CN201336533Y - Cable laying pulley - Google Patents
Cable laying pulley Download PDFInfo
- Publication number
- CN201336533Y CN201336533Y CNU2008202411107U CN200820241110U CN201336533Y CN 201336533 Y CN201336533 Y CN 201336533Y CN U2008202411107 U CNU2008202411107 U CN U2008202411107U CN 200820241110 U CN200820241110 U CN 200820241110U CN 201336533 Y CN201336533 Y CN 201336533Y
- Authority
- CN
- China
- Prior art keywords
- pulley
- cable
- bracket
- fixed
- bolt
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 47
- 239000010959 steel Substances 0.000 claims abstract description 47
- 239000004677 Nylon Substances 0.000 claims abstract description 15
- 229920001778 nylons Polymers 0.000 claims abstract description 15
- 238000010276 construction Methods 0.000 abstract description 7
- 281000116662 General Cable companies 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000004922 lacquers Substances 0.000 description 1
- 239000010410 layers Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 methods Methods 0.000 description 1
- 230000002093 peripheral Effects 0.000 description 1
- 238000004642 transportation engineering Methods 0.000 description 1
Abstract
Description
Technical field
The utility model relates to a kind of cable-laying gear, is specifically related to a kind of cable laying pulley.
Background technology
In the general cable construction of existing special line for passenger trains, cable lays along existing cable trough, and cable trough is finished by construction before the station, and electrified H steel column organized uprightly, and cable trough is positioned at the outside of H steel column.If manually shoulder cable laying before adopting, the H steel column that must detour because power cable is heavier, needs artificial many (average 15 meters people), and particularly on grand bridge, the coefficient of safety of construction is low, and hidden danger is big; If adopt the scheme of unwrapping wire ground car mechanical traction, the outer armour of cable can be worn and torn by concrete cable groove again.
Summary of the invention
The purpose of this utility model: the problem at electrified H steel column on the existing Line for Passenger Transportation has been organized upright and concrete cable groove the cable laying coefficient of safety is low when the unit construction has been finished before the station, hidden danger is big etc. provides the cable laying pulley on a kind of H of being fixed on steel column.
The purpose of this utility model realizes in the following manner:
Described cable laying pulley, it comprises pulley bracket, nylon pulley and band steel support, described nylon pulley is fixed on the pulley bracket by the pulley set bolt, is provided with a cable slip-off preventing bolt on the pulley bracket of nylon pulley upper end; Described band steel support is a long frame shape, and a side of the upside of band steel mid-stent and pulley bracket is fixed, and the downside of band steel mid-stent and the opposite side of pulley bracket are fixed by supporting bracket; On the back side of band steel support, be provided with intermediate plate, can be fixed on the band steel support by the intermediate plate set bolt; Riveted joint has rubber blanket on the inboard of intermediate plate; Offer respectively on four jiaos of band steel cradle back and be convenient to the fixing bolt hole of intermediate plate, because the H steel column has three kinds of models, so two holes up and down on one side of intermediate plate are circular hole, and two holes up and down of another side are slotted hole.
The fixing back load-carrying of cable laying pulley is more than 1000N, and the band steel support is welded by band steel, and 4 intermediate plates of peripheral hardware are used for fixing the H steel column, the rubber blanket on the intermediate plate can, prevent the damage of the outer lacquer of H steel column; In order to prevent that cable comes off from pulley in distraction procedure, so a bolt that prevents that cable from coming off is arranged on pulley bracket.The cable laying pulley is fixed on the position of 1.5 meters of H steel columns, adopts the scheme cabling of artificial traction or mechanical traction.The utility model is applicable to that power cable lays on railway bed, the bridge in cable trough.
Compared with prior art, the utility model has the following advantages when cable laying:
1. avoided crossing electrified H steel column;
2. the laying speed of constructing is fast, has guaranteed finishing smoothly of duration, and the construction quality height can farthest reduce the wearing and tearing to the cable outer layer insulation, has reduced the incidence of cable fault;
3. significantly reduced workmen's labour and labour intensity, needed manually less, laborsaving, the required labour cost of cabling is saved half nearly, also saves half on the physical demands intensity,
4. construction safety does not have the generation of security incident;
5. saved manufacturing cost and use cost, nylon pulley is in light weight, intensity is big, durable in use.
Description of drawings
Fig. 1 is an end view of the present utility model,
Fig. 2 is a front view of the present utility model,
Fig. 3 is a rearview of the present utility model.
Among Fig. 1,1-pulley bracket, 2-nylon pulley, 3-intermediate plate, 4-rubber blanket, 5-intermediate plate set bolt, 6-pulley set bolt, 7-cable slip-off preventing bolt, 8-supporting bracket, 9-band steel support, 10-circular hole, 11-slotted hole.
Embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail.
Among Fig. 1, Fig. 2, described cable laying pulley, it is characterized in that: it comprises pulley bracket 1, nylon pulley 2 and band steel support 9, described nylon pulley 2 is fixed on the pulley bracket 1 by pulley set bolt 6, is provided with a cable slip-off preventing bolt 7 on the pulley bracket 1 of nylon pulley 2 upper ends; Described band steel support 9 is a long frame shape, and the upside at band steel support 9 middle parts and a side of pulley bracket 1 are fixed, and the downside at band steel support 9 middle parts and the opposite side of pulley bracket 1 are fixing by supporting bracket 8; On the back side of band steel support 9, be provided with intermediate plate 3, can be fixed on the band steel support 9 by intermediate plate set bolt 5; Riveted joint has rubber blanket 4 on the inboard of intermediate plate 3.
Fig. 3 is a rearview of the present utility model, on four jiaos of band steel support 9 back sides, offer respectively and be convenient to the bolt hole that intermediate plate 3 is fixed, because the H steel column has three kinds of models, so two holes up and down on one side of intermediate plate are circular hole 10, and two holes up and down of another side are slotted hole 11.
In order to guarantee that the cable laying pulley has the support force of 1000N, pulley bracket 1, band steel support 9 select for use 50mm * 5mm band steel to make, and pulley set bolt 6 is selected φ 12 bolts for use.Intermediate plate 3 selects for use 50mm * 5mm band steel to make.When damaging, nylon pulley 2 can change, as long as pulley set bolt 6 is withdrawed from just passable.
During use, earlier cable is placed on the paying out drum, everyone holds a cable laying pulley and is separately fixed on the adjacent H steel column, cable is passed for 7 times from cable slip-off preventing bolt, and manpower draws cable to next H steel column, gives the personnel at this some place, by that analogy, after cable all launched, the bolt 7 as long as the anti-cable of release comes off just can drop on cable in the cable trough.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202411107U CN201336533Y (en) | 2008-12-30 | 2008-12-30 | Cable laying pulley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202411107U CN201336533Y (en) | 2008-12-30 | 2008-12-30 | Cable laying pulley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201336533Y true CN201336533Y (en) | 2009-10-28 |
Family
ID=41288195
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008202411107U CN201336533Y (en) | 2008-12-30 | 2008-12-30 | Cable laying pulley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201336533Y (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101864841A (en) * | 2010-05-28 | 2010-10-20 | 武汉一冶机电工程有限责任公司 | Integral mounting method of steel-structure factory building wall skin |
CN102957118A (en) * | 2011-08-25 | 2013-03-06 | 李刚 | Angle cable paying-off tackle |
CN102055161B (en) * | 2009-11-03 | 2013-03-27 | 河南省电力公司许昌供电公司 | Setting conductor block device for crossing frame |
CN104538896A (en) * | 2014-12-25 | 2015-04-22 | 国家电网公司 | Electric transmission line disengagement prevention overhead line pulley |
CN104880799A (en) * | 2015-05-29 | 2015-09-02 | 成都亨通光通信有限公司 | Tension adjusting method for fiber traction laying |
CN104880800A (en) * | 2015-05-29 | 2015-09-02 | 成都亨通光通信有限公司 | Regulator capable of realizing fiber rapid transmission |
CN104880794A (en) * | 2015-05-29 | 2015-09-02 | 成都亨通光通信有限公司 | Guiding method for stable traction of optical cable |
CN104917108A (en) * | 2015-05-29 | 2015-09-16 | 成都亨通光通信有限公司 | Transmission device used for cable laying |
CN104914542A (en) * | 2015-05-29 | 2015-09-16 | 成都亨通光通信有限公司 | Protection method used for cable rapid transmission |
CN104914531A (en) * | 2015-05-29 | 2015-09-16 | 成都亨通光通信有限公司 | High-collection-volume optical cable guiding device |
-
2008
- 2008-12-30 CN CNU2008202411107U patent/CN201336533Y/en not_active IP Right Cessation
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102055161B (en) * | 2009-11-03 | 2013-03-27 | 河南省电力公司许昌供电公司 | Setting conductor block device for crossing frame |
CN101864841A (en) * | 2010-05-28 | 2010-10-20 | 武汉一冶机电工程有限责任公司 | Integral mounting method of steel-structure factory building wall skin |
CN102957118A (en) * | 2011-08-25 | 2013-03-06 | 李刚 | Angle cable paying-off tackle |
CN104538896A (en) * | 2014-12-25 | 2015-04-22 | 国家电网公司 | Electric transmission line disengagement prevention overhead line pulley |
CN104538896B (en) * | 2014-12-25 | 2017-09-29 | 国家电网公司 | Transmission line of electricity anti-dropout overhead line pulley |
CN104880800A (en) * | 2015-05-29 | 2015-09-02 | 成都亨通光通信有限公司 | Regulator capable of realizing fiber rapid transmission |
CN104880794A (en) * | 2015-05-29 | 2015-09-02 | 成都亨通光通信有限公司 | Guiding method for stable traction of optical cable |
CN104917108A (en) * | 2015-05-29 | 2015-09-16 | 成都亨通光通信有限公司 | Transmission device used for cable laying |
CN104914542A (en) * | 2015-05-29 | 2015-09-16 | 成都亨通光通信有限公司 | Protection method used for cable rapid transmission |
CN104914531A (en) * | 2015-05-29 | 2015-09-16 | 成都亨通光通信有限公司 | High-collection-volume optical cable guiding device |
CN104880799A (en) * | 2015-05-29 | 2015-09-02 | 成都亨通光通信有限公司 | Tension adjusting method for fiber traction laying |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205501818U (en) | Steel trussed arch bridge bridge tool car | |
EP2133304B1 (en) | Hoisting crane and offshore vessel | |
US20190136570A1 (en) | Tower segment handling method and apparatus | |
RU2587746C2 (en) | Method for connection of sections of crane suspension assembly and gate unit used therein | |
CN103026060B (en) | For the system and method for handling wind turbine tower sections | |
RU2514561C2 (en) | Self-propelled hoisting crane and method of its disassembly, transportation and adjustment | |
JP5318538B2 (en) | Steel structure construction method | |
AU2006338693B2 (en) | Method and system for hoisting heavy parts onto a wind turbine | |
CN201962988U (en) | Cantilever type double-layered parking equipment | |
EP3132138B1 (en) | Rotational lifting tool | |
CN201240810Y (en) | Novel manual hoister | |
WO2011050812A1 (en) | Device for establishing admittance and transport of cargo to and from a wind turbine construction above ground level | |
CN1958960B (en) | Cable detection vehicle | |
EP2278094B1 (en) | Multi-purpose load lifting working platform or/and composite bridge structure | |
CN104066974A (en) | Holding system for blades of a wind turbine, transport system and method of transporting blades of a wind turbine therewith | |
CN102797222B (en) | Hanging bracket hinge joint type bridge maintenance vehicle capable of avoiding bridge-side obstacles | |
CN102030076B (en) | Cabin entry process for main diesel generating set of 50,000-ton semi-submerged ship | |
US10081510B2 (en) | Device and method for winding and unwinding a parallel wire strand horizontally | |
CN101746480A (en) | Technique for assembling large revolving crane on crane ship | |
EP2653613B1 (en) | Method for horizontal winding and horizontal unwinding parallel stell stranded wire | |
CN101983287A (en) | A method for handling and/or servicing components of a wind turbine and a gripping apparatus for performing the method | |
CN101987651B (en) | Assembling method and assembling bracket of total segments of small ship | |
US10119229B1 (en) | Work platform rail system | |
CN202273179U (en) | High-altitude steel cable suspended working platform for construction and maintenance on outer side of bridge box girder | |
EP3095750B1 (en) | Method for inspecting an inside room of a ship and/or performing works therein |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
C14 | Grant of patent or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20091016 Address after: 347, Zhongshan Road, Wuchang District, Hubei, Wuhan Province, 430071 Co-patentee after: The Electrical Service Engineering Co., Ltd. of China Railway 11th Group Patentee after: China Railway eleven Bureau Group Co., Ltd. Co-patentee after: Nanfang Engineering Co., Ltd. of China Railway Construction Electrification Bureau Group Co., Ltd. Address before: 347, Zhongshan Road, Wuchang District, Hubei, Wuhan Province, 430071 Co-patentee before: The Electrical Service Engineering Co., Ltd. of China Railway 11th Group Patentee before: China Railway eleven Bureau Group Co., Ltd. |
|
C41 | Transfer of patent application or patent right or utility model | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091028 Termination date: 20171230 |
|
CF01 | Termination of patent right due to non-payment of annual fee |