CN201288501Y - Full-hydraulic drive device while drilling of major diameter drill while drilling and casing - Google Patents
Full-hydraulic drive device while drilling of major diameter drill while drilling and casing Download PDFInfo
- Publication number
- CN201288501Y CN201288501Y CNU2008201588966U CN200820158896U CN201288501Y CN 201288501 Y CN201288501 Y CN 201288501Y CN U2008201588966 U CNU2008201588966 U CN U2008201588966U CN 200820158896 U CN200820158896 U CN 200820158896U CN 201288501 Y CN201288501 Y CN 201288501Y
- Authority
- CN
- China
- Prior art keywords
- pile
- drilling
- casing
- case body
- drive device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a entirely hydraulic drill-following tube drive device for a large-diameter drill-following tube drilling machine, a conduit tube (13) for an auger stem to through is arranged on a case body (4), a safety guide base (3) and a damper spring (2) for connecting the case body (4) to the lower of a earth-storing box are arranged on the case body (4), four eccentric excitation blocks (5) and two eccentric block installation shafts (14) and four axle seats (6) thereof are mounted on the case body (4) taking the conduit tube (13) as a shaft symmetry, a oscillation motor (10) is mounted on the case body (4) and connected with the eccentric block installation shafts (14) through a clutch (9), a first pile cap (7), a pile clip (11) and a pile-clipping oil cylinder (12) for mounting and locating a preformed pile corresponding to the conduit tube (13), are arranged below the case body (4). The utility model is capable of driving preformed tube pile with two pore diameters by vibration to be pressed into the strata together with the drill rod when drilling by using the auger stem, and has low failure rate, simple structure, convenient maintenance and attendance, long service life, and low fabricating cost.
Description
Technical field
The utility model relates to a kind of drive unit of rig, particularly relates to a kind of all-hydraulic drilling follow tube drive device that is applicable to the major diameter drill while drilling and casing of boring slip casting preformed pile (CRG stake) stake type construction.
Background technology
Major diameter drill while drilling and casing is a kind of building pile foundation novel pore-forming equipment of constructing that is applied to.It will be pressed into the stratum with the prefabricated tubular pile vibration by the drilling follow pipe unit by in the auger stem drilling and forming hole, plays the effect of aperture retaining wall.After pore-forming finishes, according to stake hole designing requirement preformed pile is stayed in the hole directly placing of concrete or preformed pile is extracted aperture placing of concrete again, even be directly to use the preformed pile pile, and need not placing of concrete.The function of major diameter drill while drilling and casing driving prefabricated tubular pile realizes by all-hydraulic drilling follow tube drive device just.
Very similar with the drilling follow tube drive device is the vibrator that is applied on the vibrating hammer, and the principle that they produce exciting force is consistent, all is the exciting force that produces vertical direction by the rotation of eccentricity excitation piece.But the vibrator on the vibrating hammer can only be used for independent vibration construction, and can't construct simultaneously with auger stem.Especially, the greatest problem of vibrator is the realization of frequency modulation accent square.The vibrating hammer vibrator generally is that the phase difference of two-layer eccentricity excitation piece was realized frequency modulation accent square about employing gear drive rigidity changed synchronously both at home and abroad.Adopt this mode to realize frequency modulation accent square, have two big defectives: first vibrator mechanical mechanism is too complicated, the high and maintenance inconvenience of cost of production; It two is because high-speed gear running must cause high temperature, and makes that because of the eccentric block action of centrifugal force bending of gear main shaft, the overlap coefficient of gear reduce, and then causes that gear-driven impact shock, noise increase and the bearing capacity decline of gear.Therefore, driving members such as gear are easy to damage, and whole vibrator mechanical system reliability is not high.
The utility model content
Technical problem to be solved in the utility model provides a kind of rig that makes when using auger stem to creep into, and can follow the all-hydraulic drilling follow tube drive device of major diameter drill while drilling and casing that drilling rod is pressed into the stratum together by the vibratory drive prefabricated tubular pile.
In order to solve the problems of the technologies described above, the all-hydraulic drilling follow tube drive device of the major diameter drill while drilling and casing that the utility model provides, on casing, connect to be provided with and be convenient to the conduit that auger stem passes through, on described casing, be provided with safe guide holder and the damping spring being convenient to connect at the native lower box part of storage, on described casing with described conduit for axially being symmetrically installed with two eccentricity excitation pieces and eccentric block installation shaft and axle bed, vibrating motor is installed on the described casing and by shaft coupling and is connected with described eccentric block installation shaft, and corresponding first pile cover that is used for installing and locating preformed pile with described conduit is installed below described casing, pile holder and folder stake oil cylinder thereof.
As a kind of improvement of the present utility model, in described first pile cover, second pile cover is installed.
Adopt the all-hydraulic drilling follow tube drive device of major diameter drill while drilling and casing of technique scheme, two eccentric block installation shaft respectively are equipped with two eccentricity excitation pieces, vibrating motor drives two eccentric block installation shaft by shaft coupling and rotates in opposite directions, and then make four eccentricity excitation pieces rotate in opposite directions in twos, the horizontal exciting force direction of its generation is cancelled each other on the contrary, vertical exciting force is stack mutually then, therefore makes whole drilling follow tube drive device up-down vibration produce driving force.When under different geological conditionss, constructing, flow by regulation of hydraulic system hydraulic vibration motor, just can reach drilling follow pipe unit frequency modulation and transfer the purpose of square, and the gear frequency modulation that need not vibrator complexity on the vibrating hammer is transferred moment device, makes that whole frame for movement is simple, fault rate is low, maintaining is convenient, long service life, low cost of manufacture.The rotary drilling of vibration of the present utility model and auger stem is carried out simultaneously, auger stem can pass the drilling follow pipe unit by conduit and be rotated drilling construction in the prefabricated tubular pile the inside, thereby has realized the drilling follow pipe function of major diameter drill while drilling and casing.In drilling follow pipe unit when construction vibration, can fix prefabricated tubular pile and lead by two pile holders of two folder stake hydraulic oil cylinder driving of bottom, with carrying out smoothly of guaranteeing that pile tube is pressed into.Simultaneously, the drilling follow pipe unit can make up by the different mounting or dismounting of first pile cover and second pile cover, prefabricated tubular pile that can two kinds of different apertures of vibratory drive.The utility model is connected with the native case of storage by four damping springs, plays the damping, buffering effect.Safe guide holder can play good guide effect to the up-down vibration of whole device; and when damping spring lost efficacy because of a variety of causes such as fatigues; whole device is unlikely to because the connection of four safe guide holders is arranged to fall from the high-altitude and causes construction accident, plays good safeguard protection effect.
In sum, the utility model is that a kind of rig that makes is when using auger stem to creep into, prefabricated tubular pile that can two kinds of different apertures of vibratory drive follows that drilling rod is pressed into the stratum together and fault rate is low, simple in structure, maintaining is convenient, long service life, the all-hydraulic drilling follow tube drive device of the major diameter drill while drilling and casing of low cost of manufacture.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is a structure vertical view of the present utility model;
Fig. 3 is that A of the present utility model is to view.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1, Fig. 2 and Fig. 3, conduit 13 connects and is installed on the casing 4, being convenient to auger stem passes through, above casing 4, be provided with safe guide holder 3 and the damping spring 2 being convenient to connect in the native case of storage 1 bottom, on casing 4 the insides, serve as that axially symmetry is equipped with two eccentric block installation shaft 14 by axle bed 6 with conduit 13, the two ends of every eccentric block installation shaft 14 are separately installed with an eccentricity excitation piece 5, vibrating motor 10 is installed in casing 4 sides, vibrating motor 10 is in transmission connection by shaft coupling 9 and eccentric block installation shaft 14, it is first pile cover 7 of Φ 1000 that the corresponding diameter that is used for installing and locatees preformed pile with conduit 13 is installed below casing 4, it is second pile cover 8 of Φ 800 that diameter also is installed in first pile cover 7, also is equipped with below casing 4 and conduit 13 corresponding pile holder 11 and the folder stake oil cylinders 12 thereof that are used for installing and locating preformed pile.
Referring to Fig. 1, Fig. 2 and Fig. 3, two eccentric block installation shaft 14 respectively are equipped with two eccentricity excitation pieces 5, vibrating motor 10 drives two eccentric block installation shaft 14 by shaft coupling 9 and rotates in opposite directions, and then make four eccentricity excitation pieces 5 rotate in opposite directions in twos, the horizontal exciting force direction of its generation is cancelled each other on the contrary, vertical exciting force is stack mutually then, therefore makes whole drilling follow tube drive device up-down vibration produce driving force.When under different geological conditionss, constructing, flow by regulation of hydraulic system hydraulic vibration motor 10, just can reach drilling follow pipe unit frequency modulation and transfer the purpose of square, and the gear frequency modulation that need not vibrator complexity on the vibrating hammer is transferred moment device, makes that whole frame for movement is simple, fault rate is low, maintaining is convenient, long service life, low cost of manufacture.
The vibration of drilling follow pipe unit and the rotary drilling of auger stem are carried out simultaneously, auger stem can pass the drilling follow pipe unit by conduit 13 and be rotated drilling construction in the prefabricated tubular pile the inside, thereby has realized the drilling follow pipe function of major diameter drill while drilling and casing.The bottom of casing 4 is equipped with Φ 800 second pile covers 8 and Φ 1,000 first pile covers 7, Φ 800 second pile covers 8 just can vibrate when being installed in below Φ 1,000 first pile covers 7 and be pressed into the prefabricated tubular pile that diameter is Φ 800, then can vibrate during cancellation Φ 800 second pile covers 8 and be pressed into the prefabricated tubular pile that diameter is Φ 1000, thereby realize that the complete machine multiple aperture creeps into function.In drilling follow pipe unit when construction vibration, can drive 11 pairs of prefabricated tubular piles of two pile holders by two folder stake oil cylinders 12 of bottom and fix and lead, with carrying out smoothly of guaranteeing that pile tube is pressed into.
Whole drilling follow pipe unit is connected with the native case 1 of storage by four damping springs 2, plays the damping, buffering effect.Secondly; between native case 1 of storage and device, also be connected with four safe guide holders 3; safe guide holder 3 has the rectangle gathering sill; the length of groove is greater than the stroke of damping spring 2; thereby not only do not influence the work of spring; and can play good guide effect to the up-down vibration of whole device; and when damping spring 2 lost efficacy because of a variety of causes such as fatigues; whole device is unlikely to because the connection of four safe guide holders 3 is arranged to fall from the high-altitude and causes construction accident, plays good safeguard protection effect.
Claims (2)
1, the all-hydraulic drilling follow tube drive device of a kind of major diameter drill while drilling and casing, it is characterized in that: go up perforation at casing (4) and be provided with the conduit (13) of being convenient to auger stem and passing through, on described casing (4), be provided with safe guide holder (3) and the damping spring (2) being convenient to connect at the native lower box part of storage, go up with described conduit (13) to axially being symmetrically installed with two eccentricity excitation pieces (5) and eccentric block installation shaft (14) thereof and axle bed (6) at described casing (4), vibrating motor (10) is installed in described casing (4) and upward and by shaft coupling (9) is connected with described eccentric block installation shaft (14), in described casing (4) below corresponding first pile cover (7) that is used for installing and locating preformed pile with described conduit (13) is installed, pile holder (11) and folder stake oil cylinder (12) thereof.
2, the all-hydraulic drilling follow tube drive device of major diameter drill while drilling and casing according to claim 1 is characterized in that: second pile cover (8) is installed in described first pile cover (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201588966U CN201288501Y (en) | 2008-10-24 | 2008-10-24 | Full-hydraulic drive device while drilling of major diameter drill while drilling and casing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201588966U CN201288501Y (en) | 2008-10-24 | 2008-10-24 | Full-hydraulic drive device while drilling of major diameter drill while drilling and casing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201288501Y true CN201288501Y (en) | 2009-08-12 |
Family
ID=40980180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201588966U Expired - Fee Related CN201288501Y (en) | 2008-10-24 | 2008-10-24 | Full-hydraulic drive device while drilling of major diameter drill while drilling and casing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201288501Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758434A (en) * | 2011-04-26 | 2012-10-31 | 上海城地建设发展有限公司 | Pile-sinking device for centrally driving prestressed centrifugal pipe pile (square pile) and novel pile-sinking method thereof |
CN108316911A (en) * | 2018-04-04 | 2018-07-24 | 广州市建筑科学研究院有限公司 | A kind of automatic control system for drilling follow thin wall tubular pile machine |
CN108868665A (en) * | 2018-06-29 | 2018-11-23 | 张家口市宣化正远钻采机械有限公司 | A kind of water drilling rig casing positioning propulsion device |
-
2008
- 2008-10-24 CN CNU2008201588966U patent/CN201288501Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758434A (en) * | 2011-04-26 | 2012-10-31 | 上海城地建设发展有限公司 | Pile-sinking device for centrally driving prestressed centrifugal pipe pile (square pile) and novel pile-sinking method thereof |
CN102758434B (en) * | 2011-04-26 | 2016-02-03 | 上海城地建设股份有限公司 | Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof |
CN108316911A (en) * | 2018-04-04 | 2018-07-24 | 广州市建筑科学研究院有限公司 | A kind of automatic control system for drilling follow thin wall tubular pile machine |
CN111441350A (en) * | 2018-04-04 | 2020-07-24 | 广州市建筑科学研究院有限公司 | Control method for pipe-following pile driver while drilling |
CN111441350B (en) * | 2018-04-04 | 2022-03-15 | 广州市建筑科学研究院有限公司 | Control method for pipe-following pile driver while drilling |
CN108316911B (en) * | 2018-04-04 | 2023-05-23 | 广州市建筑科学研究院有限公司 | Automatic control system for following pipe pile machine while drilling |
CN108868665A (en) * | 2018-06-29 | 2018-11-23 | 张家口市宣化正远钻采机械有限公司 | A kind of water drilling rig casing positioning propulsion device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101821471B (en) | Magnetic hammer | |
CN103423074B (en) | Weave power acquisition device adopting floating body and rope wheel | |
CN102900354B (en) | A kind of hydraulic pressure Action of Superhigh Frequency Vibration unit head | |
CN102140893B (en) | Magnetorheological intelligent drilling vibration damper | |
CN101382039B (en) | Full-hydraulic drive while drilling of major diameter drill while drilling and casing | |
CN101382040A (en) | Major diameter drill while drilling and casing | |
CN202788611U (en) | Hydraulic ultra high frequency vibration power head | |
CN102002941B (en) | Large-aperture long screw rig, reinforcement cage concreting device and fabricating method of large-aperture deep pile | |
CN103015421B (en) | A kind of excitation method of hydraulic vibratory hammer device | |
CN201288501Y (en) | Full-hydraulic drive device while drilling of major diameter drill while drilling and casing | |
WO2009147698A1 (en) | Buffer device of excitation device | |
CN204402349U (en) | Hydraulic pressure high frequency down-the-hole at the bottom of rotary pile-digging machine hole breaks rock and bores | |
CN201144638Y (en) | Top vibrating rotary drilling power head device | |
CN200992970Y (en) | Deep soil subgrade core drilling rig | |
CN201284619Y (en) | Large-diameter while-drilling pipe-following drill rig | |
CN202673136U (en) | Vibration impact device and piling worker drilling unit head device comprising same | |
CN1975093B (en) | Rotary vibrating unit head | |
CN201459546U (en) | Vibration drive mechanism of tamping device | |
CN202073097U (en) | Portable internal combustion type piling machine | |
CN210217611U (en) | High-frequency hydraulic vibration tool | |
CN213627506U (en) | Novel oil field borehole operation is salvaged device | |
CN102187057B (en) | Isolation system for drilling systems | |
CN208844538U (en) | A kind of small rammer for building | |
CN209339932U (en) | A kind of depth measurement device for rotary excavation drill machine | |
CN200989161Y (en) | Whirling vibration unit head |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090812 Termination date: 20131024 |