the special-purpose access hole 3 of two position symmetries, and access hole 3 communicates with wind assembling set 14; Exchange pipe II 11 is located at the port on the wall box 12, and double as lower box access hole 1 simultaneously; Wall box 12 lower edges are provided with sewage draining exit 9.Casing water inlet 7 is arranged on wall box 12 lower edges.Casing delivery port 8 is arranged on the upper limb place of wall box 12.Wind assembling set 14, exchange pipe I 10, exchange pipe II 11 do not communicate with the water tank inboard, and the water tank inboard is equipped with heat-absorbing medium---liquid.
The flow trace and the heating process of embodiment two water are: rely on municipal pressure, water enters in the casing 2, and exchange pipe I 10, exchange pipe II 11, wind assembling set 14 and heating furnace heat the water in the casing 2 jointly; Because hot water constantly rises, the water convective principles that cold water constantly descends, casing water inlet 7 is arranged on casing 2 bottoms in addition, and casing delivery port 8 is arranged on casing 2 tops, is the hottest water the casing 2 from the water that casing delivery port 8 extrudes finally by municipal pressure therefore.Present embodiment one is when being used as the energy-saving hot water boiler main water box, when promptly being arranged on the heating furnace, the flow process of hot gas is: rely on the wind apparatus of setting up that pulls out, hot gas enters from the opening part of bottom half exchange pipe I 10, the exchange pipe I 10 that flows through enters wind assembling set 14, enter exchange pipe II 11 by wind assembling set 14 again, finally flow out casing 2; Present embodiment one is when being used as energy-saving hot water boiler pair water tank, the flow process of hot gas is: rely on the wind apparatus of setting up that pulls out, hot gas enters from the openend that exchange pipe II 11 is arranged on the wall box 12, the exchange pipe II11 that flows through goes into wind assembling set 14, enter exchange pipe I 10 by wind assembling set 14 again, flow out casing 2 by exchange pipe I 10.
Embodiment one and embodiment two are the utility model two kinds of embodiments preferably, and other specific embodiment of having done according to the summary of the invention technical scheme is all in the utility model scope.

Claims (8)

1, a kind of water tank for energy-saving hot water boiler which comprises at least casing, case lid and discharge duct; Case lid connects with casing by flange; It is characterized in that: discharge duct is made up of exchange pipe I, exchange pipe II and wind assembling set, wind assembling set is arranged on the top of casing, and the end opening of exchange pipe I is located on the casing diapire, and the other end communicates with wind assembling set, the end of exchange pipe II communicates with wind assembling set, and the other end is opened in the wall box bottom; Casing top is provided with at least one special-purpose access hole, and access hole communicates with wind assembling set, and exchange pipe II is located at the port on the wall box, and double as lower box access hole also is provided with water inlet and delivery port at least on the wall box simultaneously.
2, according to the described a kind of water tank for energy-saving hot water boiler of claim 1, it is characterized in that: described case lid is a hollow cap, fill insulant material in the hollow cap.
3, according to the described a kind of water tank for energy-saving hot water boiler of claim 1, it is characterized in that: described case lid is a hollow cap, and caping is provided with water inlet, and the lid side is provided with delivery port.
4, according to the described a kind of water tank for energy-saving hot water boiler of claim 1, it is characterized in that: in order to strengthen heat insulation effect, make water heating step by step gradually in casing simultaneously, described casing is provided with water jacket layer, water jacket layer is made of wall box and water jacket wall, and water jacket wall is arranged on box house along wall box, and water jacket wall upper limb and wall box upper limb are fixedly connected, the water jacket wall lower edge is shorter than wall box, and is logical to guarantee water and the water in the casing drum in the water jacket.
5, according to the described a kind of water tank for energy-saving hot water boiler of claim 1, it is characterized in that: described exchange pipe I has some.
6, according to the described a kind of water tank for energy-saving hot water boiler of claim 1, it is characterized in that: described exchange pipe II is inverse-T-shaped, and a port communicates with wind assembling set, and two ports are opened in the wall box bottom respectively.
7, according to the described a kind of water tank for energy-saving hot water boiler of claim 3, it is characterized in that: described case lid delivery port connects with the casing water inlet.
8, according to the described a kind of water tank for energy-saving hot water boiler of claim 4, it is characterized in that: the water inlet of described casing is arranged on the wall box upper limb, communicates with water jacket layer; The delivery port of casing is arranged on the middle and upper part of wall box, the upper limb of the corresponding casing drum in its position, and delivery port communicates with the drum of casing.
CNU2009200381667U 2009-01-16 2009-01-16 Water tank for energy-saving hot water boiler Expired - Lifetime CN201344635Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200381667U CN201344635Y (en) 2009-01-16 2009-01-16 Water tank for energy-saving hot water boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200381667U CN201344635Y (en) 2009-01-16 2009-01-16 Water tank for energy-saving hot water boiler

Publications (1)

Publication Number Publication Date
CN201344635Y true CN201344635Y (en) 2009-11-11

Family

ID=41276215

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200381667U Expired - Lifetime CN201344635Y (en) 2009-01-16 2009-01-16 Water tank for energy-saving hot water boiler

Country Status (1)

Country Link
CN (1) CN201344635Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102062470A (en) * 2010-12-27 2011-05-18 朱兴军 Energy-saving water heating furnace
CN101476778B (en) * 2009-01-16 2011-08-10 朱兴军 Water tank for energy-saving hot water boiler

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476778B (en) * 2009-01-16 2011-08-10 朱兴军 Water tank for energy-saving hot water boiler
CN102062470A (en) * 2010-12-27 2011-05-18 朱兴军 Energy-saving water heating furnace
CN102062470B (en) * 2010-12-27 2013-07-03 朱兴军 Energy-saving water heating furnace

Similar Documents

Publication Publication Date Title
CN103123176B (en) Without water supply tank curved mozzle temperature jump heat storage type solar water heater
CN103134197A (en) Double-water-tank air-exhausting flow-guide separation plate solar water heater
CN102943548A (en) Construction curtain wall type flat-plate solar heat collector
CN103134198A (en) Step-leaping type solar heater having no water supplement tank or collect-exhaust diversion clapboard
CN110145877A (en) The explosion-proof synergy water heater of the vacuum tube of phase-change temperature control
CN201344635Y (en) Water tank for energy-saving hot water boiler
CN205717988U (en) Vacuum collecting heat pipe type solar water heater
CN101476778B (en) Water tank for energy-saving hot water boiler
CN202792481U (en) Multi-level layered heat exchange displacement efficient water heater
CN206146005U (en) Heat transfer formula solar water heating system with frostproofing cabin
CN201875968U (en) Heat exchanging water box for solar water heater
CN201885417U (en) Pressure-bearing type vacuum tube solar water heater without water tank
CN103185400B (en) Without water supply tank curving mozzle temperature jump heat storage type solar water heater
CN202485061U (en) Auxiliary energy-saving device of gas stove
CN205717984U (en) Solar water heater
CN201476343U (en) Water vapor double I-shaped solar energy circulating system
CN205425469U (en) Inserted pressure -bearing evacuated -tube solar water heater of no water tank outer wall
CN208688299U (en) A kind of multifunctional heat exchanger
CN103925708A (en) Pressure-bearing balcony-hung solar water heater
CN201508048U (en) Heat accumulation interchange-type solar water heater
CN218120204U (en) Formaldehyde production heat transfer device
CN103123177B (en) Intelligent temperature step heat storage type solar water heater
CN210425534U (en) Reverse heat exchange gas heating stove
CN201429226Y (en) Intelligent superconducting solar water heater
CN203671917U (en) Tubular heat exchanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20091111

Effective date of abandoning: 20090116

AV01 Patent right actively abandoned

Granted publication date: 20091111

Effective date of abandoning: 20090116