CN201334671Y - 一种组合围堰 - Google Patents

一种组合围堰 Download PDF

Info

Publication number
CN201334671Y
CN201334671Y CNU2008202410015U CN200820241001U CN201334671Y CN 201334671 Y CN201334671 Y CN 201334671Y CN U2008202410015 U CNU2008202410015 U CN U2008202410015U CN 200820241001 U CN200820241001 U CN 200820241001U CN 201334671 Y CN201334671 Y CN 201334671Y
Authority
CN
China
Prior art keywords
stake
pile
cofferdam
interlock
steel sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202410015U
Other languages
English (en)
Inventor
秦顺全
田继开
郑大超
刘润泽
涂满明
刘翠云
张爱花
江涌
姚森
张文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CNU2008202410015U priority Critical patent/CN201334671Y/zh
Application granted granted Critical
Publication of CN201334671Y publication Critical patent/CN201334671Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本实用新型公开了一种桥梁基础工程中大堤迎水侧的组合围堰,其特征是在大堤迎水侧布置钻孔咬合桩,钻孔咬合桩的上部设置钢筋混凝土胸墙,形成地下连续墙;其他三面布置钢板桩,钻孔咬合桩与钢板桩之间通过预埋件焊接连接,形成组合围堰;三面钢板桩顶部的内壁上分别焊接导环,并用若干横向和纵向内支撑架固定。本实用新型利用地下连续墙作为大堤的稳定支护结构,同时作为围堰的一部分,满足了大堤防护和桥梁水中基础施工的需要。

Description

一种组合围堰
技术领域
本实用新型涉及一种围堰,特别是涉及一种桥梁基础工程中大堤迎水侧的具备大堤防护功能的组合围堰。
背景技术
在国内一般大堤迎水侧的桥梁基础施工中,常常将大堤防护与桥梁基础围堰分开考虑,这样就浪费了成本;并且当桥梁基础侵入大堤护岸时,在施工空间上存在难度。
实用新型内容
本实用新型可解决大堤迎水侧的桥梁基础施工不经济、施工难度大等问题。
为了解决上述技术问题,本实用新型所采用的技术方案是提供一种组合围堰,包括地下连续墙和钢板桩,其特征是在大堤迎水侧布置钻孔咬合桩,在钻孔咬合桩的上部设置钢筋混凝土胸墙,形成地下连续墙。
上述方案中,以所述地下连续墙为矩形围堰的一条边,在另外三条边上设置钢板桩,共同构成复合围堰的侧板。
上述方案中,所述钻孔咬合桩的排列方式为一个a桩和一个b桩间隔布置,边缘为b桩,先施工a桩,后施工b桩,a桩混凝土采用超缓凝混凝土,要求必须在a桩混凝土初凝前完成b桩,其中a桩为素混凝土桩,b桩为钢筋混凝土桩。
在所述三面钢板桩顶部的内壁上分别焊接导环,并用若干横向和纵向内支撑架固定钢板桩和地下连续墙。
所述钻孔咬合桩中相邻桩之间的咬合厚度根据桩长来选取,桩越短咬合厚度越小,但最小不宜小于100mm,桩越长咬合厚度越大,按下式进行计算:
D-2(kL+Q)≥50mm
式中:
L-桩长,mm;
k-桩的垂直度,以百分数或千分数表示;
Q-孔口定位误差容许值,mm;
D-钻孔咬合桩的设计咬合厚度,mm。
上述方案中,在所述地下连续墙两端b桩内设置预埋钢板,并将预埋钢板与钢板桩焊接连接。
上述方案中,所述钢板桩为常用钢板桩、锁口钢管桩或自制钢板桩。
采用本实用新型提供的组合围堰,在靠近大堤一侧,用地下连续墙作为大堤稳定支护结构,同时作为围堰的一部分,满足了大堤防护和桥梁水中基础施工的需要。
附图说明
图1为本实用新型施工时立面布置图;
图2为本实用新型施工时平面布置图;
图3为本实用新型施工时钢板桩与地下连续墙连接示意图。
具体实施方式
下面结合附图对本实用新型作出详细的说明。
如图1、图2、图3所示,本实用新型提供一种组合围堰,包括:地下连续墙1和钢板桩2,其特征是在大堤迎水侧布置钻孔咬合桩5,在钻孔咬合桩5的上部设置钢筋混凝土胸墙6,形成地下连续墙1。
上述方案中,以所述地下连续墙1为矩形围堰的一条边,在另外三条边上设置钢板桩2,共同构成复合围堰的侧板。
上述方案中,所述钻孔咬合桩5的排列方式为一个a桩和一个b桩间隔布置,边缘为b桩,先施工a桩,后施工b桩,a桩混凝土采用超缓凝混凝土,要求必须在a桩混凝土初凝前完成b桩,其中a桩为素混凝土桩,b桩为钢筋混凝土桩。
在所述三面钢板桩顶部的内壁上分别焊接导环3,并用若干横向和纵向内支撑架4固定钢板桩和地下连续墙1。
所述钻孔咬合桩5中相邻桩之间的咬合厚度根据桩长来选取,桩越短咬合厚度越小,但最小不宜小于100mm,桩越长咬合厚度越大,按下式进行计算:
D-2(kL+Q)≥50mm
式中:
L-桩长,mm;
k-桩的垂直度,以百分数或千分数表示;
Q-孔口定位误差容许值,mm;
D-钻孔咬合桩的设计咬合厚度,mm。
为了保证钻孔咬合桩5底部有足够厚度的咬合量,除对其孔口定位误差严格控制外,还应对其垂直度进行严格的控制,根据我国《地下铁道工程施工及验收规范》规定,桩的垂直度标准为3‰。在成孔过程中如发现垂直度偏差过大,必须及时进行纠偏调整,达到设计深度时吊放钢筋笼,下导管,浇筑混凝土,同时逐步拔除混凝土导管和套筒,最后形成桩体。
本实用新型的施工步骤是:
A、在大堤10的迎水侧按设计位置施工完成钻孔咬合桩5,形成地下连续墙1的桩基部分,然后浇筑上部钢筋混凝土胸墙6;
B、以钻孔咬合桩5为基准插打其他三面钢板桩2到达设计深度,形成组合围堰,钢板桩2为常用钢板桩、锁口钢管桩或自制钢板桩;
C、在组合围堰的闭合区域内逐层开挖,在钻孔咬合桩5钢筋笼外侧焊接预埋钢板7,围堰内取土时,逐层将钢板桩2一端与预埋钢板7焊连,同时于三面钢板桩2顶部的内壁上分别焊接固定导环3,并用若干横向和纵向内支撑架4固定,导环3截面为型钢或箱形截面,内支撑4为钢管、桁架或型钢;
D、闭合区域开挖到设计深度后,浇筑封底混凝土8,施工基础,封底混凝土与围堰一起作为止水结构;
E、基础施工完成后,拆除钢板桩2、导环3和内支撑4,留下地下连续墙1作为大堤10的永久防护结构。
本实用新型不局限于上述最佳实施方式,任何人应该得知在本实用新型的启示下作出的结构变化,凡是与本实用新型具有相同或相近的技术方案,均落入本实用新型的保护范围之内。

Claims (7)

1、一种组合围堰,包括地下连续墙和钢板桩,其特征在于:
在大堤迎水侧布置钻孔咬合桩,在钻孔咬合桩的上部设置钢筋混凝土胸墙,形成地下连续墙。
2、如权利要求1所述的一种组合围堰,其特征在于以地下连续墙为矩形围堰的一条边,在另外三条边上设置钢板桩,共同构成复合围堰的侧板。
3、如权利要求1和2所述的一种组合围堰,其特征在于所述钻孔咬合桩的排列方式为一个a桩和一个b桩间隔布置,边缘为b桩,先施工a桩,后施工b桩,a桩混凝土采用超缓凝混凝土,要求必须在a桩混凝土初凝前完成b桩,其中a桩为素混凝土桩,b桩为钢筋混凝土桩。
4、如权利要求2所述的一种组合围堰,其特征在于在所述三面钢板桩顶部的内壁上分别焊接导环,并用若干横向和纵向内支撑架固定钢板桩和地下连续墙。
5、如权利要求3所述的一种组合围堰,其特征在于所述钻孔咬合桩中相邻桩之间的咬合厚度根据桩长来选取,桩越短咬合厚度越小,但最小不宜小于100mm,桩越长咬合厚度越大,按下式进行计算:
D-2(kL+Q)≥50mm
式中:
L-桩长,mm;
k-桩的垂直度,以百分数或千分数表示;
Q-孔口定位误差容许值,mm;
D-钻孔咬合桩的设计咬合厚度,mm。
6、如权利要求1至5项任一权利要求所述的一种组合围堰,其特征在于在所述地下连续墙两端b桩内设置预埋钢板,并将预埋钢板与钢板桩焊接连接。
7、如权利要求1至6项任一项权利要求所述的组合围堰施工方法,其特征在于所述钢板桩为常用钢板桩、锁口钢管桩或自制钢板桩。
CNU2008202410015U 2008-12-26 2008-12-26 一种组合围堰 Expired - Lifetime CN201334671Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202410015U CN201334671Y (zh) 2008-12-26 2008-12-26 一种组合围堰

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202410015U CN201334671Y (zh) 2008-12-26 2008-12-26 一种组合围堰

Publications (1)

Publication Number Publication Date
CN201334671Y true CN201334671Y (zh) 2009-10-28

Family

ID=41286321

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202410015U Expired - Lifetime CN201334671Y (zh) 2008-12-26 2008-12-26 一种组合围堰

Country Status (1)

Country Link
CN (1) CN201334671Y (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758143A (zh) * 2014-02-14 2014-04-30 湖南省建筑工程集团总公司 一种桥梁基础水下混凝土连续墙围堰的模板结构
CN104929142A (zh) * 2015-07-09 2015-09-23 中国水利水电第七工程局有限公司 一种组合围堰结构及其建造施工方法
CN106149739A (zh) * 2016-08-26 2016-11-23 蚌埠市清泉环保有限责任公司 组合式围堰
CN109056763A (zh) * 2018-09-17 2018-12-21 中交公局海威工程建设有限公司 组合式围堰结构及水中作业平台
CN109113086A (zh) * 2018-10-24 2019-01-01 湖北工业大学 一种深水基岩裸露河床区的钢混组合围堰施工方法
CN118581916A (zh) * 2024-08-06 2024-09-03 中交一航局第一工程有限公司 一种软弱土层干坞防洪系统及其施工工艺

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758143A (zh) * 2014-02-14 2014-04-30 湖南省建筑工程集团总公司 一种桥梁基础水下混凝土连续墙围堰的模板结构
CN103758143B (zh) * 2014-02-14 2015-06-24 湖南省建筑工程集团总公司 一种桥梁基础水下混凝土连续墙围堰的模板结构
CN104929142A (zh) * 2015-07-09 2015-09-23 中国水利水电第七工程局有限公司 一种组合围堰结构及其建造施工方法
CN106149739A (zh) * 2016-08-26 2016-11-23 蚌埠市清泉环保有限责任公司 组合式围堰
CN106149739B (zh) * 2016-08-26 2018-06-08 蚌埠市清泉环保有限责任公司 组合式围堰
CN109056763A (zh) * 2018-09-17 2018-12-21 中交公局海威工程建设有限公司 组合式围堰结构及水中作业平台
CN109113086A (zh) * 2018-10-24 2019-01-01 湖北工业大学 一种深水基岩裸露河床区的钢混组合围堰施工方法
CN118581916A (zh) * 2024-08-06 2024-09-03 中交一航局第一工程有限公司 一种软弱土层干坞防洪系统及其施工工艺

Similar Documents

Publication Publication Date Title
CN105735325B (zh) 一种集约化的永久支护装配式地下室结构体系及施工方法
CN201334671Y (zh) 一种组合围堰
CN103741714A (zh) 地下工程全盖挖逆作法施工方法
CN107012871B (zh) 一种悬挂式围护深大长基坑装配式结构的逆作施工方法
CN101435200B (zh) 组合围堰施工方法
JP6454674B2 (ja) 止水作業空間の構築方法
CN108385693B (zh) 一种用于分期地下室支护的等代锚杆支护方法和支护体系
CN107326932B (zh) 一种地下车库的准半逆作施工方法
CN213143117U (zh) 一种装配式键槽基础挡土墙结构
CN111809662A (zh) 地铁车站地下结构组合建造方法
CN111519653A (zh) 一种模块化装配式挡土墙及其施工方法
CN217517602U (zh) 近江堤基坑支护结构
CN216194790U (zh) 一种基坑支护结构
CN206928281U (zh) 先张法预应力混凝土多孔空心生态桩
CN102296592A (zh) 现浇x形钢筋混凝土桩地下连续墙的施工方法
CN214738089U (zh) 一种基坑结构
CN210887256U (zh) 挡水围堰平直组合板桩地连墙式框架
CN115262531A (zh) 一种地下连续墙兼做隔振屏障的成型及设计方法
CN211006701U (zh) 桩墙合一的基坑支护结构
CN212248255U (zh) 一种前墙后桩双排支护的板式连接结构
CN210421157U (zh) 一种地下结构底板-侧墙节点结构
CN212248256U (zh) 前墙后桩联合支护的梁式连接结构
CN210766887U (zh) 一种永临结合地下槽型结构
CN112411556A (zh) 一种基坑结构及其施工方法
CN201883449U (zh) 一种组合桩海墙结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150204

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150204

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road Business Street No. 6 building SBI

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20091028