CN201309817Y - Hydraulic lifting mounting carrier vehicle - Google Patents

Hydraulic lifting mounting carrier vehicle Download PDF

Info

Publication number
CN201309817Y
CN201309817Y CN 200820228188 CN200820228188U CN201309817Y CN 201309817 Y CN201309817 Y CN 201309817Y CN 200820228188 CN200820228188 CN 200820228188 CN 200820228188 U CN200820228188 U CN 200820228188U CN 201309817 Y CN201309817 Y CN 201309817Y
Authority
CN
China
Prior art keywords
hydraulic lifting
flat truck
installation
flat car
lifting mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200820228188
Other languages
Chinese (zh)
Inventor
金晋
马双喜
张志成
梁天山
张中权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Coking Coal Group Co Ltd
Original Assignee
Shanxi Coking Coal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Coking Coal Group Co Ltd filed Critical Shanxi Coking Coal Group Co Ltd
Priority to CN 200820228188 priority Critical patent/CN201309817Y/en
Application granted granted Critical
Publication of CN201309817Y publication Critical patent/CN201309817Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model relates to the field of mining equipment, in particular to a hydraulic lifting mounting carrier vehicle for solving the problems that the installation of underground big alleys and fully-mechanized mining working face pipelines and cables of an existing coal mine is manually finished, the installation and disassembly are tedious, and underground normal production is influenced. The hydraulic lifting mounting carrier vehicle comprises a flat car and a walking wheel under the flat car, wherein hollow supporting legs are fixed around the flat car, mobile guide bars are arranged in the supporting legs in a penetrating way, a hydraulic lifting rod is mounted on the front portion and the rear portion of the flat car, and pipe erecting bars are erected and fixed on the two hydraulic lifting rods and the upper portions of the mobile guide bars on two sides, a clamp pipe baffle plate is arranged on the pipe erecting bars, and a mass is placed on the flat car. The hydraulic lifting mounting carrier vehicle has simple structure, reasonable design and convenient and fast operation, which is convenient for the disassembly and transportation of pipelines and cables after the fully-mechanized mining working face finishes mining, reduces the loss of labor and materials, and simultaneously accelerates the installation schedule of the fully-mechanized mining working face and shortens the top-mounting time of big-alley pipelines, and is suitable for high-lift operation, such as top-mounting installation of big-alley pipelines and cable installation on the top portion of alleys and the like.

Description

The hydraulic lifting mounting transport vehicle
Technical field
The utility model relates to the mining equipment field, is specially a kind of hydraulic lifting mounting transport vehicle, both can be used as the novel device train that use on the top on big lane pipeline and the cable, also can be used as the transportation means of transported material.
Background technology
At present, big lane and fully-mechanized mining working rail are to lead chain by artificial use to finish along top laying major part on pipeline, the cable under the coal mine, the installer when mounted, installation difficulty is extremely big, erection schedule is very slow, influenced the ordinary production of big lane and fully-mechanized mining working, and run into the workman and tend to because of carelessness be injured by a crashing object by pipeline, cable, potential safety hazard is bigger.After fully-mechanized mining working has been adopted, also to dismantle, the transportation of pipeline and cable quite bothers.In order to reduce the loss of human and material resources, accelerate the erection schedule of fully-mechanized mining working simultaneously and shorten the time of pushing up on the pipeline of big lane, press for a kind of novel, auxiliary mounting transport vehicle that practicality is powerful of design and fabrication.
Summary of the invention
The utility model is installed to adopt and is manually finished in order to solve under the existing coal mine pipeline, the cable in big lane and fully-mechanized mining working, exist install, dismounting is loaded down with trivial details, wastes time and energy, and influences the problem of down-hole ordinary production, and a kind of hydraulic lifting mounting transport vehicle is provided.
The utility model is to adopt following technical scheme to realize: the hydraulic lifting mounting transport vehicle, the road wheel that comprises flat truck and below thereof, be fixed with hollow supporting leg around the flat truck, run through in the supporting leg activity-oriented bar is set, the flat truck front and back are separately installed with the hydraulic lifting arm that carries release of pressure mechanism and control lever, two hydraulic lifting arms and intrinsic the pipe bar of activity-oriented bar top difference frame that is positioned at its both sides, be provided with on the frame pipe bar and can be placed with mass on the flat truck along its card pipe baffle plate that moves.Above-mentioned hydraulic lifting arm can be jack commonly used on the market, low cost, and maintenance capacity is little, and cost is low, and installation rate is fast; Described pipe bar can be the I-beam section that has connecting bore on it, can come the length of adjusting bracket pipe bar according to the load size, can realize by connecting bore; The weight of described mass is to be determined by the weight of load, and enough counterweight spaces are arranged at flat truck top.
In order further to optimize structure of the present utility model, improve its function, carried out following structure design again, described pipe bar underside is hung with standby lifting member, when the setting height(from bottom) of existing hydraulic lifting arm fails to satisfy requirements, standby lifting member lower end can be withstood in the hydraulic lifting arm upper end, improve the height of frame pipe bar greatly; Be provided with reinforced rib between described supporting leg below and the flat truck, stirrup arranged, guarantee the stability of whole transport trolley along cross fixation between the adjacent legs of flat truck horizontal direction.
Adopt structure design of the present utility model,, have the following advantages through application in practice:
1, can realize the adjustable height of frame pipe bar by hydraulic lifting arm and standby lifting member, and laborsaving, safety;
2, the operator can be directly on platform, install, operation, need not other instruments;
3, the road wheel by the bottom makes whole machine body to orbit, and it is little to occupy the space, and operates steadily, and has made things convenient for fully-mechanized mining working to adopt the dismounting and the transportation of back pipeline and cable, closely links to each other with the raising of colliery installation effectiveness;
4, jacking system can be adjusted according to the size of load, and it is convenient, fast to operate;
In a word, the utility model is simple in structure, reasonable in design, easy to operate, quick, is applicable on the pipeline of big lane that the top installs, and the top, tunnel installs aloft work such as cable, has certain popularization value.
Description of drawings
Fig. 1 is a front elevation of the present utility model
Fig. 2 is the lateral plan of Fig. 1
Among the figure: the standby lifting member 10-reinforced rib of 1-flat truck 2-road wheel 3-supporting leg 4-control lever 5-hydraulic lifting arm 6-frame pipe bar 7-card pipe baffle plate 8-mass 9-11-stirrup
The specific embodiment
The hydraulic lifting mounting transport vehicle, as Fig. 1, shown in 2, the road wheel 2 that comprises flat truck 1 and below thereof, be fixed with hollow supporting leg 3 around the flat truck 1, be provided with reinforced rib 10 between supporting leg 3 belows and the flat truck 1, along cross fixation between the adjacent legs 3 of flat truck 1 horizontal direction stirrup 11 is arranged, run through in the supporting leg 3 the activity-oriented bar is set, supporting leg can be formed by two channel-section steel welding steels, supporting mining i beam in the middle rectangular opening that forms, only need smear butter can be up and down, flat truck 1 front and back are separately installed with 5, two hydraulic lifting arms 5 of hydraulic lifting arm that carry release of pressure mechanism and control lever 4 and intrinsic pipe bar 6 of the activity-oriented bar that is positioned at its both sides top difference frame, and frame pipe bar 6 underside are hung with standby lifting member 9, be provided with on the frame pipe bar 6 and can be placed with mass 8 on the flat truck 1 along its card pipe baffle plate 7 that moves.
During use, at first on flat truck, place and the corresponding mass of load weight to be installed, the workman reduces the hydraulic lifting arm height by control lever and release of pressure mechanism then, again pipeline to be installed or cable are erected on the two ends frame pipe bar of transport plane, will block the pipe baffle wedge simultaneously in the load both sides; By control lever hydraulic lifting arm is risen then, to desired height, the activity-oriented bar that is positioned at four supporting legs in this process also slowly rises hydraulic lifting arm thereupon, plays directional tagging with frame pipe bar and load jack-up.When the height of hydraulic lifting arm jack-up fails to satisfy requirements, standby lifting member lower end can be withstood in the hydraulic lifting arm upper end, improved the height of frame pipe bar greatly.
In addition, in order to reduce labour power greatly, save lane space, guarantee the Fast Installation of pipeline, cable, this transport trolley can be by the road wheel and the track matching running of bottom.

Claims (4)

1, a kind of hydraulic lifting mounting transport vehicle, the road wheel (2) that comprises flat truck (1) and below thereof, it is characterized in that flat truck (1) is fixed with hollow supporting leg (3) all around, run through in the supporting leg (3) the activity-oriented bar is set, flat truck (1) front and back are separately installed with the hydraulic lifting arm (5) that carries release of pressure mechanism and control lever (4), two hydraulic lifting arms (5) and activity-oriented bar top difference intrinsic the pipe bar of frame (6) that is positioned at its both sides, frame pipe bar (6) is gone up setting can be placed with mass (8) along its card pipe baffle plate (7) that moves on the flat truck (1).
2, hydraulic lifting mounting transport vehicle according to claim 1 is characterized in that frame pipe bar (6) underside is hung with standby lifting member (9).
3, hydraulic lifting mounting transport vehicle according to claim 1 and 2 is characterized in that being provided with reinforced rib (10) between supporting leg (3) below and the flat truck (1).
4, hydraulic lifting mounting transport vehicle according to claim 1 and 2 is characterized in that along cross fixation between the adjacent legs (3) of flat truck (1) horizontal direction stirrup (11) being arranged.
CN 200820228188 2008-12-13 2008-12-13 Hydraulic lifting mounting carrier vehicle Expired - Fee Related CN201309817Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200820228188 CN201309817Y (en) 2008-12-13 2008-12-13 Hydraulic lifting mounting carrier vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200820228188 CN201309817Y (en) 2008-12-13 2008-12-13 Hydraulic lifting mounting carrier vehicle

Publications (1)

Publication Number Publication Date
CN201309817Y true CN201309817Y (en) 2009-09-16

Family

ID=41107068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200820228188 Expired - Fee Related CN201309817Y (en) 2008-12-13 2008-12-13 Hydraulic lifting mounting carrier vehicle

Country Status (1)

Country Link
CN (1) CN201309817Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174440A (en) * 2013-03-28 2013-06-26 上海隧道工程股份有限公司 Pipe piece lifting device capable of extending axially
CN108054677A (en) * 2017-12-14 2018-05-18 李习勇 A kind of novel power grid connecton layout
CN111704076A (en) * 2020-06-29 2020-09-25 张志成 Quick uninstallation device based on intelligent control

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174440A (en) * 2013-03-28 2013-06-26 上海隧道工程股份有限公司 Pipe piece lifting device capable of extending axially
CN103174440B (en) * 2013-03-28 2015-04-01 上海隧道工程股份有限公司 Pipe piece lifting device capable of extending axially
CN108054677A (en) * 2017-12-14 2018-05-18 李习勇 A kind of novel power grid connecton layout
CN108054677B (en) * 2017-12-14 2020-06-05 瑞安市新瑞建筑设备租赁有限公司 Power grid wiring device
CN111704076A (en) * 2020-06-29 2020-09-25 张志成 Quick uninstallation device based on intelligent control

Similar Documents

Publication Publication Date Title
CN107336346B (en) Beam making pedestal
CN107630709B (en) A kind of construction method of the mobile trolley of bored tunnel construction
CN109056538A (en) A kind of modular support system being adapted to SPMT vehicle group
CN202544854U (en) Lining trolley for subway station
CN103867223A (en) Hydraulic supporting device of suspended top beams for roadways in shed
CN203393639U (en) Diamond self-anchored hanging basket for road and bridge construction
CN201309817Y (en) Hydraulic lifting mounting carrier vehicle
CN209144659U (en) A kind of modular support system being adapted to SPMT vehicle group
CN107642089B (en) Narrow space concrete pouring method
CN201635097U (en) Mobile ballasting platform counterforce device
CN103272963B (en) Preformed pile reinforcement cage pile tip bending device
CN104746432B (en) The feasible bridge guidance tape in plate-beam transports installs car
CN110778358B (en) Modularized main roof equipment for coal mine collapse roadway rescue and assembly method thereof
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN101498224B (en) Fully-mechanized mining working surface hydraulic support transport vehicle
CN103130103A (en) Lifting device suitable for underground ally and chamber
CN206439053U (en) Mould trolley is hanged in the lining cutting of tunnel inverted arch
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN201330365Y (en) Bench formwork trolley for construction of two-course pavement structure in tunnel
CN201306186Y (en) Fully-mechanized mining working surface hydraulic support transportation vehicle
CN210262748U (en) Cantilever supporting structure for steel box girder pushing construction
CN210766423U (en) Diagonal web member bracket trolley with adjustable inclination angle
CN109928160B (en) Large-tonnage pipe gallery and transportation frame integrated machine and use method
CN110565458B (en) Laying trolley and method for laying U-shaped beam track
CN211711873U (en) Rail mounted is used for hoist and mount traction system of transportation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090916

Termination date: 20121213