CN201289445Y - 烧结矿热风冷却试验装置 - Google Patents

烧结矿热风冷却试验装置 Download PDF

Info

Publication number
CN201289445Y
CN201289445Y CNU2008201235428U CN200820123542U CN201289445Y CN 201289445 Y CN201289445 Y CN 201289445Y CN U2008201235428 U CNU2008201235428 U CN U2008201235428U CN 200820123542 U CN200820123542 U CN 200820123542U CN 201289445 Y CN201289445 Y CN 201289445Y
Authority
CN
China
Prior art keywords
cooling
sintering
sintering deposit
air heater
cooling cup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201235428U
Other languages
English (en)
Inventor
李维广
贯增
季斌
赵志星
潘文
刘文光
赵勇
徐萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Group Co Ltd
Original Assignee
Shougang Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Corp filed Critical Shougang Corp
Priority to CNU2008201235428U priority Critical patent/CN201289445Y/zh
Application granted granted Critical
Publication of CN201289445Y publication Critical patent/CN201289445Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

一种烧结矿热风冷却试验装置,属于烧结矿技术领域。它由空气加热器、烧结矿冷却杯和烧结矿冷却杯底座组成。压缩空气经空气加热器加热后通过热风管道鼓入烧结矿冷却杯中,烧结矿在达到烧结终点后倒入烧结矿冷却杯中,利用鼓入的热风将其冷却。通过煤气阀门可调节煤气流量大小,控制热风温度,使烧结矿在不同的冷却制度下冷却。本实用新型的优点在于,弥补了现有烧结杯试验无法调整烧结矿冷却方式、冷却制度的不足,丰富了烧结实验室试验的研究内容,完善了实验室研究手段。

Description

烧结矿热风冷却试验装置
技术领域
本实用新型属于烧结矿技术领域,特别是提供了一种烧结矿热风冷却试验装置。利用经过加热的热风将热烧结矿冷却,可以调节热风温度改变烧结矿的冷却制度,模拟不同冷却制度对烧结矿质量影响的一种试验装置。
背景技术
对于烧结过程的试验研究主要是通过实验室的烧结杯试验完成。通过烧结杯试验可以了解不同的配料方案、点火制度、混料制度等对烧结经济技术指标以及烧结矿质量的影响。随着烧结工艺的发展,烧结矿的环冷技术逐步被推广,与传统的烧结矿机上抽风冷却并存成为目前工业生产中两种主要的烧结矿冷却方式。而目前的实验室烧结杯试验烧结矿的冷却方式只有传统的机上抽风冷却,无法调整烧结矿的冷却制度。
发明内容
本实用新型的目的在于提供一种烧结矿热风冷却试验装置,在烧结杯试验装置的基础上增加了热风冷却装置。该装置可以改变烧结矿的冷却方式,调整烧结矿的冷却制度。研究了不同冷却方式、冷却制度对烧结过程以及烧结矿质量的影响。
本实用新型包括由空气加热器、烧结矿冷却杯底座和坐落于烧结矿冷却杯底座上的烧结矿冷却杯组成,空气加热器和烧结矿冷却杯底座通过热风管道连接;烧结矿冷却杯与冷却杯底座通过底座凹槽连接。
空气加热器包括空气加热器主体,煤气总阀门,煤气阀门,压缩风入口,热风出口,煤气总管,煤气支管,空气加热器凹槽。煤气支管伸入空气加热器凹槽内,通过各煤气阀门与煤气总管连接,热风出口位于空气加热器主体尾部。
烧结矿冷却杯底座包括冷却杯底座凹槽,底座支架,热风管道。冷却杯底座凹槽连接于底座支架上方,热风管道连接于烧结杯底座凹槽下方;烧结矿冷却杯包括冷却杯体和位于其底部的冷却杯炉篦。
空气经空气加热器1加热后冷却烧结矿冷却杯12中的热烧结矿。
空气加热器主体采用增大空气受热行程的设计,即在空气加热器主体内部等距离分布若干凹槽,将空气加热器分割为若干相连通的加热室以增加空气受热行程,伸入空气加热器凹槽内的煤气支管上下错落分布。
用煤气将空气加热器中的空气加热到设定的温度,并将其鼓入冷却杯中,再将达到烧结终点的热烧结矿倒入冷却杯体,利用鼓入的热空气将烧结矿冷却。当杯体上方的热电欧测得废气的温度达到给定的温度时即结束冷却,倒出烧结矿进行后续处理。
本实用新型的有益效果是,弥补了现有烧结杯试验无法调整烧结矿冷却方式、冷却制度的不足,丰富了烧结实验室试验的研究内容,完善了实验室研究手段。
附图说明
图1本实用新型空气加热器的主视图。其中,空气加热器主体1,煤气总阀门2,空气加热器凹槽3,煤气阀门4。
图2本实用新型空气加热器的右视图。其中,压缩风入口5,煤气总管6,煤气支管7,热风出口8。
图3本实用新型空气加热器的俯视图。
图4是烧结矿冷却杯体底座的正视图。其中,冷却杯底座凹槽9、底座支架10、热风管道11。
图5是烧结矿冷却杯体底座的俯视图。
图6是烧结矿冷却杯体的正视图。其中,冷却杯12。
图7是烧结矿冷却杯体的俯视图。其中,冷却杯炉篦13。
具体实施方式
图1~图7为本实用新型的一种具体实施方式。
在图1~3中,打开煤气总阀门2,煤气从煤气总管6进入,在空气加热器1内燃烧,加热由压缩风入口5进入空气加热器1的空气。空气加热器1采用增大空气受热行程的设计,延长空气从压缩风入口5到热风出口8的受热时间。煤气支管7上下错落分布,伸入空气加热器凹槽3内均匀加热。煤气流量通过煤气阀门4调节。加热后空气从热风出口8出空气加热器。
图4是烧结矿冷却杯底座,图6是烧结矿冷却杯。
空气加热器出来的热风从热风管11鼓入坐落在底座凹槽9上的冷却杯12内。
达到烧结终点的热烧结矿倒入冷却杯12内,落在炉篦13上,利用从热风管11鼓入的热风将其冷却。烧结矿冷却杯12与冷却杯底座是独立的,通过底座凹槽9连接,烧结矿冷却完成后取下烧结矿冷却杯,倒出烧结矿进行后续处理。

Claims (5)

1、一种烧结矿热风冷却试验装置,由空气加热器、烧结矿冷却杯底座和坐落于烧结矿冷却杯底座上的烧结矿冷却杯组成,空气加热器和烧结矿冷却杯底座通过热风管道(11)连接;烧结矿冷却杯(12)与冷却杯底座通过底座凹槽(9)连接。
2、根据权利要求1所述的烧结矿热风冷却试验装置,其特征是:空气加热器包括空气加热器主体(1),煤气总阀门(2),空气加热器凹槽(3),煤气阀门(4),压缩风入口(5),煤气总管(6),煤气支管(7),热风出口(8);煤气支管(7)伸入空气加热器凹槽(3)内,通过各煤气阀门(4)与煤气总管(6)连接,热风出口(8)位于空气加热器主体(1)尾部。
3、根据权利要求1所述的烧结矿热风冷却试验装置,其特征是:烧结矿冷却杯底座包括冷却杯底座凹槽(9),底座支架(10),热风管道(11);冷却杯底座凹槽(9)连接于底座支架(10)上方,热风管道(11)连接于烧结杯底座凹槽(9)下方。
4、根据权利要求1所述的烧结矿热风冷却试验装置,其特征是:烧结矿冷却杯包括冷却杯体(12)和位于其底部的冷却杯炉篦(13)。
5、根据权利要求1所述的烧结矿热风冷却试验装置,其特征是:空气加热器主体(1)采用增大空气受热行程的设计,在空气加热器主体内部等距离分布若干凹槽(3),将空气加热器分割为若干相连通的加热室伸入空气加热器凹槽(3)内的煤气支管(7)上下错落分布。
CNU2008201235428U 2008-11-04 2008-11-04 烧结矿热风冷却试验装置 Expired - Fee Related CN201289445Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201235428U CN201289445Y (zh) 2008-11-04 2008-11-04 烧结矿热风冷却试验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201235428U CN201289445Y (zh) 2008-11-04 2008-11-04 烧结矿热风冷却试验装置

Publications (1)

Publication Number Publication Date
CN201289445Y true CN201289445Y (zh) 2009-08-12

Family

ID=40981129

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201235428U Expired - Fee Related CN201289445Y (zh) 2008-11-04 2008-11-04 烧结矿热风冷却试验装置

Country Status (1)

Country Link
CN (1) CN201289445Y (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102012166A (zh) * 2010-07-15 2011-04-13 秦皇岛首秦金属材料有限公司 一种用于烧结矿的冷却方法
CN114047220A (zh) * 2021-11-25 2022-02-15 北京首钢股份有限公司 一种烧结矿冷却试验装置和试验方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102012166A (zh) * 2010-07-15 2011-04-13 秦皇岛首秦金属材料有限公司 一种用于烧结矿的冷却方法
CN114047220A (zh) * 2021-11-25 2022-02-15 北京首钢股份有限公司 一种烧结矿冷却试验装置和试验方法

Similar Documents

Publication Publication Date Title
CN101762154B (zh) 一种节能型陶瓷隧道窑
CN201289445Y (zh) 烧结矿热风冷却试验装置
CN104805247B (zh) 一种高炉热风炉助燃风机的节能调控方法
CN202973162U (zh) 生物质炉进风自动控制系统
CN202792964U (zh) 外加热小型烧结中断实验炉
CN102586592A (zh) 优化链篦机-回转窑氧化球团热工制度的方法及系统
CN207872304U (zh) 一种球磨机供热装置
CN203216232U (zh) 一种快速恒温烘烤炉
CN204513479U (zh) 可控配风火炕专用炉
CN202792519U (zh) 节能温控热风炉
CN201751402U (zh) 浮法玻璃退火窑余热利用装置
CN103994474A (zh) 带有真空保温层和分段板式换热器的燃气炉及燃烧方法
CN204902599U (zh) 一种提高空气推板窑气氛均匀性的进排气系统
CN209101810U (zh) 一种利用余热的点火炉
CN206494853U (zh) 下出料开孔珍珠岩膨胀炉
CN205169909U (zh) 一种气帘阻热加料装置
CN210420009U (zh) 一种高炉喷煤用电磁感应竖式煤粉加热器
CN205373382U (zh) 一种新型烘干退火设备结构
CN204612160U (zh) 一种多功能蒸汽锅炉
CN203443331U (zh) 具有加热的新鲜空气的烧结机
CN203893245U (zh) 带有真空保温层和分段板式换热器的燃气炉
CN203116547U (zh) 钼条烧结节氢装置
CN204254877U (zh) 四回程中央分流加温热水炉
CN207035858U (zh) 一种膨胀珍珠岩焙烧自流预热装置
CN205187888U (zh) 一种制备硅酸钠用装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100041 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing

Patentee after: Shougang Group Co. Ltd.

Address before: 100041 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing

Patentee before: Capital Iron & Steel General Company

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090812

Termination date: 20171104

CF01 Termination of patent right due to non-payment of annual fee