CN201336532Y - Setting out system of ship machine - Google Patents

Setting out system of ship machine Download PDF

Info

Publication number
CN201336532Y
CN201336532Y CNU2008202393645U CN200820239364U CN201336532Y CN 201336532 Y CN201336532 Y CN 201336532Y CN U2008202393645 U CNU2008202393645 U CN U2008202393645U CN 200820239364 U CN200820239364 U CN 200820239364U CN 201336532 Y CN201336532 Y CN 201336532Y
Authority
CN
China
Prior art keywords
cable
rack
ship
setting out
hull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202393645U
Other languages
Chinese (zh)
Inventor
艾湖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGDONG SHIPYARD OF CHINA CHANGJIANG NATIONAL SHIPPING GROUP
Original Assignee
JIANGDONG SHIPYARD OF CHINA CHANGJIANG NATIONAL SHIPPING GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGDONG SHIPYARD OF CHINA CHANGJIANG NATIONAL SHIPPING GROUP filed Critical JIANGDONG SHIPYARD OF CHINA CHANGJIANG NATIONAL SHIPPING GROUP
Priority to CNU2008202393645U priority Critical patent/CN201336532Y/en
Application granted granted Critical
Publication of CN201336532Y publication Critical patent/CN201336532Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a setting out system of a ship machine, comprising a ship body. The utility model is characterized in that a ship deck is provided with a setting out rack which is entwined with a cable line; the inner cabin of the ship body is provided with a cable rack and a teagle which is capable of being towed to move; after the cable line is led out from the setting out rack, the cable line is arranged on the cable rack through pulleys arranged in the ship body and on the top part of the inner cabin of the ship body; and the most front end of the cable is entwined on the teagle. By adopting the utility model, the cable can be paved with high speed smoothly, thus increasing the production efficiency, saving lots of labor and creating great economic benefit for the enterprisers; and by adopting the pulley, the external surface of the cable is not damaged because the cable is towed on the deck, thus improving the paving quality of the cable greatly.

Description

Ship machinery unwrapping wire system
Technical field:
The utility model relates to the shipbuilding field, a kind of specifically ship machinery unwrapping wire system.
Background technology:
Cable laying is an important step in the shipbuilding work progress; when laying shipboard cable, use traditional method before this; be to put in order the handling of volume cable to go on board; use the way unwrapping wire that pulls pickaback by personnel; along with the specification of domestic shipyard shipbuilding in recent years is increasing; the specification of cable is also increasing; quality requirement is more and more higher; only depend on manpower to lay and be difficult to catch up with progress; cause the cycle stretch-out of cable laying; generally reach 4-5 month, the personnel of input reach 40-50 people, and labor strength is big; working time is long; also cause the breakage of cable exocuticle through regular meeting, cause quality not pass a test, this link of cable laying has become the bottleneck of shipbuilding concerning enterprise.
Summary of the invention:
For solving the problem that prior art exists, a kind of ship machinery unwrapping wire system is provided, utilize the pay off rack on the deck at the uniform velocity to spur cable, the hoist engine of walking is walked with rope traction, thereby makes cable can be positioned over laying on the cable testing bridge smoothly, at a high speed.
The technical solution adopted in the utility model:
Ship machinery unwrapping wire system, include hull, it is characterized in that on the described boat deck pay off rack being installed, coiling has cable on the pay off rack, be provided with cable testing bridge and can draw the hoist engine of walking in the storehouse in the hull, after described cable is drawn from pay off rack, be placed on the cable testing bridge through being installed on the pulley guiding that reaches hull Nei Cang top in the hull, cable is wound on the hoist engine foremost.
Advantage of the present utility model:
The utility model hoist engine is walked, and hoist engine rotates, and drives the cable unwrapping wire, and the cable energy is smooth, being positioned on the cable testing bridge of high speed laid thereby make; Greatly improved production efficiency, saved the labour again in a large number, for enterprise creates great economic benefit; And, the cable laying quality is improved greatly by using pulley, avoided cable to drag above deck the cable exocuticle breakage that causes.
Description of drawings:
Fig. 1 is a structural representation of the present utility model.
Embodiment:
Ship machinery unwrapping wire system, include hull 1, pay off rack 2 is installed on the boat deck, coiling has cable 3 on the pay off rack 2, be provided with cable testing bridge and can draw the hoist engine 4 of walking in the storehouse in the hull 1, after cable 3 is drawn from pay off rack 2, be placed on the cable testing bridge through being installed on pulley 5 guiding that reach hull Nei Cang top in the hull, cable 3 is wound on the hoist engine 4 foremost.

Claims (1)

1, ship machinery unwrapping wire system, include hull, it is characterized in that on the described boat deck pay off rack being installed, coiling has cable on the pay off rack, be provided with cable testing bridge and can draw the hoist engine of walking in the storehouse in the hull, after described cable is drawn from pay off rack, be placed on the cable testing bridge through being installed on the pulley guiding that reaches hull Nei Cang top in the hull, cable is wound on the hoist engine foremost.
CNU2008202393645U 2008-12-30 2008-12-30 Setting out system of ship machine Expired - Fee Related CN201336532Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202393645U CN201336532Y (en) 2008-12-30 2008-12-30 Setting out system of ship machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202393645U CN201336532Y (en) 2008-12-30 2008-12-30 Setting out system of ship machine

Publications (1)

Publication Number Publication Date
CN201336532Y true CN201336532Y (en) 2009-10-28

Family

ID=41288194

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202393645U Expired - Fee Related CN201336532Y (en) 2008-12-30 2008-12-30 Setting out system of ship machine

Country Status (1)

Country Link
CN (1) CN201336532Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105173881A (en) * 2015-07-24 2015-12-23 博锋智能科技(大连)有限公司 Automatic cable conveying system
CN107147045A (en) * 2017-06-05 2017-09-08 宿州诺亚坚舟光伏科技有限公司 A kind of cable of photovoltaic plant waterborne installs auxiliary part and installation method
CN110311327A (en) * 2019-06-28 2019-10-08 中船黄埔文冲船舶有限公司 Cable arranging system
CN111342407A (en) * 2020-04-16 2020-06-26 俞园芳 Safety cable bridge rack

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105173881A (en) * 2015-07-24 2015-12-23 博锋智能科技(大连)有限公司 Automatic cable conveying system
CN107147045A (en) * 2017-06-05 2017-09-08 宿州诺亚坚舟光伏科技有限公司 A kind of cable of photovoltaic plant waterborne installs auxiliary part and installation method
CN110311327A (en) * 2019-06-28 2019-10-08 中船黄埔文冲船舶有限公司 Cable arranging system
CN111342407A (en) * 2020-04-16 2020-06-26 俞园芳 Safety cable bridge rack

Similar Documents

Publication Publication Date Title
CN103183112B (en) Abutting and lifting device for recovering underwater robot
CN201336532Y (en) Setting out system of ship machine
CN102332695B (en) Lifting method of submarine cable terminal landing platform
CN205474866U (en) Through suspension cable installation circulation system
ATE548317T1 (en) METHOD FOR LIFTING COMPONENTS OF WIND TURBINE SYSTEMS
CN105672138A (en) Through type stayed cable installation circulation system and cable threading construction method thereof
CN106505482A (en) Big specification cable underground buried tube long range laying method
CN204096953U (en) The energy-efficient tower crane of equiarm
CN101258839B (en) Mechanization net changing method for large-scale aquiculture net cage
CN205132903U (en) Steel wire slings
CN201325830Y (en) Cabin hanging and winding-proofing mechanism of shore bridge hanger lifting steel wire ropes
CN106229894A (en) Crane span structure threading traction apparatus
CN102630654A (en) Efficient labor-saving pond fishing device
CN211508423U (en) Special tool for laying ship cables
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN108385524A (en) The method of revolution steel strand wires bivector traction in the same direction
CN204778374U (en) Single suo mucai grab bucket
CN205740097U (en) A kind of derrick crane wiring system
CN104787254A (en) Ship seaborne replenishment universal guide rope device and application method
CN103541253A (en) Winch used steel wire rope
CN105896397A (en) Stay wire metal net
CN204939996U (en) Novelly anti-ly hinder hemp hoop device
CN105775999A (en) Equipment for lifting
CN205328447U (en) Automatic unhook formula hook assembly
CN102628366B (en) Annular prestressed stranded wire reeving trolley and reeving method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091028

Termination date: 20121230