CN201340261Y - 将地面水准点高程精确传递到高架桥上的测量装置 - Google Patents
将地面水准点高程精确传递到高架桥上的测量装置 Download PDFInfo
- Publication number
- CN201340261Y CN201340261Y CNU2009203003491U CN200920300349U CN201340261Y CN 201340261 Y CN201340261 Y CN 201340261Y CN U2009203003491 U CNU2009203003491 U CN U2009203003491U CN 200920300349 U CN200920300349 U CN 200920300349U CN 201340261 Y CN201340261 Y CN 201340261Y
- Authority
- CN
- China
- Prior art keywords
- elevation
- measuring prism
- overpass
- tripod
- nail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- A Measuring Device Byusing Mechanical Method (AREA)
Abstract
本实用新型提供一种将地面水准点高程精确传递到高架桥上的测量装置,该装置简单方便且精度高。将地面水准点高程精确传递到高架桥上的测量装置,包括全站仪、三脚架和测量棱镜,还包括带通孔的平板和测钉,所述测量棱镜安装在所述平板的通孔上,在所述测钉上通过三脚架架设全站仪,所述测钉的高程起算点、全站仪视准轴、测量棱镜中心处于同一铅垂线上。本实用新型可以方便的解决水准高程直接上桥的难题,并且精确度高,对观测条件要求宽松,容易操作。
Description
技术领域
本实用新型涉及高架桥上水准点的测量装置,特别是涉及一种将地面水准点高程精确传递到高架桥上的测量装置。
背景技术
我国在高速铁路的修建中采用了大量的桥梁结构,有的桥梁长达数十公里,为保证高速铁路修建的高精度要求,在这些特大桥上、隧道里、路基上都需要建立精密的施工控制网,也称CPIII网。CPIII网是由分布在线路两侧相距大约60m一对的CPIII点组成,每个CPIII点都需测量出精确的平面坐标和高程,然而已知高程的水准点均设置在地面上,如何将地面的水准点高程精确传递到位于高架桥防撞墙上的CPIII点上,一直以来都是困扰高铁建设者的一大难题。由于高差太大,平时用来测量高程的水准仪无法派上用场,测量人员只能借助全站仪,在桥下的水准点上架设全站仪并量取全站仪中心到水准点的高度,在桥上的被测点上利用木脚架或对中杆架架设棱镜并量取棱镜中心到被测点的高度,测量出仪器到棱镜的距离和与水平面的夹角,利用三角函数关系计算出被测点的高程值。这种传统的方法被称为“三角高程测量”法,这种方法需要人为量取仪器高和棱镜高,且需局限在较短的距离内,施测不方便且精度较差。另一种方法是在高架桥上搭设钢管架,将已经经过鉴定的带毫米刻画的钢尺吊挂重锤悬挂至地面,待静止不动后分别在地面和桥面架设带测微器的光学水准仪观测钢尺而获得高程差,这种方法观测条件苛刻,虽然也能解决问题,但无法满足快捷、简便的要求。
实用新型内容
本实用新型所要解决的技术问题是提供一种将地面水准点高程精确传递到高架桥上的测量装置,该装置简单方便且精度高。
本实用新型解决技术问题所采用的技术方案是:将地面水准点高程精确传递到高架桥上的测量装置,包括全站仪、三脚架和测量棱镜,还包括带通孔的平板和测钉,所述测量棱镜安装在所述平板的通孔上,在所述测钉上通过三脚架架设全站仪,所述测钉的高程起算点、全站仪视准轴、测量棱镜中心处于同一铅垂线上。
本实用新型的有益效果是:可以方便的解决水准高程直接上桥的难题,并且精确度高,对观测条件要求宽松,容易操作。
附图说明
图1是本实用新型的示意图。
图2是本实用新型的平板的主视图。
图3是图2的俯视图。
图4是本实用新型的测钉的主视图。
具体实施方式
如图1所示,高架桥上的两个桥墩2之间的箱梁1都预留了多个排水孔3,根据排水孔孔径或两个箱梁1之间的梁缝加工一张平板4,平板中央开一通孔用于放置球型测量棱镜5,通孔半径小于球型测量棱镜的半径,通孔半径大于球型测量棱镜反射面的半径。
如图2和图3所示,上述平板4最好采用金属圆形平板,其上设置有三个着地点9,三个着地点9等角度设置,三个着地点9可以确定一个唯一的平面。上述球型测量棱镜5可采用申请号为2008103046073的球型测量棱镜。
在高架桥排水孔或梁缝正下方的地面上预埋一枚测钉6,如图4所示,测钉6的高程值利用水准仪、水准尺及水准尺适配器等工具从地面已知高程的水准点上精确的引入,在测钉6上利用精密对中三脚架7架设全站仪8。预埋测钉6目的是让此起算点高程稳定可靠,也方便架设全站仪8,精密对中三脚架7可采用专利号为200720079847.9的精密对中三脚架。
测量时取下全站仪8的提手,在全站仪望远镜的目镜处安装上弯管目镜,将全站仪望远镜转动到铅垂方向,将球型测量棱镜反射面朝下放置在金属平板中的通孔中,金属平板三个着地点9朝下放置在排水孔处,根据全站仪弯管目镜中的图像移动平板4,将球型测量棱镜5的中心移动到全站仪8的铅垂方向上。此时测钉6的高程起算点、全站仪视准轴、球型测量棱镜中心均处于同一铅垂线上,球型测量棱镜中心的高程就是测钉处的已知高程+精密对中三脚架的固定高度+全站仪的固定高度+全站仪测量出的到球型测量棱镜中心的距离,然后利用水准仪和水准尺等工具将球型测量棱镜中心的高程传递到防撞墙顶端处CPIII点上。
Claims (6)
1.将地面水准点高程精确传递到高架桥上的测量装置,包括全站仪、三脚架和测量棱镜,其特征在于,还包括带通孔的平板和测钉,所述测量棱镜安装在所述平板的通孔上,在所述测钉上通过三脚架架设全站仪,所述测钉的高程起算点、全站仪视准轴、测量棱镜中心处于同一铅垂线上。
2.如权利要求1所述的将地面水准点高程精确传递到高架桥上的测量装置,其特征在于,所述三脚架为精密对中三脚架。
3.如权利要求1所述的将地面水准点高程精确传递到高架桥上的测量装置,其特征在于,所述平板为金属圆形平板。
4.如权利要求1所述的将地面水准点高程精确传递到高架桥上的测量装置,其特征在于,所述测量棱镜为球型测量棱镜。
5.如权利要求4所述的将地面水准点高程精确传递到高架桥上的测量装置,其特征在于,所述通孔半径小于球型测量棱镜的半径,通孔半径大于球型测量棱镜反射面的半径。
6.如权利要求1所述的将地面水准点高程精确传递到高架桥上的测量装置,其特征在于,所述平板上设置有三个着地点。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009203003491U CN201340261Y (zh) | 2009-01-21 | 2009-01-21 | 将地面水准点高程精确传递到高架桥上的测量装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009203003491U CN201340261Y (zh) | 2009-01-21 | 2009-01-21 | 将地面水准点高程精确传递到高架桥上的测量装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201340261Y true CN201340261Y (zh) | 2009-11-04 |
Family
ID=41235804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2009203003491U Expired - Fee Related CN201340261Y (zh) | 2009-01-21 | 2009-01-21 | 将地面水准点高程精确传递到高架桥上的测量装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201340261Y (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103308030A (zh) * | 2012-12-14 | 2013-09-18 | 北京市测绘设计研究院 | 超高层标高高精度自动传递工艺方法 |
-
2009
- 2009-01-21 CN CNU2009203003491U patent/CN201340261Y/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103308030A (zh) * | 2012-12-14 | 2013-09-18 | 北京市测绘设计研究院 | 超高层标高高精度自动传递工艺方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103499340B (zh) | 一种实现大高差高程竖直传递的测量装置及测量方法 | |
CN104634267B (zh) | 一种桥门式起重机上拱度测量方法 | |
CN101464146B (zh) | 将地面水准点高程精确传递到高架桥上的测量方法及其装置 | |
CN205333053U (zh) | 一种自动扶正式水准仪测量标尺 | |
CN110160488B (zh) | 一种异形钢索塔高程的测量方法及测量装置 | |
CN201318935Y (zh) | 激光测拱仪 | |
CN105444733A (zh) | 一种自动扶正式水准仪测量标尺及测量方法 | |
CN109443327A (zh) | 一种测量控制网的布设方法 | |
CN105735145A (zh) | 一种桥梁转体施工精确对中控制施工方法及其结构 | |
CN110440751A (zh) | 一种深基坑高程传递设备及其使用方法 | |
CN204831274U (zh) | 一种便携式水平高差测量架及测量装置 | |
CN110617757B (zh) | 一种大板梁挠度测量装置及挠度测量方法 | |
CN215572760U (zh) | 一种平面现浇混凝土楼板平整度及标高检测装置 | |
CN204720035U (zh) | 一种室内教学用经纬仪安置装置 | |
CN206847601U (zh) | 一种桥墩施工垂直度测量装置 | |
CN213455234U (zh) | 一种水工环地裂缝测量装置 | |
CN201340261Y (zh) | 将地面水准点高程精确传递到高架桥上的测量装置 | |
CN201094015Y (zh) | 自动目标识别与照准的全站仪 | |
CN204329871U (zh) | 角度测量仪 | |
CN203772295U (zh) | 一种可调整水准标尺观测位置的倒尺尺架 | |
CN201508176U (zh) | 量角仪式水平尺 | |
CN207763695U (zh) | 可单人操作的水准测量装置 | |
CN203502020U (zh) | 定心定高调平基座装置 | |
CN204705352U (zh) | 一种用于测量培训用的对中整平装置 | |
CN204730835U (zh) | 一种起重机检验用全站仪 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091104 Termination date: 20140121 |