CN201268831Y - Lower inclined pull type hanging basket - Google Patents

Lower inclined pull type hanging basket Download PDF

Info

Publication number
CN201268831Y
CN201268831Y CNU2008200901949U CN200820090194U CN201268831Y CN 201268831 Y CN201268831 Y CN 201268831Y CN U2008200901949 U CNU2008200901949 U CN U2008200901949U CN 200820090194 U CN200820090194 U CN 200820090194U CN 201268831 Y CN201268831 Y CN 201268831Y
Authority
CN
China
Prior art keywords
girder
jack
hanging basket
construction
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200901949U
Other languages
Chinese (zh)
Inventor
孔令海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longjian Road and Bridge Co Ltd
Original Assignee
Longjian Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longjian Road and Bridge Co Ltd filed Critical Longjian Road and Bridge Co Ltd
Priority to CNU2008200901949U priority Critical patent/CN201268831Y/en
Application granted granted Critical
Publication of CN201268831Y publication Critical patent/CN201268831Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a downward diagonally drawn hanging bracket. With the construction of high-grade highways and the increase of construction projects of oversize bridges and large bridges, the pouring construction technique of a cantilever with longspan prestressed concrete girder type structure is widely applied. The downward diagonally drawn hanging bracket comprises a main beam (1) with a jack (2), wherein the main beam (1) with the jack (2) is connected with a girder (4) with a steel sleeper (3); the girder (4) is respectively connected with a front upper beam (5) and a rear upper beam (6); and the girder (4) is connected with a squeezer (7) and a moulding board (8) which is connected with a main girder (10) with a jack (9). The utility model is applied to bridge types, such as longspan prestressed cantilever girder slabs, continuous girder bridges, T-shaped rigid frameworks, continuous rigid frameworks, and the like.

Description

Following cable-stayed type Hanging Basket
Technical field:
The utility model relates to the following cable-stayed type Hanging Basket that uses in a kind of bridge construction.
Background technology:
Along with increasing of the construction of high-grade highway and grand bridge, Bridge Project project, stride footpath prestress concrete beam type structure cantilever pouring construction technology greatly and obtained using widely.The cast-in-place cantilever method major advantage is to need not to set up floor stand, need not goliath and cargo carrier, its capital equipment is a pair of walking Hanging Basket, Hanging Basket can be linked to be on the whole beam section at stretch-draw anchor and with pier shaft and moves, and assembling reinforcement, formwork erection, builds construction technologies such as concrete, prestressing force and can carry out on Hanging Basket.After finishing this section construction, Hanging Basket moves a sections symmetrically forward again, descend a pair of beam section construction, so step by step, section builds until closure and to finish.This job practices is particularly suitable for the river of the frequently unsuitable operation at sea in wide dark river, mountain valley, construction period SEA LEVEL VARIATION and navigation is frequent and need leave bridge construction under the conditions such as river of headroom greatly during construction.
Summary of the invention:
The purpose of this utility model provides that a kind of shaping is fast, utilization rate of equipment and installations is high, the cable-stayed type Hanging Basket is descended in construction flexibly.
Above-mentioned purpose realizes by following technical scheme:
Following cable-stayed type Hanging Basket, its composition comprises: main beam, the described main beam that has jack is connected with the girder that has steel sleeper, described girder is connected with preceding top rail, back top rail respectively, described girder is connected with compactor, described girder is connected with template, and described template is connected with the main longitudinal grider that has jack.
Described cable-stayed type Hanging Basket down, it is characterized in that: described template is connected with outer balladeur train.Described main longitudinal grider is connected with the back joist.
The beneficial effects of the utility model:
The utility model utilization rate height, cost is low, node is few, distortion is little, light weight, need not balance weight, structure is perfect, construction is flexible, applicability is strong., be applicable to stride greatly that footpath, wide dark river, mountain valley, navigation are frequent, the bridge top cantilever casting construction on the river that is difficult for operation at sea.
2. the utility model has been obtained significant effect in the bridge construction kind, has accelerated programming, and has controlled engineering cost effectively.
3. the utility model has been saved great deal of steel, has reduced cost, has improved operating efficiency.
4. the utility model Hanging Basket weight and cantilever weight ratio are about 0.3, compare with balance ballast Hanging Basket and other Hanging Baskets commonly used, have tangible advantage
Description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model.
The specific embodiment:
Following cable-stayed type Hanging Basket, its composition comprises: main beam 1, the described main beam 1 that has jack 2 is connected with the girder 4 that has steel sleeper 3, described girder 4 is connected with preceding top rail 5, back top rail 6 respectively, described girder 4 is connected with compactor 7, described girder 4 is connected with template 8, and described template 8 is connected with the main longitudinal grider 10 that has jack 9.
Described cable-stayed type Hanging Basket down, described template 8 is connected with outer balladeur train 11, and described main longitudinal grider 10 is connected with back joist 12.

Claims (2)

1. following cable-stayed type Hanging Basket, its composition comprises: main beam, it is characterized in that: the described main beam that has jack is connected with the girder that has steel sleeper, described girder is connected with preceding top rail, back top rail respectively, described girder is connected with compactor, described girder is connected with template, and described template is connected with the main longitudinal grider that has jack.
2. cable-stayed type Hanging Basket down according to claim 1, it is characterized in that: described template is connected with outer balladeur train, and described main longitudinal grider is connected with the back joist.
CNU2008200901949U 2008-06-12 2008-06-12 Lower inclined pull type hanging basket Expired - Fee Related CN201268831Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200901949U CN201268831Y (en) 2008-06-12 2008-06-12 Lower inclined pull type hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200901949U CN201268831Y (en) 2008-06-12 2008-06-12 Lower inclined pull type hanging basket

Publications (1)

Publication Number Publication Date
CN201268831Y true CN201268831Y (en) 2009-07-08

Family

ID=40841426

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200901949U Expired - Fee Related CN201268831Y (en) 2008-06-12 2008-06-12 Lower inclined pull type hanging basket

Country Status (1)

Country Link
CN (1) CN201268831Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102199916A (en) * 2011-04-12 2011-09-28 中铁三局集团有限公司 Cradle for pouring bridge cantilever and construction method of cradle
CN102322024A (en) * 2011-08-20 2012-01-18 中铁十二局集团第一工程有限公司 Staggered installation construction method of continuous beam cantilever construction hanging baskets
CN105484161A (en) * 2015-12-14 2016-04-13 中铁十九局集团第二工程有限公司 Method for constructing cast-in-place panel of T-shaped beam by using steel template
CN106958206A (en) * 2017-04-07 2017-07-18 中交第二公路勘察设计研究院有限公司 Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method
CN109457628A (en) * 2019-01-18 2019-03-12 郑州大学 A kind of novel rhombus Hanging Basket

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102199916A (en) * 2011-04-12 2011-09-28 中铁三局集团有限公司 Cradle for pouring bridge cantilever and construction method of cradle
CN102322024A (en) * 2011-08-20 2012-01-18 中铁十二局集团第一工程有限公司 Staggered installation construction method of continuous beam cantilever construction hanging baskets
CN105484161A (en) * 2015-12-14 2016-04-13 中铁十九局集团第二工程有限公司 Method for constructing cast-in-place panel of T-shaped beam by using steel template
CN106958206A (en) * 2017-04-07 2017-07-18 中交第二公路勘察设计研究院有限公司 Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method
CN106958206B (en) * 2017-04-07 2018-10-12 中交第二公路勘察设计研究院有限公司 Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method
CN109457628A (en) * 2019-01-18 2019-03-12 郑州大学 A kind of novel rhombus Hanging Basket

Similar Documents

Publication Publication Date Title
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN201526011U (en) Assembly type non-bracket casting side span cast-in-situ section and closure section in continuous rigid structure
CN105926444B (en) A kind of concrete arch-type bridge arching method
CN103290784B (en) Arched girder conjugative bridge construction method for hanging
CN103938546B (en) Simply supported non-uniform construction method
CN110331668A (en) A kind of back-cable-free cable-stayed bridge inclined in two-way V-shaped bridge tower construction method
CN204690605U (en) The self-propelled triangular truss hanging basket of large span beam bridge
CN101748682A (en) Steel-concrete composite beam adopting corrugated steel web and construction method thereof
CN102021889A (en) Bridge erection method
CN201268831Y (en) Lower inclined pull type hanging basket
CN201635008U (en) Combined bridge floor slab with steel-fiber reinforced composite material and high-strength concrete hollow interlayer
CN103924525B (en) Urban interchange industrialization short-term precast assembly construction method
WO2023016573A1 (en) Construction method for steel-concrete main girder of cable-stayed bridge
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN103266574A (en) Simply-supported box girder bridge strengthening method with oblique cables
CN206512581U (en) Transverse prestress overall with reinforced concrete bridge deck slab plate combination beam
CN201924289U (en) Bracket structure for 0# block of high-pier long-span continuous rigid frame bridge
CN103952979B (en) A kind of steel concrete superposed beam top board erection without scaffolding device and construction method
CN203200656U (en) Light corrugated steel-high strength reactive powder concrete combined bridge deck slab
CN114781026A (en) Construction control method for single leaning tower cable-stayed bridge
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN106758827B (en) Chevron shaped prestressed concrete pre-tensioned method Bridge Erector and application method
CN111663455A (en) Trackless light hydraulic creeping formwork
CN105603890A (en) Extradosed type external cable reinforced girder bridge
CN203741729U (en) Pre-stress supporting system used for bridge incremental launching construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090708

Termination date: 20170612