CN201336533Y - Cable laying pulley - Google Patents

Cable laying pulley Download PDF

Info

Publication number
CN201336533Y
CN201336533Y CNU2008202411107U CN200820241110U CN201336533Y CN 201336533 Y CN201336533 Y CN 201336533Y CN U2008202411107 U CNU2008202411107 U CN U2008202411107U CN 200820241110 U CN200820241110 U CN 200820241110U CN 201336533 Y CN201336533 Y CN 201336533Y
Authority
CN
China
Prior art keywords
pulley
cable
bracket
fixed
band steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202411107U
Other languages
Chinese (zh)
Inventor
金靖升
杨明波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
South Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
China Railway 11th Bureau Group Electric Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Electric Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Electric Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CNU2008202411107U priority Critical patent/CN201336533Y/en
Application granted granted Critical
Publication of CN201336533Y publication Critical patent/CN201336533Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a cable laying pulley, belonging to the construction tool for laying the cable, in particular to a novel cable setting-out pulley which is suitable for being laid along the existing cable trough, wherein, the H-type steel bar of the cable laying pulley is assembled. The utility model is characterized in that the cable laying pulley comprises a pulley bracket, a nylon pulley and a flat steel bracket; The nylon pulley is fixed on the pulley bracket by a pulley fixed bolt ; the pulley bracket at the upper end of the nylon pulley is provided with a cable anti-dropping bolt; the flat steel bracket is in a long frame shape; the upper side of the middle part of the flat steel bracket is fixed with one side of the pulley bracket; the lower side of the middle part of the flat steel bracket is fixed with the other side of the pulley bracket by a support plate; the back of the flat steel bracket is provided with a clip, and the clip is fixed on the flat steel bracket by a clip fixed bolt. The utility model is suitable for the power cables of a railroad bed and a bridge to be laid in the cable trough; the loading performance of the pulley is strong; the laying speed is fast and the loading and the unloading are convenient; the utility model has the advantages of labor saving, time saving, strength saving and safe operation.

Description

The cable laying pulley
Technical field
The utility model relates to a kind of cable-laying gear, is specifically related to a kind of cable laying pulley.
Background technology
In the general cable construction of existing special line for passenger trains, cable lays along existing cable trough, and cable trough is finished by construction before the station, and electrified H steel column organized uprightly, and cable trough is positioned at the outside of H steel column.If manually shoulder cable laying before adopting, the H steel column that must detour because power cable is heavier, needs artificial many (average 15 meters people), and particularly on grand bridge, the coefficient of safety of construction is low, and hidden danger is big; If adopt the scheme of unwrapping wire ground car mechanical traction, the outer armour of cable can be worn and torn by concrete cable groove again.
Summary of the invention
The purpose of this utility model: the problem at electrified H steel column on the existing Line for Passenger Transportation has been organized upright and concrete cable groove the cable laying coefficient of safety is low when the unit construction has been finished before the station, hidden danger is big etc. provides the cable laying pulley on a kind of H of being fixed on steel column.
The purpose of this utility model realizes in the following manner:
Described cable laying pulley, it comprises pulley bracket, nylon pulley and band steel support, described nylon pulley is fixed on the pulley bracket by the pulley set bolt, is provided with a cable slip-off preventing bolt on the pulley bracket of nylon pulley upper end; Described band steel support is a long frame shape, and a side of the upside of band steel mid-stent and pulley bracket is fixed, and the downside of band steel mid-stent and the opposite side of pulley bracket are fixed by supporting bracket; On the back side of band steel support, be provided with intermediate plate, can be fixed on the band steel support by the intermediate plate set bolt; Riveted joint has rubber blanket on the inboard of intermediate plate; Offer respectively on four jiaos of band steel cradle back and be convenient to the fixing bolt hole of intermediate plate, because the H steel column has three kinds of models, so two holes up and down on one side of intermediate plate are circular hole, and two holes up and down of another side are slotted hole.
The fixing back load-carrying of cable laying pulley is more than 1000N, and the band steel support is welded by band steel, and 4 intermediate plates of peripheral hardware are used for fixing the H steel column, the rubber blanket on the intermediate plate can, prevent the damage of the outer lacquer of H steel column; In order to prevent that cable comes off from pulley in distraction procedure, so a bolt that prevents that cable from coming off is arranged on pulley bracket.The cable laying pulley is fixed on the position of 1.5 meters of H steel columns, adopts the scheme cabling of artificial traction or mechanical traction.The utility model is applicable to that power cable lays on railway bed, the bridge in cable trough.
Compared with prior art, the utility model has the following advantages when cable laying:
1. avoided crossing electrified H steel column;
2. the laying speed of constructing is fast, has guaranteed finishing smoothly of duration, and the construction quality height can farthest reduce the wearing and tearing to the cable outer layer insulation, has reduced the incidence of cable fault;
3. significantly reduced workmen's labour and labour intensity, needed manually less, laborsaving, the required labour cost of cabling is saved half nearly, also saves half on the physical demands intensity,
4. construction safety does not have the generation of security incident;
5. saved manufacturing cost and use cost, nylon pulley is in light weight, intensity is big, durable in use.
Description of drawings
Fig. 1 is an end view of the present utility model,
Fig. 2 is a front view of the present utility model,
Fig. 3 is a rearview of the present utility model.
Among Fig. 1,1-pulley bracket, 2-nylon pulley, 3-intermediate plate, 4-rubber blanket, 5-intermediate plate set bolt, 6-pulley set bolt, 7-cable slip-off preventing bolt, 8-supporting bracket, 9-band steel support, 10-circular hole, 11-slotted hole.
Embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail.
Among Fig. 1, Fig. 2, described cable laying pulley, it is characterized in that: it comprises pulley bracket 1, nylon pulley 2 and band steel support 9, described nylon pulley 2 is fixed on the pulley bracket 1 by pulley set bolt 6, is provided with a cable slip-off preventing bolt 7 on the pulley bracket 1 of nylon pulley 2 upper ends; Described band steel support 9 is a long frame shape, and the upside at band steel support 9 middle parts and a side of pulley bracket 1 are fixed, and the downside at band steel support 9 middle parts and the opposite side of pulley bracket 1 are fixing by supporting bracket 8; On the back side of band steel support 9, be provided with intermediate plate 3, can be fixed on the band steel support 9 by intermediate plate set bolt 5; Riveted joint has rubber blanket 4 on the inboard of intermediate plate 3.
Fig. 3 is a rearview of the present utility model, on four jiaos of band steel support 9 back sides, offer respectively and be convenient to the bolt hole that intermediate plate 3 is fixed, because the H steel column has three kinds of models, so two holes up and down on one side of intermediate plate are circular hole 10, and two holes up and down of another side are slotted hole 11.
In order to guarantee that the cable laying pulley has the support force of 1000N, pulley bracket 1, band steel support 9 select for use 50mm * 5mm band steel to make, and pulley set bolt 6 is selected φ 12 bolts for use.Intermediate plate 3 selects for use 50mm * 5mm band steel to make.When damaging, nylon pulley 2 can change, as long as pulley set bolt 6 is withdrawed from just passable.
During use, earlier cable is placed on the paying out drum, everyone holds a cable laying pulley and is separately fixed on the adjacent H steel column, cable is passed for 7 times from cable slip-off preventing bolt, and manpower draws cable to next H steel column, gives the personnel at this some place, by that analogy, after cable all launched, the bolt 7 as long as the anti-cable of release comes off just can drop on cable in the cable trough.

Claims (3)

1. cable laying pulley, it is characterized in that: it comprises pulley bracket (1), nylon pulley (2) and band steel support (9); Described nylon pulley (2) is fixed on the pulley bracket (1) by pulley set bolt (6), is provided with a cable slip-off preventing bolt (7) on the pulley bracket (1) of nylon pulley (2) upper end; Described band steel support (9) is a long frame shape, the upside at band steel support (9) middle part and a side of pulley bracket (1) are fixed, the downside at band steel support (9) middle part and the opposite side of pulley bracket (1) are fixing by supporting bracket (8), be provided with intermediate plate (3) at the back side of band steel support (9), intermediate plate (3) is fixed on the band steel support (9) by intermediate plate set bolt (5).
2. cable laying pulley according to claim 1 is characterized in that: riveted joint has rubber blanket (4) on the inboard of intermediate plate (3).
3. cable laying pulley according to claim 1, it is characterized in that: on four jiaos of band steel support (9) back side, offer respectively and be convenient to the fixing bolt hole of intermediate plate (3), two holes up and down on one side are circular hole (10), and two holes up and down of another side are slotted hole (11).
CNU2008202411107U 2008-12-30 2008-12-30 Cable laying pulley Expired - Fee Related CN201336533Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202411107U CN201336533Y (en) 2008-12-30 2008-12-30 Cable laying pulley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202411107U CN201336533Y (en) 2008-12-30 2008-12-30 Cable laying pulley

Publications (1)

Publication Number Publication Date
CN201336533Y true CN201336533Y (en) 2009-10-28

Family

ID=41288195

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202411107U Expired - Fee Related CN201336533Y (en) 2008-12-30 2008-12-30 Cable laying pulley

Country Status (1)

Country Link
CN (1) CN201336533Y (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864841A (en) * 2010-05-28 2010-10-20 武汉一冶机电工程有限责任公司 Integral mounting method of steel-structure factory building wall skin
CN102957118A (en) * 2011-08-25 2013-03-06 李刚 Angle cable paying-off tackle
CN102055161B (en) * 2009-11-03 2013-03-27 河南省电力公司许昌供电公司 Setting conductor block device for crossing frame
CN104538896A (en) * 2014-12-25 2015-04-22 国家电网公司 Electric transmission line disengagement prevention overhead line pulley
CN104880800A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Regulator capable of realizing fiber rapid transmission
CN104880799A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Tension adjusting method for fiber traction laying
CN104880794A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Guiding method for stable traction of optical cable
CN104914531A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 High-collection-volume optical cable guiding device
CN104917108A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 Transmission device used for cable laying
CN104914542A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 Protection method used for cable rapid transmission
CN107310967A (en) * 2017-07-24 2017-11-03 天津山旗线缆有限公司 A kind of cable laying protection support

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055161B (en) * 2009-11-03 2013-03-27 河南省电力公司许昌供电公司 Setting conductor block device for crossing frame
CN101864841A (en) * 2010-05-28 2010-10-20 武汉一冶机电工程有限责任公司 Integral mounting method of steel-structure factory building wall skin
CN102957118A (en) * 2011-08-25 2013-03-06 李刚 Angle cable paying-off tackle
CN104538896A (en) * 2014-12-25 2015-04-22 国家电网公司 Electric transmission line disengagement prevention overhead line pulley
CN104538896B (en) * 2014-12-25 2017-09-29 国家电网公司 Transmission line of electricity anti-dropout overhead line pulley
CN104880800A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Regulator capable of realizing fiber rapid transmission
CN104880799A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Tension adjusting method for fiber traction laying
CN104880794A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Guiding method for stable traction of optical cable
CN104914531A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 High-collection-volume optical cable guiding device
CN104917108A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 Transmission device used for cable laying
CN104914542A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 Protection method used for cable rapid transmission
CN107310967A (en) * 2017-07-24 2017-11-03 天津山旗线缆有限公司 A kind of cable laying protection support

Similar Documents

Publication Publication Date Title
CN201336533Y (en) Cable laying pulley
CN102583175B (en) The method that hoisting crane suspended rack assembly section is linked together and the frame installation assembly of use thereof
JP4554491B2 (en) Cable inspection car
CN202282579U (en) Track cable drum carriage
CN105800490A (en) Method for replacing crane main hook steel wire rope
CN202322008U (en) Movable and adjustable multi-functional hoisting frame
CN104527691A (en) Mounting method and mounting bases for locomotive underframe parts
CN103545759B (en) Marine cable laying ship back twist frame device
CN104528526A (en) Prefabricated ballastless track board air turning device
CN110877704A (en) Shipboard installation method of large ship equipment
CN201392996Y (en) Power capacitor replacing device
CN104210411A (en) Transportation device and method for loading and transporting heavy equipment
WO2014035288A1 (en) Mobile multi-tier automatic car park
KR101028631B1 (en) Movable bridge inspection equipment
CN202079088U (en) Flexible safety cover plate of coil car
CN203742212U (en) Vehicle carrying plate used for three-dimensional parking place device
CN209973522U (en) Automobile scale module transport vehicle for oven
CN210419067U (en) Movable plate lifting device for ship box body repair
CN203601948U (en) Transporting system of electrical equipment spare parts
CN112160248B (en) Combined steel beam and steel formwork laying device and method
CN218662277U (en) Marine transportation binding device for whole machine transportation of large portal crane
CN205204783U (en) Hoisting accessory is changed to rail vehicle accessory
CN103373670A (en) Point switch machine hand-operated automobile installation specialized crane
CN204369434U (en) Prefabricated non-slag rail plate air turning device
CN204184232U (en) The conveying arrangement of heavy wares shipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20091016

Address after: 347, Zhongshan Road, Wuchang District, Hubei, Wuhan Province, 430071

Co-patentee after: The Electrical Service Engineering Co., Ltd. of China Railway 11th Group

Patentee after: China Railway eleven Bureau Group Co., Ltd.

Co-patentee after: Nanfang Engineering Co., Ltd. of China Railway Construction Electrification Bureau Group Co., Ltd.

Address before: 347, Zhongshan Road, Wuchang District, Hubei, Wuhan Province, 430071

Co-patentee before: The Electrical Service Engineering Co., Ltd. of China Railway 11th Group

Patentee before: China Railway eleven Bureau Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091028

Termination date: 20171230

CF01 Termination of patent right due to non-payment of annual fee