CN201301715Y - 成型管片剪力销 - Google Patents

成型管片剪力销 Download PDF

Info

Publication number
CN201301715Y
CN201301715Y CNU2009201462229U CN200920146222U CN201301715Y CN 201301715 Y CN201301715 Y CN 201301715Y CN U2009201462229 U CNU2009201462229 U CN U2009201462229U CN 200920146222 U CN200920146222 U CN 200920146222U CN 201301715 Y CN201301715 Y CN 201301715Y
Authority
CN
China
Prior art keywords
block
shear pin
jurisdiction
section
cotter way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009201462229U
Other languages
English (en)
Inventor
陈建军
吴庆红
曹振锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CNU2009201462229U priority Critical patent/CN201301715Y/zh
Application granted granted Critical
Publication of CN201301715Y publication Critical patent/CN201301715Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型涉及一种成型管片剪力销,包括销槽和切槽,所述销槽通缝布置于邻接块(B块)外弧面的正上方;所述切槽通缝布置于封闭块(K块)上,且切槽与钢板限位销粘接在一起。本实用新型的有益效果为:在K块和B块之间接头转角过大时,导致K块和B块产生较大错台的情况下使用该实用新型,不仅可以达到保证结构安全的要求,而且成本较低,且设计方案简单,便于操作。另一方面,剪力销加工速度快,节约工期,保证了现场施工进度及盾构施工中管片的充分供应,可推广运用于盾构施工管片环块间易产生错动的工程中。

Description

成型管片剪力销
技术领域
本实用新型涉及一种成型管片剪力销。
背景技术
盾构施工中,管片结构设计的合理性是保证管片结构整体性协调受力的根本。目前大断面盾构隧道的不断出现,增加了管片结构设计的复杂程度。南水北调穿黄工程盾构隧洞外径8.7m,隧洞外衬管片分7块,几乎平均分配,楔形块几乎同标准块具有相同的尺寸,此时各块的尺寸和自重均较大,前期由于结构设计中对接头处理的缺陷,导致管片拼装完成脱出盾尾后K块出现向隧道内的较大错台。由于盾构在高水压复杂地层中穿过,较大错台导致管片碎裂严重及接头渗漏水的出现,同时导致下一环管片无法拼装。加之已生产该类型管片已达到1500环,如果废弃,将造成4000多万人民币损失。
管片的优化改造方案有用单向定位棒,利用管片混凝土铣槽机械铣槽,该机械施工效率较高,一小时左右就可铣一条通槽,但该机械存在一些问题:(1)往管片上装卸时对管片角部出现挤碎现象,易造成管片角部破碎;(2)刀头在行进过程中进深不稳定等现象。因此,该方案尚不完善,需做进一步优化设计。采用混凝土取芯钻机对拼装好的管片进行钻孔,目前井下拼装的第5~10环管片就是利用该方法改造的管片。第5~10环管片只是在管片的凸榫面开槽加设定位棒。对限制管片的错台起到了一定的作用,但经验算一端加设限位棒还不能完全抵挡块向下的剪力,需要对管片两端加设限位棒。采用单、双向定位棒方案存在以下缺点:(1)定位棒槽孔定位精度低;(2)成槽孔进度慢;(3)费用高;(4)错台有所减小但无明显改善。采用把K块端面纵缝软木衬垫从1.5mm加厚到2.5mm的方案,但效果不佳。
实用新型内容
本实用新型的目的是提供一种成型管片剪力销,为了克服K块错台带来的
一系列问题及避免大量的经济损失,对楔形块及邻接块接头进行了优化改造,保证了已生产的所有管片正常投入使用,并保证了施工的顺利进行。
本实用新型的目的是通过以下技术方案来实现:
一种成型管片剪力销,包括销槽和切槽,所述销槽通缝布置于邻接块(B块)外弧面的正上方;所述切槽通缝布置于封闭块(K块)上,且所述切槽与钢板限位销粘接在一起。
本实用新型的有益效果为:在K块和B块之间接头转角过大时,导致K块和B块产生较大错台的情况下使用该实用新型,不仅可以达到保证结构安全的要求,而且成本较低,且设计方案简单,便于操作。另一方面,剪力销加工速度快,节约工期,保证了现场施工进度及盾构施工中管片的充分供应,可推广运用于盾构施工管片环块间易产生错动的工程中。
附图说明
下面根据附图对本实用新型作进一步详细说明。
图1是本实用新型实施例所述的成型管片剪力销的结构示意图;
图2是本实用新型实施例所述的成型管片剪力销的限位销的俯视图;
图3是本实用新型实施例所述的成型管片剪力销的限位销的侧视图;
图4是本实用新型实施例所述的成型管片剪力销的限位销的正视图。
图中:
1、销槽;2、切槽;3、邻接块(B块);4、封闭块(K块);5、限位销。
具体实施方式
如图1-4所示,本实用新型实施例所述的一种成型管片剪力销,包括销槽1和切槽2,所述销槽1通缝布置于邻接块(B块)3外弧面的正上方2mm处,销槽1的宽、深分别为16mm、22mm;所述切槽2通缝布置于封闭块(K块)4上,切槽2通过粘钢建筑胶与钢板限位销5粘接,所述切槽2的宽、深分别为10mm、21mm,限位销5的长、宽、深分别为1500mm、50mm、12mm。在封闭块(K块)4和邻接块(B块)3之间接头转角过大时,导致K块4和B块3产生较大错台的情况下使用该实用新型,不仅可以达到保证结构安全的要求,而且成本较低。
在具体使用时,采用钢板限位销5限制K块4和B块3的相对位移,其实现是把钢板限位销5插入K块4及B块3两端头管片上开设的一定尺寸的槽口内,并用粘钢建筑胶把钢板限位销5固定在管片槽口内,从而起到限制管片间相对位移的作用。
在南水北调中线一期穿黄工程中,对老管片使用了该实用新型,保证了已生产745环老管片的有效利用,直接挽回经济损失达4千万人民币;同时剪力销加工速度快,节约工期,保证了现场施工进度及盾构施工中管片的充分供应。此实用新型可推广运用于盾构施工管片环块间易产生错动的工程中。

Claims (2)

1、一种成型管片剪力销,包括销槽和切槽,其特征在于:所述销槽通缝布置于邻接块外弧面的正上方;所述切槽通缝布置于封闭块上,且所述切槽通过与钢板限位销粘接在一起。
2、根据权利要求1所述的成型管片剪力销,其特征在于:所述销槽的宽、深分别为16mm、22mm;所述切槽的宽、深分别为10mm、21mm。
CNU2009201462229U 2008-11-20 2009-03-25 成型管片剪力销 Expired - Fee Related CN201301715Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009201462229U CN201301715Y (zh) 2008-11-20 2009-03-25 成型管片剪力销

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200820123862 2008-11-20
CN200820123862.3 2008-11-20
CNU2009201462229U CN201301715Y (zh) 2008-11-20 2009-03-25 成型管片剪力销

Publications (1)

Publication Number Publication Date
CN201301715Y true CN201301715Y (zh) 2009-09-02

Family

ID=41085339

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009201462229U Expired - Fee Related CN201301715Y (zh) 2008-11-20 2009-03-25 成型管片剪力销

Country Status (1)

Country Link
CN (1) CN201301715Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362517A (zh) * 2013-07-31 2013-10-23 上海市政工程设计研究总院(集团)有限公司 一种装配式顶管
CN103797216A (zh) * 2011-09-15 2014-05-14 韩国建设技术研究院 具有纵向绞线和横向剪力键的管片结构以及使用所述结构来建造盾构隧道的方法
CN107503764A (zh) * 2017-08-18 2017-12-22 中铁隧道集团海外工程有限公司 采用剪力销支护盾构隧道管片开口的支护结构及施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103797216A (zh) * 2011-09-15 2014-05-14 韩国建设技术研究院 具有纵向绞线和横向剪力键的管片结构以及使用所述结构来建造盾构隧道的方法
CN103797216B (zh) * 2011-09-15 2016-06-29 韩国建设技术研究院 具有纵向绞线和横向剪力键的管片结构以及使用所述结构来建造盾构隧道的方法
CN103362517A (zh) * 2013-07-31 2013-10-23 上海市政工程设计研究总院(集团)有限公司 一种装配式顶管
CN107503764A (zh) * 2017-08-18 2017-12-22 中铁隧道集团海外工程有限公司 采用剪力销支护盾构隧道管片开口的支护结构及施工方法

Similar Documents

Publication Publication Date Title
CN203248178U (zh) 一种下向孔自钻式注浆锚杆
CN103046559A (zh) 内置钢筋骨架连锁防护混凝土砌块
CN201301715Y (zh) 成型管片剪力销
CN203129956U (zh) 旋挖钻机方形钻头
CN107227681A (zh) 节段装配式工字型组合梁
CN103628898B (zh) 一种用于防止巷道底鼓的连续墙支护方法
CN204040062U (zh) 预制楔形柔性接口装配式管廊
CN103225289A (zh) 液压活动坝坝面系统
CN204899921U (zh) 掘进机截割头和掘进机
CN103883336B (zh) 一种先主动后让压支护的可调节沿空留巷墙体及其施工方法
CN103939024B (zh) 一种硬砂质土钻头
CN204024663U (zh) 盾构双液浆注浆接头
CN202689951U (zh) 可拆式地质钻头
CN202467855U (zh) 一种泥水循环转向装置
CN215213510U (zh) 一种用于隧道撑子面爆破开挖的切槽器
CN206000464U (zh) 一种打桩机钻头
CN201705220U (zh) 内螺纹接头外壁有耐磨合金层的钻杆
CN210637041U (zh) 一种岩土工程打桩成孔钻头
CN204715349U (zh) 榫接式抗拔连接器
CN201650299U (zh) 盾构机用中心刀
CN202401998U (zh) 一种高效钻铰式铣锥
CN203362040U (zh) 一种减轻糊钻方便成桩的新型鱼尾钻头
CN203346857U (zh) 一种衬砌梯形渠道预制构件
CN205364197U (zh) 一种无端板预制桩生产用连接装置
CN204591299U (zh) 一种盾构法隧道管片拼装结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: THE 4TH ENGINEERING CO., LTD. OF CHINA RAILWAY 16T

Effective date: 20130516

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100193 CHAOYANG, BEIJING TO: 100018 CHAOYANG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130516

Address after: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park

Patentee after: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

Patentee after: China Railway 16th Bureau Group Fourth Engineering Co., Ltd.

Address before: 100193 Beijing city Chaoyang District No. 2 North Pine dam Park

Patentee before: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090902

Termination date: 20170325

CF01 Termination of patent right due to non-payment of annual fee