CN201276693Y - Flood-protection pile fixer - Google Patents
Flood-protection pile fixer Download PDFInfo
- Publication number
- CN201276693Y CN201276693Y CNU2008201876338U CN200820187633U CN201276693Y CN 201276693 Y CN201276693 Y CN 201276693Y CN U2008201876338 U CNU2008201876338 U CN U2008201876338U CN 200820187633 U CN200820187633 U CN 200820187633U CN 201276693 Y CN201276693 Y CN 201276693Y
- Authority
- CN
- China
- Prior art keywords
- frame
- section steel
- channel
- flood
- steelframe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a flood control water pile fixer, comprising a square support, a square-shape steel support, a cable-stayed support and a steel pipe, having simple structure, simple operation, firm and safe application, which can effectively fix piles in flood, with high popularization value.
Description
Technical field
The utility model relates to a kind of timber fixator, specifically the quick fixedly timber fixator of timber in flood control.
Background technology
Flood is that human big disaster, especially a flood is when causing dykes and dams to inrush.When flood causes dykes and dams to inrush, mostly block breach with stone, sandbag etc., the one, stone, sandbag are difficult for the heap height, and the 2nd, flood washes away these easily.Sometimes earlier timber is pounded into dykes and dams with fixing stone sandbag, fix but timber is difficult for the short time.
Summary of the invention
Technical problem to be solved in the utility model provides anti-flood stake fixator at the existing in prior technology defective, simple in structure, easy to operate, uses firm, safety, the effective tool of spud pile when being flood control.
The technical scheme that its technical problem that solves the utility model adopts is: anti-flood stake fixator, its structure comprise all around channel-section steel, in the cross bath steelframe is arranged, the side's of formation frame has fixedly steel pipe of timber in the arranged outside of preceding channel-section steel and left and right sides channel-section steel; The front of described left and right sides channel-section steel is provided with the square shape steelframe.
The described rectangle frame left and right sides is provided with active section and reinforcing bar tiltedly draws support, and described reinforcing bar tiltedly draws the support upper end to be connected with rope.
Anti-flood stake fixator of the present utility model compared with prior art has following beneficial effect:
Anti-flood stake fixator of the present utility model, square frame fixes earlier on the ground, is placed on the steelframe openning the inside of first side's frame with the axle of second square frame, be pushed forward to the end, rope with the support back hangs on the ring of first side's frame back, and square then frame is set level forward, and support is holded up naturally, wear from the steel pipe of square frame with timber or steel pipe, connect in proper order, have simple in structure, easy to operate on the whole, characteristics such as use is firm, safety, the effective tool of spud pile when being flood control.So have excellent generalization values.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is further specified.
Fig. 1 is the structure vertical view of anti-flood stake fixator of the present utility model;
Fig. 2 is that the structure of anti-flood stake fixator of the present utility model connects stereogram.
Among the figure: 1, fixing steel pipe; 2, reinforcing bar tiltedly draws support; 3, active section; 4, the square shape steelframe; 5, rope; 6, the pit steelframe; 7, axle, 8, cross bracket, 9, preceding channel-section steel frame, 10, gap, 11, left channel-section steel frame, 12, right channel-section steel frame, 13, the hook ring, 14, hook.
The specific embodiment
Shown in figure, anti-flood stake fixator, its structure comprises preceding channel-section steel frame 9, pit steelframe 6, left channel-section steel frame 11, right channel-section steel frame 12, cross bracket 8, the side's of being connected to form frame; About square frame, be provided with fixedly steel pipe 1 of timber with the front; The left and right sides is provided with active section 3 and reinforcing bar tiltedly draws support 2; The first half of the described left and right sides is provided with square shape steelframe 4; The two ends of pit steelframe 6 are provided with axle 7, and the centre of preceding channel-section steel frame 9 is provided with gap 10.
Channel-section steel frame 9, pit steelframe 6, left channel-section steel frame 11, right channel-section steel frame 12 side's of being connected to form framves before described, the centre is provided with cross bracket 8, and described side's frame both sides are provided with fixedly steel pipe of timber, and the fixing steel pipe of the timber of preceding channel-section steel frame 9 arranged outside.
The described rectangle frame left and right sides is provided with active section 3 and reinforcing bar tiltedly draws support 2, and described reinforcing bar tiltedly draws the support upper end to be connected with rope 5.
Instantiation: adopt 2, long 1.4 meters wide 0.1 meter and 1 long 1.3 meters wide channel-section steel of 0.1 meter, long 1.3 meters wide 0.12 meter the channel-section steel side of making frame.
The requirement of side's frame:
One, the channel-section steel on both sides outside, front and back are inside.
Two, the front with wide 0.12 meter channel-section steel mouth upwards, the channel-section steel mouth that the usefulness of back is 0.1 meter is downward, the channel-section steel of front is than prominent 0.07 meter forward of both sides, the back to 0.05 meter of processus aboralis.
Three, one 0.11 meter gap is made in the outside of preceding channel-section steel frame in the centre, and gap on earth.
Four, square frame is middle downward with wide 0.1 meter channel-section steel steel mouth, makes cross and fixes.
Five, high 0.035 meter wide 0.08 meter long 1.20 meters square shape steelframe on the top work on the both sides of square frame, the back length of side of the channel-section steel of the analogy frame front, front of steelframe blocks for about 0.03 meter.
Six, the top reinforcing bar with 0.03 meter of diameter of the channel-section steel of square frame back makes to go up axle, short 0.02 meter of analogy frame.
Seven, the back on the face limit of square frame is 0.02 meter with diameter, long 0.80 meter reinforcing bar tiltedly draws support, support is provided with oblique rope, the fag end of front fixes on the hook ring of support front, the fag end of back is provided with hook, a ring is made in the front and the back on frame both sides, side, and support is by the movable energy-saving activity, and front and back are held with rope when erecting.
Eight, long 0.15 meter steel pipe of about 0.3 meter welding of each weld interval of the both sides of square frame and front, steel pipe is used for fixing timber.It is fixed that the diameter of steel pipe comes according to timber.
Using method: first side's frame fixes earlier on the ground, be placed on the steelframe openning the inside of first side's frame with the axle of second square frame, be pushed forward to the end, rope with the support back hangs on the ring of first side's frame back, and square then frame is set level forward, and the channel-section steel of second square frame back just has been placed in the channel-section steel mouth word of front of first side's frame, support is holded up naturally, wear from the steel pipe of square frame with timber or steel pipe, connect in proper order, the timber of front or steel pipe can not suppose that frame is high 0.3 meter.As when inrushing face width, can connect side by side by a plurality of side's framves.
The above embodiment is a kind of of the more preferably concrete embodiment of the utility model, and common variation that those skilled in the art carries out in the technical solutions of the utility model scope and replacement all should be included in the protection domain of the present utility model.
Claims (2)
1, anti-flood stake fixator, it is characterized in that: its structure comprises that square shape steelframe, preceding channel-section steel frame, pit steelframe, left and right sides channel-section steel, middle cross steelframe connect into the rectangle frame, described preceding channel-section steel frame and left and right sides channel-section steel arranged outside have fixedly steel pipe of timber; Described left and right sides channel-section steel outside front is provided with the square shape steelframe.
2, anti-flood stake fixator according to claim 1, it is characterized in that: the described rectangle frame left and right sides is provided with active section and reinforcing bar tiltedly draws support, and described reinforcing bar tiltedly draws the support upper end to be connected with rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201876338U CN201276693Y (en) | 2008-08-13 | 2008-08-13 | Flood-protection pile fixer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201876338U CN201276693Y (en) | 2008-08-13 | 2008-08-13 | Flood-protection pile fixer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201276693Y true CN201276693Y (en) | 2009-07-22 |
Family
ID=40894277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201876338U Expired - Fee Related CN201276693Y (en) | 2008-08-13 | 2008-08-13 | Flood-protection pile fixer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201276693Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102182161A (en) * | 2011-03-20 | 2011-09-14 | 胡洪新 | Device for blocking dike breach |
-
2008
- 2008-08-13 CN CNU2008201876338U patent/CN201276693Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102182161A (en) * | 2011-03-20 | 2011-09-14 | 胡洪新 | Device for blocking dike breach |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204530433U (en) | Steel pipe pile foundation combination steel trestle | |
CN204898537U (en) | Half gentle semi -rigid hangar tunnel protective structure | |
CN106638946A (en) | Connecting structure of reinforced concrete swinging column and reinforced concrete foundation | |
CN202208904U (en) | Semi-mobile combined flood-control dam | |
CN204825914U (en) | A reinforced concrete roof beam and fish belly sill combined supporting structure for complicated plane foundation ditch | |
CN203514309U (en) | Steel strand anchorage device base | |
CN201276693Y (en) | Flood-protection pile fixer | |
CN204738299U (en) | Form album device of sediment platform fast in steep side slope of height | |
CN203846512U (en) | Supporting device for long edges of strip-shaped and rectangular foundation pit | |
CN203846505U (en) | Supporting structure used for long edges of strip-shaped and rectangular foundation pit | |
CN204298836U (en) | A kind of pile film cofferdam skeleton structure | |
CN203007977U (en) | Composite protective structure for reinforced net-plane stopping wall | |
CN210262920U (en) | Multi-functional water conservancy slope protection net | |
CN213203973U (en) | Protector of hydraulic and hydroelectric engineering side slope | |
CN203846509U (en) | Angle bracing structure for foundation pit supporting | |
CN203545448U (en) | Special lifting appliance for dual-I-shaped water permeable framework | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN220928768U (en) | Equipment plummer | |
CN209693541U (en) | A kind of vertical hard revetment planting box and revetment structure | |
CN206233246U (en) | For the saw component of box formula equalizer bar foundation ditch support | |
CN105113387A (en) | Reconstruction structure and construction method of bridge bearing platform | |
CN215210559U (en) | Anti-scouring large-span continuous beam stress support | |
CN214832815U (en) | Can dismantle reuse shaped steel pipe cofferdam | |
CN210066656U (en) | Stake forest dam structure | |
CN203334242U (en) | Novel revetment frame structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090722 Termination date: 20110813 |