CN201288014Y - Large-span network frame dome installation sling - Google Patents

Large-span network frame dome installation sling Download PDF

Info

Publication number
CN201288014Y
CN201288014Y CNU2008201861760U CN200820186176U CN201288014Y CN 201288014 Y CN201288014 Y CN 201288014Y CN U2008201861760 U CNU2008201861760 U CN U2008201861760U CN 200820186176 U CN200820186176 U CN 200820186176U CN 201288014 Y CN201288014 Y CN 201288014Y
Authority
CN
China
Prior art keywords
node
support bar
upper rack
rack posts
fulcrum bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201861760U
Other languages
Chinese (zh)
Inventor
牛尚洲
吴立文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUZHOU ZHONGMEI STEEL CONSTRUCTION CO Ltd
Original Assignee
XUZHOU ZHONGMEI STEEL CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU ZHONGMEI STEEL CONSTRUCTION CO Ltd filed Critical XUZHOU ZHONGMEI STEEL CONSTRUCTION CO Ltd
Priority to CNU2008201861760U priority Critical patent/CN201288014Y/en
Application granted granted Critical
Publication of CN201288014Y publication Critical patent/CN201288014Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a network frame installation sling, in particular to a network frame dome installation sling with big span which is mainly applied in installing main body network frame domes of big span material storage bins such as mines, power plants, cement factories and the like. The sling comprises an upper support bar and a lower support bar, wherein the upper support bar and the lower support bar form a node A, a node B and a node C, the upper support bar and the lower support bar on the node A are connected through a centre shaft, a crown block is arranged on the top end of the upper support bar, the upper support bar of the node B is provided with a plurality of adjusting holes, clamps on the upper support bar are fixed through connecting bolts, the clamps on the upper support bar are provided with clamping bolts, bearings are arranged on the lower support bar of the node C, the lower support bar is connected with the clamps on the lower support bar through fixing bolts, and the clamping bolts are arranged on the clamps of the lower support bar. The sling has simple structure and utilizes the upper support bar and the lower support bar which are connected through the central shaft, then, the angle of the support bars can be adjusted through rotation, the supporting frame can move horizontally on a network frame rod body through the bearings, and the use is convenient.

Description

The large span grid dome is installed suspender
Technical field
The utility model relates to a kind of rack suspender is installed, and specifically is that a kind of large span grid dome is installed suspender, is mainly used in the installation of large span storage bin main body rack domes such as colliery, power plant, cement mill.
Background technology
Outdoor heaps such as colliery, power plant, cement mill are got the stock ground and must be adopted totally-enclosed storage according to national requirements for environmental protection at present, mode is economic, practical to be widely adopted owing to large span (diameter is generally at 80-130m, height 40-80m) steel mesh frame housing is gone along with sb. to guard him, this version has two kinds of mounting meanss at present: a kind of is to adopt full hall scaffold high altitude bulk, this installation method does not need large lifting equipment to be adopted by all multiple-projects because technology is simple always.The weak point of this method is to set up a large amount of scaffolds, and labour intensity is big, and is long in time limit.Another kind is to adopt the large lifting equipment installation at high altitude.This installation method labour intensity is little, the duration short, but when setting height(from bottom) surpasses 50m, must could satisfy requirement for height with the large-scale hanging device of 50-200t, average ten thousand yuan of 60-80 of lifting cost.Therefore, big, long in time limit, the high promotion and application that restrict the large span grid dome of expense of labour intensity.
Summary of the invention
The purpose of this utility model is for overcoming above-mentioned the deficiencies in the prior art part, provide a kind of large span grid dome that suspender is installed, this suspender comprises upper rack posts, lower fulcrum bar, by upper rack posts, lower fulcrum bar configuration node A, Node B, node C, node A place upper rack posts, lower fulcrum bar connects by axis, there is fixed pulley on top at upper rack posts, the upper rack posts of Node B has some adjustment holes, by the fixing upper rack posts jig of tie bolt, on the upper rack posts jig binding bolt is arranged, on the lower fulcrum bar of node C bearing is arranged, lower fulcrum bar is connected with the lower fulcrum bar jig by bolt of rear end plate, on the lower fulcrum bar jig binding bolt is arranged.
The utility model is realized with following technical scheme: a kind of large span grid dome is installed suspender, comprise upper rack posts, lower fulcrum bar, it is characterized in that: by upper rack posts, lower fulcrum bar configuration node A, Node B, node C, node A place upper rack posts, lower fulcrum bar connects by axis, there is fixed pulley on top at upper rack posts, the upper rack posts of Node B has some adjustment holes, by the fixing upper rack posts jig of tie bolt, on the upper rack posts jig binding bolt is arranged, on the lower fulcrum bar of node C bearing is arranged, lower fulcrum bar is connected with the lower fulcrum bar jig by bolt of rear end plate, on the lower fulcrum bar jig binding bolt is arranged.
The described node A a of place to upper rack posts with can regulate the pole angle by rotating after lower fulcrum bar is connected by axis.
Described Node B is a upper rack posts length adjustment node, the length of regulating upper rack posts by some adjustment holes of upper rack posts.
Described node C is lower fulcrum bar and rod member for grid point of connection, the binding bolt of loosening lower fulcrum bar jig, and support can be by bearing parallel motion on rod member for grid.
The utility model has the advantages that: this hanger structure is simple, can regulate the pole angle by rotating after utilizing upper rack posts, lower fulcrum bar to connect by axis, support can be by bearing parallel motion on rod member for grid, easy to use, all finished by machinery in the whole lifting process, comparing with wheel crane does not need to increase in addition manpower.Duration is short, and expense is few, the about 3000-4000 of every cover suspender cost unit, and every cover suspender can repeatedly recycle.
Description of drawings
Below in conjunction with the drawings and the specific embodiments the utility model is described in further detail.
Fig. 1 is the utility model structural representation:
Fig. 2 is a node A place structural representation:
Fig. 3 is the node A a of place to scheme drawing:
Fig. 4 is a Node B place structural representation:
Fig. 5 is a node C place structural representation:
Among the figure: 1, upper rack posts, 2, lower fulcrum bar, 3, axis, 4, fixed pulley, 5, the upper rack posts jig, 6, tie bolt, 7, binding bolt, 8, the lower fulcrum bar jig, 9, bearing, 10, bolt of rear end plate, 11, binding bolt.
The specific embodiment
As shown in the figure: a kind of large span grid dome is installed suspender, comprise upper rack posts 1, lower fulcrum bar 2, by upper rack posts, lower fulcrum bar configuration node A, Node B, node C, node A place upper rack posts 1, lower fulcrum bar 2 connect by axis 3, on the top of upper rack posts 1 fixed pulley 4 is arranged, the upper rack posts 1 of Node B has some adjustment holes, be fixed with upper rack posts jig 5 by tie bolt 6, binding bolt 7 is arranged on the upper rack posts jig, on the lower fulcrum bar 2 of node C bearing 9 is arranged, lower fulcrum bar is connected with lower fulcrum bar jig 8 by bolt of rear end plate 10, and binding bolt 11 is arranged on the lower fulcrum bar jig.
The described node A a of place to upper rack posts 1 with can regulate the pole angle by rotating after lower fulcrum bar 2 is connected by axis 3.
Described Node B is a upper rack posts length adjustment node, the length of regulating upper rack posts by some adjustment holes of upper rack posts.
Described node C is lower fulcrum bar and rod member for grid point of connection, the binding bolt of loosening lower fulcrum bar jig, and support can be by bearing parallel motion on rod member for grid.
Working process is: rack at first is combined into single many bars of ball junior unit on ground, and weight is divided wind up unit and lower edge unit generally at 200-600kg.Power system is by the ground guide piece and be installed in rack top adhesion type support vertical-lift unit truss.The unit truss layering is installed continuously, and the adhesion type support is support with mounted rack, finishes the installation of different parts unit truss aloft by parallel motion and angular adjustment.
This installation suspender is light-duty assembly type suspender, make simple, easy to use can be at the scene or produce in factory according to the size of mesh opening of rack.Rack is brought into use after the 3-5 circle is installed, and suspender parallel motion and layering are vertically moved and finished by manpower, and be lightly convenient.This installation suspender is changed the grid structure that just can satisfy various ways a little and is installed.

Claims (4)

1, a kind of large span grid dome is installed suspender, comprise upper rack posts (1), lower fulcrum bar (2), it is characterized in that: by upper rack posts, lower fulcrum bar configuration node A, Node B, node C, node A place upper rack posts (1), lower fulcrum bar (2) connects by axis (3), on the top of upper rack posts (1) fixed pulley (4) is arranged, the upper rack posts of Node B (1) has some adjustment holes, be fixed with upper rack posts jig (5) by tie bolt (6), binding bolt (7) is arranged on the upper rack posts jig, bearing (9) is arranged on the lower fulcrum bar of node C (2), lower fulcrum bar is connected with lower fulcrum bar jig (8) by bolt of rear end plate (10), and binding bolt (11) is arranged on the lower fulcrum bar jig.
2, a kind of large span grid dome according to claim 1 is installed suspender, it is characterized in that: the described node A a of place can pass through rotation adjusting pole angle to upper rack posts (1) with after lower fulcrum bar (2) is connected by axis (3).
3, a kind of large span grid dome according to claim 1 is installed suspender, and it is characterized in that: described Node B is a upper rack posts length adjustment node, the length of regulating upper rack posts by some adjustment holes of upper rack posts.
4, a kind of large span grid dome according to claim 1 is installed suspender, and it is characterized in that: described node C is lower fulcrum bar and rod member for grid point of connection, the binding bolt of loosening lower fulcrum bar jig, and support can be by bearing parallel motion on rod member for grid.
CNU2008201861760U 2008-10-14 2008-10-14 Large-span network frame dome installation sling Expired - Lifetime CN201288014Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201861760U CN201288014Y (en) 2008-10-14 2008-10-14 Large-span network frame dome installation sling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201861760U CN201288014Y (en) 2008-10-14 2008-10-14 Large-span network frame dome installation sling

Publications (1)

Publication Number Publication Date
CN201288014Y true CN201288014Y (en) 2009-08-12

Family

ID=40979691

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201861760U Expired - Lifetime CN201288014Y (en) 2008-10-14 2008-10-14 Large-span network frame dome installation sling

Country Status (1)

Country Link
CN (1) CN201288014Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN105712213A (en) * 2014-12-03 2016-06-29 中国核工业二四建设有限公司 AP1000 nuclear power superposed dome hoisting construction method
CN106938823A (en) * 2017-02-28 2017-07-11 浙江亚厦装饰股份有限公司 Dome decorative components hanging method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN105712213A (en) * 2014-12-03 2016-06-29 中国核工业二四建设有限公司 AP1000 nuclear power superposed dome hoisting construction method
CN106938823A (en) * 2017-02-28 2017-07-11 浙江亚厦装饰股份有限公司 Dome decorative components hanging method
CN106938823B (en) * 2017-02-28 2018-03-16 浙江亚厦装饰股份有限公司 Dome decorative components hanging method

Similar Documents

Publication Publication Date Title
CN205051635U (en) Cable truss and intelligence cable trussing
CN201288014Y (en) Large-span network frame dome installation sling
CN105305940A (en) Cable truss and smart cable truss system
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN202744261U (en) Assembled continuous lifting jack for finishing threaded steel bar upright posts
CN204960456U (en) Roofing counter weight communication tower structure
CN205132955U (en) Hoist and mount operation of electric power industry low latitude is with hoist and mount frame
CN102616696B (en) Assembled continuous lifting jack for finish-rolling threaded steel bar vertical columns
CN202245670U (en) Special detachable hoisting device for double-fed type wind generating set base
CN203022329U (en) Nacelle frame without balancing weight
CN211127663U (en) Cold connection structure of photovoltaic power plant tubular pile basis and photovoltaic support
CN206271852U (en) A kind of multifunctional ligand recombination support bar
CN204571321U (en) A kind of integrated form steel bar meter booth structure
CN112683668A (en) Static load test device for communication support
CN111409656A (en) Adjustable mine inclined shaft maintenance operation platform
CN205945605U (en) Distributing type photovoltaic module ground mounting structure
CN216690449U (en) Truss floor carrier plate structure external protective net fixing structure
CN220394864U (en) Y-shaped cantilever reinforcing steel bar processing protection shed
CN216476628U (en) Landscape tower for communication
CN218843911U (en) Fixing structure for power transmission line iron tower
CN201082848Y (en) Portable hoisting transporting machine
CN202719336U (en) Video surveillance camera pole in converting station
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN219548353U (en) Novel horizontal truss attached with lifting scaffold
CN108134564B (en) Concrete photovoltaic roof support system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xuzhou ZM-besta Heavy Steel Structure Co.,Ltd.

Assignor: Xuzhou Zhongmei Steel Construction Co., Ltd.

Contract record no.: 2012320000562

Denomination of utility model: Large-span network frame dome installation sling

Granted publication date: 20090812

License type: Exclusive License

Record date: 20120428

EM01 Change of recordation of patent licensing contract

Change date: 20160118

Contract record no.: 2012320000562

Assignee after: HUZHOU ZM-BESTA HEAVY STEEL STRUCTURE CO., LTD.

Assignee before: Xuzhou ZM-besta Heavy Steel Structure Co.,Ltd.

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CX01 Expiry of patent term

Granted publication date: 20090812

CX01 Expiry of patent term