CN201336533Y - Laying cable pulley - Google Patents

Laying cable pulley Download PDF

Info

Publication number
CN201336533Y
CN201336533Y CNU2008202411107U CN200820241110U CN201336533Y CN 201336533 Y CN201336533 Y CN 201336533Y CN U2008202411107 U CNU2008202411107 U CN U2008202411107U CN 200820241110 U CN200820241110 U CN 200820241110U CN 201336533 Y CN201336533 Y CN 201336533Y
Authority
CN
China
Prior art keywords
pulley
bracket
cable
fixed
clip
Prior art date
Application number
CNU2008202411107U
Other languages
Chinese (zh)
Inventor
金靖升
杨明波
Original Assignee
中铁十一局集团有限公司
中铁十一局集团电务工程有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁十一局集团有限公司, 中铁十一局集团电务工程有限公司 filed Critical 中铁十一局集团有限公司
Priority to CNU2008202411107U priority Critical patent/CN201336533Y/en
Application granted granted Critical
Publication of CN201336533Y publication Critical patent/CN201336533Y/en

Links

Abstract

The utility model relates to a cable laying pulley, belonging to the construction tool for laying the cable, in particular to a novel cable setting-out pulley which is suitable for being laid along the existing cable trough, wherein, the H-type steel bar of the cable laying pulley is assembled. The utility model is characterized in that the cable laying pulley comprises a pulley bracket, a nylon pulley and a flat steel bracket; The nylon pulley is fixed on the pulley bracket by a pulley fixed bolt ; the pulley bracket at the upper end of the nylon pulley is provided with a cable anti-dropping bolt; the flat steel bracket is in a long frame shape; the upper side of the middle part of the flat steel bracket is fixed with one side of the pulley bracket; the lower side of the middle part of the flat steel bracket is fixed with the other side of the pulley bracket by a support plate; the back of the flat steel bracket is provided with a clip, and the clip is fixed on the flat steel bracket by a clip fixed bolt. The utility model is suitable for the power cables of a railroad bed and a bridge to be laid in the cable trough; the loading performance of the pulley is strong; the laying speed is fast and the loading and the unloading are convenient; the utility model has the advantages of labor saving, time saving, strength saving and safe operation.

Description

电缆敷设滑轮 Laying cable pulley

技术领域 FIELD

本实用新型涉及一种电缆敷设装置,具体涉及一种电缆敷设滑轮。 The present invention relates to a cable laying apparatus, particularly relates to a cable laying pulley. 背景技术在现有铁路客运专线一般的电缆施工中,电缆沿既有电缆槽敷设,电缆槽已经由站前施工完成,并且电气化的H型钢柱己经组立,电缆槽位于H型钢柱的外侧。 Background Art In general the existing railway passenger dedicated cable construction, the cable is laid along the existing cable trays, cable ducts have been completed before the construction of the station, and electrification of H-steel column group already established, cable ducts located outside the H-shaped steel column . 如果采用以前的人工扛电缆敷设,必须要绕行H型钢柱,由于电力电缆较重,需要人工多(平均15米一个人),特别是在特大桥上,施工的安全系数低,隐患大;如果采用放线地车机械牵引的方案,电缆外铠又会被混凝土电缆槽磨损。 If previous manual carry cabling, must detour H-type steel column, because the power cables are heavy, require manual and more (an average of 15 meters a person), especially in the large bridge, construction of low safety factor, high risk; If the program Actinomyces mechanical traction vehicle, the cable outer cable sheath will be worn concrete trough. 发明内容本实用新型的目的:针对现有客运专线上电气化的H钢柱已经组立及混凝土电缆槽已经由站前单位施工完成时电缆敷设安全系数低、隐患大等的问题,提供一种可固定在H型钢柱上的电缆敷设滑轮。 SUMMARY OF THE INVENTION Objective of the present invention: Li has been set for the conventional electric steel columns and concrete H passenger dedicated cable channel has a low construction when the station before the completion of cable laying unit safety factor, big problems such risks, to provide a H-beam column fixed pulley cabling. 本实用新型的目的是通过以下方式实现的:所述的电缆敷设滑轮,它包括滑轮支架、尼龙滑轮和扁钢支架,所述的尼龙滑轮通过滑轮固定螺检固定在滑轮支架上,在尼龙滑轮上端的滑轮支架上设有一个电缆防脱落螺栓;所述的扁钢支架为长框形,扁钢支架中部的上侧与滑轮支架的一侧固定,扁钢支架中部的下侧与滑轮支架的另一侧通过支撑板固定;在扁钢支架的背面上设有夹片,可通过夹片固定螺栓固定在扁钢 The object of the present invention is achieved by: laying the cable pulley, which comprises a pulley bracket, and flat nylon pulley bracket, the subject is fixed on a nylon pulley sheave pulley fixed to the bracket by screw, the nylon pulley an upper end provided with a cable sheave bracket off preventing bolt; flat bracket for the long frame shape, the flat upper side of the holder with the central side of the fixed pulley bracket, the lower side of the holder in the middle of the flat pulley bracket the other side is fixed by the supporting plate; clip provided on the back surface of the flat steel bracket, by fixing clips bolted flat

支架上;在夹片的内侧上铆接有橡胶垫;在扁钢支架背面的四角上分别开设有便于夹片固定的螺栓孔,由于H型钢柱有三种型号,因此夹片的一边的上下两孔为圆孔,另一边的上下两孔为长圆孔。 Bracket; clip on the inside with a caulking rubber; defines a bolt hole facilitates clip fixed at the four corners of the flat back surface of the stent, respectively, due to the three models H-steel columns, so the upper and lower clip side aperture a round hole, two holes up and down the other side of the long hole. 电缆敷设滑轮固定后载重在1000N以上,扁钢支架由扁钢焊接而成,外设4个夹片,用来固定H型钢柱,夹片上的橡胶垫可,防止H型钢柱外漆的损坏;为了防止在牵引过程中电缆从滑轮上脱落,故在滑轮支架上有一个防止电缆脱落的螺栓。 Cabling load sheave fixed to the rear than 1000N, flat steel bracket welded together by a flat, peripheral four clips, H-steel column for fixing the rubber pad clip can prevent damage to the outer paint H-steel column; in order to prevent the cable from coming off the traction sheave in the process, so there is a bolt to prevent falling off of the cable on the pulley bracket. 电缆敷设滑轮固定在H型钢柱1.5米的位置上,采用人工牵引或者机械牵引的方案敷设电缆。 Cabling pulley fixed position 1.5 m H-steel columns, the use of the program or traction cable laying artificial mechanical traction. 本实用新型适用于铁路路基、桥梁上电力电缆在电缆槽中敷设。 The present invention applies to the railway roadbed, bridges power cable laying in cable trays. 与现有技术相比,本实用新型在电缆铺设时具有以下优点:① 避免了翻越电气化的H型钢柱;② 施工敷设速度快,保证了工期的顺利完成,施工质量高,能最大程度地减少对电缆外层绝缘的磨损,减少了电缆故障的发生率;③ 大大减少了施工人员的劳力及劳动强度,需人工少、省力,敷设电缆所需的人工费将近节约一半,体力消耗强度上也节约一半,④ 施工安全,没有安全事故的发生;⑤ 节约了制造和使用成本,尼龙滑轮重量轻、强度大、经久耐用。 Compared with the prior art, the present invention has the advantage that the laying of the cable: ① avoid crossing the electrification of H-steel column; ② quick construction laying speed, to ensure a successful completion of duration, high quality construction, to reduce to the greatest extent cable outer insulation wear, reduced the incidence of faulty cable; ③ greatly reducing the labor intensity of the labor and construction personnel, require less labor and effort required, cabling saving labor costs nearly half, physical exertion on the strength save half, ④ construction safety, no safety accidents; ⑤ and saving manufacturing cost, nylon pulley light weight, strength, durability. 附图说明图l是本实用新型的侧视图, 图2为本实用新型的主视图,图3为本实用新型的后视图。 BRIEF DESCRIPTION OF DRAWINGS Figure l is a side view of the utility of this novel, FIG. 2 is a front view of the present utility novel, FIG. 3 is a rear view of the invention. 图1中,l一滑轮支架,2—尼龙滑轮,3—夹片,4一橡胶垫,5—夹片 In FIG 1, l a sheave bracket, nylon pulley 2-, 3- clip, a rubber pad 4, 5-clips

固定螺栓,6—滑轮固定螺栓,7—电缆防脱落螺栓,8—支撑板,9—扁钢支架,10—圆孔,ll一长圆孔。 A fixing bolt, the fixing bolt pulley 6-, 7- off preventing cable bolt, the support plate 8-, 9- flat steel bracket, 10 round hole, ll an oblong hole. 具体实施方式下面结合附图对本实用新型作进一步的详细描述。 DETAILED DESCRIPTION The following detailed description of the invention in conjunction with the accompanying drawings further. 图l、图2中,所述的电缆敷设滑轮,其特征在于:它包括滑轮支架l、尼龙滑轮2和扁钢支架9,所述的尼龙滑轮2通过滑轮固定螺栓6固定在滑轮支架1上,在尼龙滑轮2上端的滑轮支架1上设有一个电缆防脱落螺栓7; 所述的扁钢支架9为长框形,扁钢支架9中部的上侧与滑轮支架1的一侧固定,扁钢支架9中部的下侧与滑轮支架1的另一侧通过支撑板8固定;在扁钢支架9的背面上设有夹片3,可通过夹片固定螺栓5固定在扁钢支架9上; 在夹片3的内侧上铆接有橡胶垫4。 FIG. L, in FIG. 2, the cabling pulley, characterized in that: it comprises a pulley bracket L, nylon pulley 2 and the flat support 9, the nylon pulley fixing bolt 6 by a pulley 2 fixed on the sheave bracket 1 is provided on an upper end 2 1 a nylon pulley sheave bracket off preventing cable bolt 7; 9, the stent flat elongated frame-shaped, flat central fixed bracket 9 side of the upper side of a sheave bracket, flat the other side of the lower side of the central sheave bracket 9 fixed to the steel frame 1 through a support plate 8; clip provided on the back surface of the flat steel bracket 9 3, clip by a fixing bolt 5 is fixed to the flat support 9; on the inner side of the clip 3 has caulking rubber pad 4. 图3为本实用新型的后视图,在扁钢支架9背面的四角上分别开设有便于夹片3固定的螺栓孔,由于H型钢柱有三种型号,因此夹片的一边的上下两孔为圆孔IO,另一边的上下两孔为长圆孔ll。 Figure 3 is a rear view of the new utility, at the four corners of the rear surface 9 are flat bracket defines facilitate clip fixing bolt hole 3, since H-steel columns three models, so the upper and lower side of the clip hole is circular hole IO, on the other side of the hole for the upper and lower long hole ll. 为了保证电缆敷设滑轮有1000N的支撑力,滑轮支架1、扁钢支架9选用50mmX5mm扁钢制成,滑轮固定螺栓6选用d) 12螺栓。 In order to ensure a supporting force pulley cabling of 1000N, a sheave bracket, the bracket 9 is made of flat steel flat 50mmX5mm selection, selection of the pulley fixing bolt 6 d) 12 bolts. 夹片3选用50匪X5皿扁钢制成。 3 selected clip 50 made of flat steel bandit X5 dish. 尼龙滑轮2损坏时可以进行更换,只要把滑轮固定螺栓6 退出就可以。 Can be replaced when damaged nylon pulley 2, as long as the pulley fixing bolt 6 can exit. 使用时,先将电缆放置在电缆放线盘上,.每人拿着一个电缆敷设滑轮分别固定在相邻的H型钢柱上,将电缆从电缆防脱落螺栓7下穿过,人力拉电缆至下个H型钢柱,交与该点处的人员,以此类推,电缆全部展开后,只要推出防电缆脱落螺栓7,就可以把电缆落在电缆槽中。 In use, the first cable placed on the cable pay-off reel. Cabling person holding a pulley fixed adjacent each H-beam column, the cable is disconnected from the cable bolt 7 passes through the anti-human to pull cable next H-steel columns, and personnel at the cross point, and so on, all the cable deployment, as long as the introduction of anti-off cable bolt 7, the cable can fall cable channel.

Claims (1)

1. 一种电缆敷设滑轮,其特征在于:它包括滑轮支架(1)、尼龙滑轮(2)和扁钢支架(9);所述的尼龙滑轮(2)通过滑轮固定螺栓(6)固定在滑轮支架(1)上,在尼龙滑轮(2)上端的滑轮支架(1)上设有一个电缆防脱落螺栓(7);所述的扁钢支架(9)为长框形,扁钢支架(9)中部的上侧与滑轮支架(1)的一侧固定,扁钢支架(9)中部的下侧与滑轮支架(1) 的另一侧通过支撑板(8)固定,在扁钢支架(9)的背面设有夹片(3),夹片(3)通过夹片固定螺栓(5)固定在扁钢支架(9)上。 A pulley cable laying, characterized in that: it comprises a pulley bracket (1), nylon pulley (2) and the flat support (9); the nylon pulley (2) is fixed by a pulley fixing bolt (6) pulley bracket (1), the nylon pulley (2) upper end is provided with a cable sheave bracket off preventing bolt (7) (1); flat support (9) of the frame-shaped elongated, flat holder ( 9) the middle of the upper side of the pulley bracket (1) fixed, flat steel bracket (9) on the other side the lower side of the sheave bracket (1) by a middle supporting plate (8) is fixed, the flat holder ( the back 9) is provided with clips (3), the clip (3)) is fixed to the flat support (9) by clip fixing bolts (5. 2. 根据权利要求l所述的电缆敷设滑轮,其特征在于:在夹片(3)的内侧上铆接有橡胶垫(4)。 The pulley cable laying according to claim l, wherein: the caulking a rubber pad (4) on the inside of the clip (3). 3. 根据权利要求1所述的电缆敷设滑轮,其特征在于:在扁钢支架(9) 背面的四角上分别开设有便于夹片(3)固定的螺栓孔, 一边的上下两孔为圆孔(10),另一边的上下两孔为长圆孔(11)。 The cabling pulley according to claim 1, wherein: the flat support (9) respectively provided on the back surface are four corners to facilitate clip (3) a bolt-hole, two upper and lower side of the hole is a circular hole (10), the other two holes down one side of an oblong hole (11).
CNU2008202411107U 2008-12-30 2008-12-30 Laying cable pulley CN201336533Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202411107U CN201336533Y (en) 2008-12-30 2008-12-30 Laying cable pulley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202411107U CN201336533Y (en) 2008-12-30 2008-12-30 Laying cable pulley

Publications (1)

Publication Number Publication Date
CN201336533Y true CN201336533Y (en) 2009-10-28

Family

ID=41288195

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202411107U CN201336533Y (en) 2008-12-30 2008-12-30 Laying cable pulley

Country Status (1)

Country Link
CN (1) CN201336533Y (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864841A (en) * 2010-05-28 2010-10-20 武汉一冶机电工程有限责任公司 Integral mounting method of steel-structure factory building wall skin
CN102957118A (en) * 2011-08-25 2013-03-06 李刚 Angle cable paying-off tackle
CN102055161B (en) * 2009-11-03 2013-03-27 河南省电力公司许昌供电公司 Setting conductor block device for crossing frame
CN104538896A (en) * 2014-12-25 2015-04-22 国家电网公司 Electric transmission line disengagement prevention overhead line pulley
CN104880799A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Tension adjusting method for fiber traction laying
CN104880794A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Guiding method for stable traction of optical cable
CN104880800A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Regulator capable of realizing fiber rapid transmission
CN104914531A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 High-collection-volume optical cable guiding device
CN104914542A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 Protection method used for cable rapid transmission
CN104917108A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 Transmission device used for cable laying

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055161B (en) * 2009-11-03 2013-03-27 河南省电力公司许昌供电公司 Setting conductor block device for crossing frame
CN101864841A (en) * 2010-05-28 2010-10-20 武汉一冶机电工程有限责任公司 Integral mounting method of steel-structure factory building wall skin
CN102957118A (en) * 2011-08-25 2013-03-06 李刚 Angle cable paying-off tackle
CN104538896A (en) * 2014-12-25 2015-04-22 国家电网公司 Electric transmission line disengagement prevention overhead line pulley
CN104538896B (en) * 2014-12-25 2017-09-29 国家电网公司 Transmission line of electricity anti-dropout overhead line pulley
CN104880794A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Guiding method for stable traction of optical cable
CN104880800A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Regulator capable of realizing fiber rapid transmission
CN104914531A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 High-collection-volume optical cable guiding device
CN104914542A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 Protection method used for cable rapid transmission
CN104917108A (en) * 2015-05-29 2015-09-16 成都亨通光通信有限公司 Transmission device used for cable laying
CN104880799A (en) * 2015-05-29 2015-09-02 成都亨通光通信有限公司 Tension adjusting method for fiber traction laying

Similar Documents

Publication Publication Date Title
CN2597531Y (en) Single rope face tracting rope hanging cage
CN102052935B (en) Single tower cable-stayed bridge model test system based on damage identification
CN101823177A (en) Submerged-arc welding process of large-size cylinder body
CN201937210U (en) Take-up and pay-off cable cart with function of automatic cable laying
CN2412301Y (en) Four-column bridge live-wire work crossing rack
CN1865593A (en) Bidirectional pretensioning method prestressed concrete railway board and assembly machine sets method production process
CN201228206Y (en) Self-made small-sized hoisting machine
CN202704923U (en) Cover plate lifting device
CN101364718A (en) Heavy cable laying system and laying method
CN101518784B (en) Hoisting method of large mill housing under limited hoisting height
CN102290742B (en) Tension stringing construction technology
CN102267664A (en) Use of the method lifting beam bridge crane and mounting method of the process
CN201746251U (en) Pole lifting device
CN102407397A (en) Construction method for improving fatigue strength of welding joint of orthotropic steel bridge deck
CN101580890A (en) Trolley assembly annealing furnace
CN101597960A (en) Large-tonnage jack tension construction technology for non-bonded prestressed silo
CN102330414A (en) Hanging basket cantilever method construction method of large-span continuous rigid beam sidespan cast-in-place beam section
KR101462842B1 (en) Apparatus and method for installing underground cable using vehicle
CN101899905A (en) Hoisting slide devices and hoisting slide equipment
CN201649678U (en) Semi-automatic safety protective shed for high-rise building construction
CN201495036U (en) Device for mounting and adjusting trolley line support of traveling car
CN203491629U (en) Ring buckle cable fixing support
CN202012047U (en) Steel strand inclined pulling and buckling system of tower
CN202273179U (en) High-altitude steel cable suspended working platform for construction and maintenance on outer side of bridge box girder
CN102135001B (en) Device for paving tunnel waterproof boards

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
C41 Transfer of patent application or patent right or utility model
CF01