CN201329416Y - Novel ladle-building brick cup - Google Patents

Novel ladle-building brick cup Download PDF

Info

Publication number
CN201329416Y
CN201329416Y CNU2008202318057U CN200820231805U CN201329416Y CN 201329416 Y CN201329416 Y CN 201329416Y CN U2008202318057 U CNU2008202318057 U CN U2008202318057U CN 200820231805 U CN200820231805 U CN 200820231805U CN 201329416 Y CN201329416 Y CN 201329416Y
Authority
CN
China
Prior art keywords
brick cup
brick
argon
jar
pocket block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202318057U
Other languages
Chinese (zh)
Inventor
李阳
赵勇
吴玉峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CNU2008202318057U priority Critical patent/CN201329416Y/en
Application granted granted Critical
Publication of CN201329416Y publication Critical patent/CN201329416Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a novel ladle-building brick cup, which consists of two argon-blowing permeable brick cups and a pocket block; wherein, the argon-blowing permeable brick cups and the pocket block are respectively masoned on ladle bottom bricks; the two argon-blowing permeable brick cups are parallel to each other and are staggered from each other; and the pocket block is parallel to the argon-blowing permeable brick cups. The structure design of the novel ladle-building brick cup is reasonable, the phenomenon of ladle bottom expansion is effectively avoided, the breakout accident rate is reduced, and thereby, the stable and smooth production is guaranteed.

Description

The novel liquid steel jar is built brick cup by laying bricks or stones
Technical field
The utility model has related to a kind of novel liquid steel jar and has built brick cup by laying bricks or stones, belongs to field of iron and steel smelting.
Background technology
The molten steel jar is the large-scale instrument of STEELMAKING PRODUCTION indispensability, guarantees molten steel jar service life and safety, to reducing refractory consumption rate, reduce worker's labour intensity, guaranteeing that STEELMAKING PRODUCTION safety, direct motion play important effect.
The capacity of molten steel jar is bigger, in order to guarantee steel-making and refining quality, at the ventilative brick cup of two Argons of molten steel pot bottom design and a pocket block.Present building method, two blocks of ventilative brick cups of Argon are arranged on same the straight line, between them apart from 400mm, and brick is of a size of 300 * 160 * 100mm at the bottom of the molten steel jar jar, the brick-building art of brick is divided into and crouch builds and two kinds of laids on end at the bottom of the molten steel jar jar, when carrying out laid on end, the distance of 400mm is laid on end four row's end bricks just in time.When the molten steel jar is built by laying bricks or stones when toasting (temperature reaches more than 1000 ℃) after finishing, brick at the bottom of four row's laids on end, clay is met thermal expansion in ventilative brick cup of two Argons and the brickwork joint, (the square brick material is a pink fused alumina owing to above-mentioned material coefficient of expansion difference, jar end brick material is a magnalium carbon, clay is a high alumina), expansive force upwards bulges the ventilative brick cup of two Argons and four row's end bricks (above-mentioned situation has all appearred in the molten steel jar of being built before not improving after baking) about 10-15mm along same direction, the slit appears at the bottom of making molten steel jar jar, simultaneously, during converter tapping, molten steel shock point (promptly meeting the steel face) position is just around two blocks of ventilative square bricks, therefore easily produce bleed-out hidden danger at the expansion joint (E.J.) position, cause major industrial accident.
Summary of the invention
The utility model has overcome deficiency of the prior art, and a kind of reasonable in design is provided, and the not expansive novel liquid steel jar that is heated is built brick cup by laying bricks or stones.
In order to address the above problem, the utility model by the following technical solutions:
A kind of novel liquid steel jar is built brick cup by laying bricks or stones, comprise the ventilative brick cup of two Argons and a pocket block, ventilative brick cup of Argon and pocket block are built by laying bricks or stones respectively on brick at the bottom of the molten steel jar jar, and two blocks of ventilative brick cups of Argon are parallel to each other and stagger mutually, and pocket block and the Argon brick cup of breathing freely is parallel to each other.Breathe freely brick cup, pocket block of described Argon becomes 45-60 ° of angle with molten metal ladle trunnion.
Compared with prior art, the beneficial effects of the utility model are: spend around the hour hands rotation 45 of wherein being in a good mood on the former basis that reaches pocket block of breathing freely, rotating the ventilative brick cup relative position of back two Argons staggers mutually, two blocks of ventilative brick cups of Argon and jar expansive force that end brick produces are decomposed along all directions after the pre-thermal expansion, and the direction of expansive force is not on same straight line, avoided because of different brick cups that cause of the material coefficient of expansion and jar situation that end brick upwards bulges, reduced the bleed-out accident rate, prolong the service life of molten steel jar, reduced the production cost of enterprise.
Description of drawings
Fig. 1 is the utility model structural representation
Fig. 2 is original masonry way schematic diagram at the bottom of the molten steel jar jar
The specific embodiment
A kind of novel liquid steel jar is built brick cup by laying bricks or stones, as shown in Figure 1, comprise the ventilative brick cup 1 of two Argons and a pocket block 2, ventilative brick cup 1 of Argon and pocket block 2 are built by laying bricks or stones respectively on brick at the bottom of the molten steel jar jar, the utility model structural design is rotated the 45-60 degree around the hour hands of wherein being in a good mood on the former basis that reaches pocket block 2 of breathing freely, rotating ventilative brick cup 1 relative position of back two Argons staggers mutually, brick at the bottom of not having between two blocks of ventilative brick cups 1 of Argons simultaneously jar, pocket block 2 is parallel to each other with the ventilative brick cup 1 of Argon, two blocks of ventilative brick cups 1 of Argon and jar expansive force that end brick produces are decomposed along all directions after the pre-thermal expansion, and the direction of expansive force is not on same straight line, can not cause because of different brick cups that cause of the material coefficient of expansion and jar situation that end brick upwards bulges, prolong the service life of molten steel jar, guaranteed the safety and stability direct motion of producing.

Claims (2)

1, a kind of novel liquid steel jar is built brick cup by laying bricks or stones, comprise a ventilative brick cup (1) of two Argons and a pocket block (2), breathe freely brick cup (1) and pocket block (2) of Argon built by laying bricks or stones respectively on brick at the bottom of the molten steel jar jar, it is characterized in that, the ventilative brick cup (1) of two Argons is parallel to each other and staggers mutually, and pocket block (2) is parallel to each other with the ventilative brick cup (1) of Argon.
2, novel liquid steel jar according to claim 1 is built brick cup by laying bricks or stones, it is characterized in that, breathe freely brick cup, pocket block of described Argon becomes 45-60 ° of angle with molten metal ladle trunnion.
CNU2008202318057U 2008-12-18 2008-12-18 Novel ladle-building brick cup Expired - Fee Related CN201329416Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202318057U CN201329416Y (en) 2008-12-18 2008-12-18 Novel ladle-building brick cup

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202318057U CN201329416Y (en) 2008-12-18 2008-12-18 Novel ladle-building brick cup

Publications (1)

Publication Number Publication Date
CN201329416Y true CN201329416Y (en) 2009-10-21

Family

ID=41222791

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202318057U Expired - Fee Related CN201329416Y (en) 2008-12-18 2008-12-18 Novel ladle-building brick cup

Country Status (1)

Country Link
CN (1) CN201329416Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102886514A (en) * 2012-10-26 2013-01-23 武汉钢铁(集团)公司 Ladle bottom casting method and lashed area reinforced castable construction mould thereof
CN110523966A (en) * 2019-09-25 2019-12-03 张家港广大特材股份有限公司 A kind of double porous cores of ladle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102886514A (en) * 2012-10-26 2013-01-23 武汉钢铁(集团)公司 Ladle bottom casting method and lashed area reinforced castable construction mould thereof
CN102886514B (en) * 2012-10-26 2014-08-13 武汉钢铁(集团)公司 Ladle bottom casting method and lashed area reinforced castable construction mould thereof
CN110523966A (en) * 2019-09-25 2019-12-03 张家港广大特材股份有限公司 A kind of double porous cores of ladle

Similar Documents

Publication Publication Date Title
CN101234905B (en) Corundum spinel refractory materials for RH lining and manufacturing method thereof
CN104858409A (en) Steel ladle for steelmaking
CN102839251B (en) Smelting method of low-phosphorous steel
CN105481375A (en) Energy-saving and fire-resistant material
CN201329416Y (en) Novel ladle-building brick cup
CN102978345B (en) Low-chrome refractory material RH refining furnace and building method thereof
CN103785820B (en) A kind of ladle permanent liner and preparation method thereof
CN101666147B (en) Construction method of mixed build furnace wall
CN102786314A (en) Fused-rebonded magnesite-chrome brick with excellent thermal shock resistance and production process
CN103157785B (en) Construction method of ladle lining
CN103332964A (en) Viscous slag prevention coating for refractory material in casting blank heating furnace
CN204584250U (en) A kind of ladle for making steel
CN101684654B (en) Building method of working lining brick at bottom of ladle
CN104084574B (en) A kind of environment-friendly type liner in dundish and forming method thereof
CN203401073U (en) Steel ladle bottom-covering work layer masonry construction
CN201537694U (en) Hot metal ladle
CN203307367U (en) Masonry structure of 120-ton converter lining
CN203944831U (en) Novel anti-leakage ladle lining
CN102213545A (en) Combined arc furnace cover
CN202182615U (en) Combined furnace cover of electric arc furnace
CN110698212A (en) Ladle opening brick
CN111719037A (en) Method for increasing number of continuous casting furnaces of double-flow plate blank tundish
CN205989052U (en) A kind of compound liner body tundish
CN203343427U (en) Alumina-silicon-carbide carbon brick for ladle
CN204779649U (en) Converter ball -type fillet elbow furnace lining structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091021

Termination date: 20131218