CN106938823B - Dome decorative components hanging method - Google Patents

Dome decorative components hanging method Download PDF

Info

Publication number
CN106938823B
CN106938823B CN201710115099.3A CN201710115099A CN106938823B CN 106938823 B CN106938823 B CN 106938823B CN 201710115099 A CN201710115099 A CN 201710115099A CN 106938823 B CN106938823 B CN 106938823B
Authority
CN
China
Prior art keywords
dome
crane
decorative components
skeleton
hanging
Prior art date
Application number
CN201710115099.3A
Other languages
Chinese (zh)
Other versions
CN106938823A (en
Inventor
周东珊
余贞海
余广
王欢欢
Original Assignee
浙江亚厦装饰股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 浙江亚厦装饰股份有限公司 filed Critical 浙江亚厦装饰股份有限公司
Priority to CN201710115099.3A priority Critical patent/CN106938823B/en
Publication of CN106938823A publication Critical patent/CN106938823A/en
Application granted granted Critical
Publication of CN106938823B publication Critical patent/CN106938823B/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets

Abstract

The invention discloses a kind of dome decorative components hanging method, it is intended to solve dome lifting process stationarity it is poor, position inconvenience deficiency.The invention dome skeleton first carries out tying up positioning when lifting by crane, it is ensured that lifts by crane the steady reliable of process, sling height carries out position adjustment afterwards in place, dome skeleton is directed at installation site, positioning is convenient, is easily installed.When dome lifts by crane, by Action of Gravity Field, suspender belt slides in ball sleeve, dome is in stationary position, improves the stationarity of dome lifting process.The setting of ball, frictional force in suspender belt sliding process is reduced, be easy to make dome be in stationary position, dome sling height carries out position adjustment afterwards in place, dome is directed at installation site, positioning is convenient, is easily installed.The decorative components such as sharp decorations, cover plate, side plate, character decoration, which are fitted into hanging basket, to be lifted by crane, and securely and reliably, operating efficiency is high.

Description

Dome decorative components hanging method

Technical field

The present invention relates to a kind of hanging method, more specifically, it relates to a kind of dome decorative components hanging method.

Background technology

At present, need skeleton and decorative components being lifted into installation site during dome installation, then assembled, hung Dress process is typically carried out using truck crane, after skeleton, decorative components are hung onto the suspension hook of truck crane, starts truck crane, by bone Frame, decorative components sling installation site upwards, are easy to the installation of worker.Due to having status requirement when skeleton is installed, skeleton is hung Play after installation site, it is necessary to adjustment position is allowed to be directed at installation position, could accurately be installed, but general at present use The artificial mode for promoting adjustment skeleton carries out the adjustment of position, and skeleton is typically heavier, and artificial to promote painstaking, and it is in lifting During, due to crank, easily rock, cause skeleton, decorative components position deviation occur, be unfavorable for location and installation.

The content of the invention

Instant invention overcomes dome lifting process stationarity it is poor, position inconvenience deficiency, there is provided a kind of dome decoration group Part hanging method, dome decorative components lifting process is steadily reliable, and positioning is convenient.

In order to solve the above-mentioned technical problem, the present invention uses following technical scheme:A kind of dome decorative components hanging method, Comprise the following steps:(1)Operating desk is built in erecting bed, the skeleton and decorative components of dome transport live specified location, vapour to It is in place that car lifts up into field, connects cable wind rope;(2)Suspender belt is connected on dome skeleton, then ties up positioning, suspender belt upper end is connected to On suspension hook;(3)Truck crane carries out examination and hung, and truck crane, steel wire rope working condition are checked after dome skeleton is lifted into certain altitude, Inspection continues up after all going well slings dome skeleton;(4)Sling height carries out position adjustment afterwards in place, makes dome skeleton pair Quasi- installation site, then slowly put down dome skeleton downwards;(5)Truck crane return lifts by crane dome, is opened up in advance on dome some Individual lifting hole position, some balls are uniformly installed on lifting hole position inserting ball sleeve, ball sleeve inwall, two balls diagonally set Suspender belt is connected between set, suspender belt both ends are all connected on suspension hook, and all suspender belts extend the equal length of ball sleeve, then start Truck crane slings dome upwards, and sling height carries out position adjustment afterwards in place, dome is directed at installation site;(6)Truck crane returns Position lifting decorative components, sharp decorations, cover plate, side plate, character are decorated these decorative components and are fitted into hanging basket, connect on hanging basket Suspender belt is connect, suspender belt upper end is connected on suspension hook, is then started truck crane and is sling hanging basket upwards, hanging basket unloads after reaching specified location Decorative components in hanging basket;(7)Worker on operating desk by the installation of dome skeleton it is fixed after, by dome, sharp decorations, cover plate, side plate, Character is decorated these decorative components and is installed on dome skeleton.

Dome skeleton first carries out tying up positioning when lifting by crane, it is ensured that lifts by crane the steady reliable of process, sling height is laggard in place Row position adjustment, dome skeleton is set to be directed at installation site, positioning is convenient, is easily installed.When dome lifts by crane, by Action of Gravity Field, hang Band slides in ball sleeve, dome is in stationary position, improves the stationarity of dome lifting process.The setting of ball, is reduced Frictional force in suspender belt sliding process, it is easy to make dome be in stationary position, dome sling height carries out position adjustment, made afterwards in place Dome is directed at installation site, and positioning is convenient, is easily installed.Sharp decorations, cover plate, side plate, character decorate these decorative components dress Enter in hanging basket and lifted by crane, securely and reliably, operating efficiency is high.This dome decorative components hanging method rises to dome decorative components It is steadily reliable to hang process, positioning is convenient, is easy to the installation of dome.

Preferably, the steel wire rope on truck crane is connected on suspension rod, suspension hook upper end is rotatably socketed on suspension rod, suspension hook The installation end spherical bearing between suspension rod, suspension hook upper end are provided with gear, install stepper motor on suspension rod, stepper motor output shaft with Gear coordinates transmission, when lifting by crane dome skeleton and the progress position adjustment of dome process, starts stepper motor, stepper motor drives and hung Hook rotates, so as to realize the adjustment of position.When lifting by crane dome skeleton and the progress position adjustment of dome process, by starting stepping electricity Machine drives suspension hook to rotate, and so as to carry out position adjustment to the dome skeleton or dome sling, positioning labor-saving is convenient, is easily installed.

Preferably, the lifting hole position on dome offers four, hole position is square is arranged in dome for four liftings Between position.Four lifting square arrangements of hole position, while Heave Here is increased, be advantageous to improve stationarity.

Rear inspection truck crane, steel wire rope and other hanging devices in place preferably, truck crane is marched into the arena, first check for starting Whether machine running part, operation brake portion, instrument, steel wire rope and these parts of hydraulic drive are normal, when confirmation no problem Afterwards, next-step operation is carried out.By checking each hanging device, the security of hoisting process is improved.

Preferably, in step(1)In, after the completion of operating desk is built, weld brackets are used for dome skeleton on operating desk Supporting.Weld brackets carry out supporting to dome skeleton, are easily installed positioning.

Preferably, truck crane sling height from the ground 20-50m when, shutdown inspection truck crane, steel wire rope and other lifting Equipment whether normal operation, after no problem is confirmed, be further continued for lifting by crane.The operation shape of equipment is checked when being lifted to certain altitude Condition, discharge potential safety hazard, it is ensured that the security of lifting.

Compared with prior art, the beneficial effects of the invention are as follows:Dome decorative components hanging method is to dome decorative components Lifting process is steadily reliable, and positioning is convenient, is easy to the installation of dome.

Embodiment

Below by specific embodiment, technical scheme is further described specifically:

Embodiment:A kind of dome decorative components hanging method, comprises the following steps:(1)Operating desk is built in erecting bed, After the completion of operating desk is built, weld brackets are used for the supporting of dome skeleton, skeleton and the decorative components fortune of dome on operating desk To live specified location, truck crane is marched into the arena in place, connects cable wind rope;(2)Suspender belt is connected on dome skeleton, it is fixed then to tie up Position, suspender belt upper end is connected on suspension hook;(3)Truck crane carries out examination and hung, and automobile is checked after dome skeleton is lifted into certain altitude Hang, steel wire rope working condition, inspection continues up after all going well and slings dome skeleton;(4)Sling height laggard line position in place Adjustment is put, dome skeleton is directed at installation site, then slowly puts down dome skeleton downwards;(5)Truck crane return lifts by crane dome, Four lifting hole positions are opened up on dome in advance, hole position is square is arranged on dome centre position for four liftings, in lifting hole position Ball sleeve is inserted, some balls are uniformly installed on ball sleeve inwall, suspender belt, suspender belt two are connected between two ball sleeves diagonally set End is all connected on suspension hook, and all suspender belts extend the equal length of ball sleeve, is then started truck crane and is sling dome upwards, rises Height rear progress position adjustment in place is hung, dome is directed at installation site;(6)Truck crane return lifts by crane decorative components, point is adornd, Cover plate, side plate, character are decorated these decorative components and are fitted into hanging basket, and suspender belt is connected on hanging basket, and suspender belt upper end is connected to On suspension hook, then start truck crane and sling hanging basket upwards, the decorative components in hanging basket are unloaded after hanging basket arrival specified location;(7) After worker fixes the installation of dome skeleton on operating desk, dome, sharp decorations, cover plate, side plate, character are decorated into these decorations Component is installed on dome skeleton.Steel wire rope on truck crane is connected on suspension rod, and suspension hook upper end is rotatably socketed on suspension rod, Installation end spherical bearing between suspension hook and suspension rod, suspension hook upper end are provided with gear, and stepper motor, stepper motor output are installed on suspension rod Axle coordinates with gear to be driven, and when lifting by crane dome skeleton and the progress position adjustment of dome process, starts stepper motor, stepper motor band Dynamic suspension hook rotates, so as to realize the adjustment of position.Truck crane checks that truck crane, steel wire rope and other liftings are set after marching into the arena in place It is standby, whether just to first check for driving engine part, operation brake portion, instrument, steel wire rope and these parts of hydraulic drive Often, after no problem is confirmed, next-step operation is carried out.Truck crane sling height from the ground 20-50m when, shutdown inspection truck crane, steel Cord and other hanging devices whether normal operation, after no problem is confirmed, be further continued for lifting by crane.

Dome skeleton first carries out tying up positioning when lifting by crane, it is ensured that lifts by crane the steady reliable of process, sling height is laggard in place Row position adjustment, dome skeleton is set to be directed at installation site, positioning is convenient, is easily installed.When dome lifts by crane, by Action of Gravity Field, hang Band slides in ball sleeve, dome is in stationary position, improves the stationarity of dome lifting process.The setting of ball, is reduced Frictional force in suspender belt sliding process, it is easy to make dome be in stationary position, dome sling height carries out position adjustment, made afterwards in place Dome is directed at installation site, and positioning is convenient, is easily installed.Sharp decorations, cover plate, side plate, character decorate these decorative components dress Enter in hanging basket and lifted by crane, securely and reliably, operating efficiency is high.This dome decorative components hanging method rises to dome decorative components It is steadily reliable to hang process, positioning is convenient, is easy to the installation of dome.

Embodiment described above is a kind of preferable scheme of the present invention, not the present invention is made any formal Limitation, there are other variants and remodeling on the premise of without departing from the technical scheme described in claim.

Claims (6)

1. a kind of dome decorative components hanging method, it is characterized in that, comprise the following steps:(1)Operating desk is built in erecting bed, The skeleton and decorative components of dome transport live specified location to, and truck crane is marched into the arena in place, connects cable wind rope;(2)Suspender belt is connected Onto dome skeleton, positioning is then tied up, suspender belt upper end is connected on suspension hook;(3)Truck crane carries out examination and hung, and dome skeleton is risen Truck crane, steel wire rope working condition are checked after hanging certain altitude, checks to continue up after all going well and slings dome skeleton; (4)Sling height carries out position adjustment afterwards in place, dome skeleton is directed at installation site, then slowly puts down dome bone downwards Frame;(5)Truck crane return lifts by crane dome, opens up several lifting hole positions on dome in advance, in lifting hole position inserting ball sleeve, rolling Some balls are uniformly installed on bead sleeve inwall, suspender belt is connected between two ball sleeves diagonally set, suspender belt both ends, which are all connected to, hangs On hook, all suspender belts extend the equal length of ball sleeve, then start truck crane and sling dome upwards, after sling height is in place Position adjustment is carried out, dome is directed at installation site;(6)Truck crane return lifts by crane decorative components, by sharp decorations, cover plate, side plate, people Object angle color is decorated these decorative components and is fitted into hanging basket, and suspender belt is connected on hanging basket, and suspender belt upper end is connected on suspension hook, Ran Houqi Electrical automobile is hung and slings hanging basket upwards, and the decorative components in hanging basket are unloaded after hanging basket arrival specified location;(7)Worker is on operating desk After the installation of dome skeleton is fixed, dome, sharp decorations, cover plate, side plate, character are decorated these decorative components and be installed to dome On skeleton.
2. dome decorative components hanging method according to claim 1, it is characterized in that, the steel wire rope on truck crane is connected to On suspension rod, suspension hook upper end is rotatably socketed on suspension rod, installation end spherical bearing between suspension hook and suspension rod, and the installation of suspension hook upper end is with teeth Take turns, stepper motor is installed on suspension rod, stepper motor output shaft coordinates with gear to be driven, and lifts by crane dome skeleton and the progress of dome process During position adjustment, start stepper motor, stepper motor drives suspension hook to rotate, so as to realize the adjustment of position.
3. dome decorative components hanging method according to claim 1, it is characterized in that, the lifting hole position on dome offers Four, hole position is square is arranged on dome centre position for four liftings.
4. dome decorative components hanging method according to claim 1, it is characterized in that, truck crane checks vapour after marching into the arena in place Car is hung, steel wire rope and other hanging devices, first check for driving engine part, operation brake portion, instrument, steel wire rope and Whether these parts of hydraulic drive are normal, after no problem is confirmed, carry out next-step operation.
5. the dome decorative components hanging method according to Claims 1-4 any one, it is characterized in that, in step(1) In, after the completion of operating desk is built, weld brackets are used for the supporting of dome skeleton on operating desk.
6. the dome decorative components hanging method according to Claims 1-4 any one, it is characterized in that, truck crane lifting Height from the ground 20-50m when, shutdown inspection truck crane, steel wire rope and other hanging devices whether normal operation, when confirming without asking After topic, it is further continued for lifting by crane.
CN201710115099.3A 2017-02-28 2017-02-28 Dome decorative components hanging method CN106938823B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710115099.3A CN106938823B (en) 2017-02-28 2017-02-28 Dome decorative components hanging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710115099.3A CN106938823B (en) 2017-02-28 2017-02-28 Dome decorative components hanging method

Publications (2)

Publication Number Publication Date
CN106938823A CN106938823A (en) 2017-07-11
CN106938823B true CN106938823B (en) 2018-03-16

Family

ID=59469300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710115099.3A CN106938823B (en) 2017-02-28 2017-02-28 Dome decorative components hanging method

Country Status (1)

Country Link
CN (1) CN106938823B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107628537B (en) * 2017-10-19 2019-06-04 中船黄埔文冲船舶有限公司 A kind of spud leg hanging method using secondary lever principle

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201288014Y (en) * 2008-10-14 2009-08-12 徐州中煤钢结构建设有限公司 Large-span network frame dome installation sling
CN203112332U (en) * 2013-03-11 2013-08-07 中国核工业第二二建设有限公司 Eccentric lifting device for dome
CN204454228U (en) * 2014-12-03 2015-07-08 中国核工业二四建设有限公司 AP1000 nuclear power steel dome lifting and fixing Current Collector Sleave

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07267582A (en) * 1994-03-28 1995-10-17 Komatsu Ltd Ceiling crane device
JP2852255B2 (en) * 1996-07-08 1999-01-27 宮地建設工業株式会社 Hanging equipment with retracting device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201288014Y (en) * 2008-10-14 2009-08-12 徐州中煤钢结构建设有限公司 Large-span network frame dome installation sling
CN203112332U (en) * 2013-03-11 2013-08-07 中国核工业第二二建设有限公司 Eccentric lifting device for dome
CN204454228U (en) * 2014-12-03 2015-07-08 中国核工业二四建设有限公司 AP1000 nuclear power steel dome lifting and fixing Current Collector Sleave

Also Published As

Publication number Publication date
CN106938823A (en) 2017-07-11

Similar Documents

Publication Publication Date Title
CN101548100B (en) Suspension device for wind wheel blade, method of mounting wind wheel blade, and method of constructing wind-driven generator
EP2144837B1 (en) A mounting device
CN200940077Y (en) Miniature crane
CN101548099B (en) Method of mounting rotor for wind-driven generator and method of constructing wind-driven generator
CN101230835B (en) Method and device for mounting of wind turbine blades
CN204441801U (en) A kind of Multifunctional special vehicle for electric wire construction
CN105270986B (en) Wind turbine blade lifting appliance and for lifting by crane wind turbine blade method
CN104884378B (en) The installation method of elevator
CN105121327B (en) For the apparatus and method for the rotor blade for placing wind turbine
CN206511849U (en) A kind of mobile tower crane
CN103738840B (en) Wind power generating set list blade right angle setting suspender and installation method thereof
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN205034589U (en) System for container is locked automatic dismounting device soon and is included it
CN201136745Y (en) Portable small-sized hoisting machine
CN205713018U (en) A kind of construction parapodium
CN105197808B (en) Building block charging crane
CN102756975A (en) Method for hoisting rolling mill housing
WO2010031528A3 (en) Hoisting device for a wind turbine
CN204689556U (en) Bay-lift in a kind of harbour construction
CN103754775B (en) A kind of movable arm tower crane tear arm method and auxiliary dismounting device open
CN103422662B (en) The integral movable type operation platform cast-in-place for elevator shaft and using method thereof
WO2012062352A1 (en) Lifting beam for use in hoisting a wind turbine blade
US9494133B2 (en) Method for lowering and raising a wind turbine blade
CN101972526B (en) Rescue device for small-diameter deep well
CN105460826A (en) Lifting device for electric power maintenance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant