CN201245397Y CNU2008200146751U CN200820014675U CN201245397Y CN 201245397 Y CN201245397 Y CN 201245397Y CN U2008200146751 U CNU2008200146751 U CN U2008200146751U CN 200820014675 U CN200820014675 U CN 200820014675U CN 201245397 Y CN201245397 Y CN 201245397Y
Authority
CN
China
Prior art keywords
cage
disk
double
cage body
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200146751U
Other languages
Chinese (zh)
Inventor
杨丽萍
谢小京
李熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCTEG Shenyang Engineering Co., Ltd.
Original Assignee
Shenyang Design and Research Institute Sino-coal Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Design and Research Institute Sino-coal Engineering Group filed Critical Shenyang Design and Research Institute Sino-coal Engineering Group
Priority to CNU2008200146751U priority Critical patent/CN201245397Y/en
Application granted granted Critical
Publication of CN201245397Y publication Critical patent/CN201245397Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model provides a cage with multi ropes, double gates and double skips. The problems of the prior mine hoisting container that the hoisting capability is low and the production requirement is not satisfied are fundamentally solved. The technical essential is that a tank body consists of an upper layer of disk body, a middle disk layer of disk body and a lower disk layer of disk body, and eight columns which are arranged around. Two cuboid independent spaces are formed over and beneath the middle disk. A hopper with slope-shaped bottom is arranged in the independent space over the middle disk. Two load ports are arranged on one side at the upper part of the hopper. Two vertical unloading gates are arranged corresponding to the slope-shaped bottom on the same side at the lower part of the hopper. Two tank doors are arranged at two ends of the independent space beneath the middle disk. A tram road and a car arrester are arranged corresponding to the tank door on the lower disk. The utility model is of reasonable design and reliability. Tramcars, materials, big equipments and staff can be hoisted when the coal is hoisted, as a result, the cage is provided with double hoisting function.

Description

Many rope double lockss, two car skip bucket cage
Technical field
The utility model relates to a kind of lifting container of coal mine shaft lining, particularly a kind of many ropes double locks with three layers of disk body, two rooms for promotion, two car skip bucket cage that can promote materials such as coal, personnel, equipment, spoil simultaneously.
Background technology
At present, the lifting container of the vertical mine in colliery mainly contains two kinds of patterns: a kind of is skip bucket, is exclusively used in the main shaft hooist coal; Another kind is a cage, is used for auxiliary shaft and promotes personnel, mine car, material etc.Yet in some middle-size and small-size old mines, it is not to adopt skip bucket that many mines are subjected to the restriction of its working condition to carry coal, but utilizes cage, is about to coal and puts into mine car, treat mine car advance it is promoted to behind the cage aboveground.This hoisting way productive capacity is very low, is only applicable to little colliery, and along with old well reform, shaft deepening, above-mentioned container and the mode of carrying coal can not reach the requirements at the higher level of people to the mine hoisting ability.Want to improve the hoisting capacity of mine, and don't change lifting winch, so just have only by promoting container and could realize, this shows that lifting container has played crucial effects in coal master, auxiliary shaft production.Former Qinghe door mine---the double-deck two cars cage of restricting can once promote four mine cars more, promote 4 tons of coals altogether, though yet the mine car that promotes increases to some extent, but continued to use traditional cage pattern equally, be after coal is gone into mine car, it is aboveground to utilize cage that mine car is promoted to again, the still out of reach requirement of its hoisting capacity.For satisfying carrying out smoothly of mine production, be current vital task to the improvement of existing colliery lifting container.
The utility model content
The purpose of this utility model is for a kind of reasonable in design, safe and reliable many ropes double locks, two car skip bucket cage are provided, solve fundamentally that existing colliery lifting container hoisting capacity is low, the problem of out of reach production requirement, break through existing lifting container simple function pattern simultaneously, when promoting coal, finish the task of promoting mine car, material, large equipment, personnel etc. again, had dual enhanced feature.
The purpose of this utility model is achieved in that this cage, comprise tank body and be assembled in the head rope suspension gear that coils on the tank body, be assembled in the tang rope suspension gear of tank body lower wall, be assembled on the tank body rolling cage shoe group of dish and tank body lower wall respectively, its technical essential is: described tank body is by last, in, eight root posts around following three layers of disk body and the apportion assemble, form on the mid-game, under two cuboid separate space, separate space on described mid-game is provided with the bucket case that the bottom surface is ramped shaped, a top side of described bucket case is provided with two load port, in the corresponding ramp-like base of the bottom of described bucket case homonymy two vertical unloading gates are set, the two ends of the separate space under described mid-game are provided with a jar door, and corresponding described jar of door is provided with tramroad on described lower wall, stop device.
Because the utility model adopts the cage body that is assembled by eight root posts around upper, middle and lower-ranking disk body and the apportion, and bucket case and tramroad, stop device etc. are set respectively in two separate space of its formation, its reasonable in design, safe and reliable, make and the utlity model has dual enhanced feature, break through existing lifting container simple function pattern, when the bucket case promoted coal, the bottom separate space had been finished the task of promoting mine car, material, large equipment, personnel etc. again.Simultaneously, arrange in the design that two decorate, unload, promptly a side is provided with two load port on the bucket case, bottom homonymy at the bucket case is provided with two vertical unloading gates, both can utilize bucket case effective volume to greatest extent, can shorten the used time of loading, unloading again, reach the purpose that improves productive capacity.More than 2 solve that existing colliery lifting container hoisting capacity is low, the problem of out of reach production requirement.In addition, the container upper design becomes the bucket case, and purpose is to reduce the hoisting depth of container, when not increasing pulleying collision prevention girders height, satisfies aboveground discharge height needs.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is a kind of concrete structure scheme drawing of the present utility model;
Fig. 2 is the left view of Fig. 1.
Sequence number explanation among the figure: struggle against casees, 7 gates, 8 mid-games, 9 jars of doors, 10 tramroads, 11 lower walls, 12 tang rope suspension gears, 13 railings, 14 stop devices of dish, 4 cage bodies, 5 load port, 6 on 1 head rope suspension gear, the 2 rolling cage shoe groups, 3.
The specific embodiment
1-2 is described in detail the utility model in conjunction with the accompanying drawings.The utility model comprises tank body 4 and is assembled on the tank body head rope suspension gear 1 of dish 3, is assembled in the tang rope suspension gear 12 of tank body lower wall 11, is assembled in the rolling cage shoe group 2 of dish 3 and tank body lower wall 11 on the tank body etc. respectively.Head rope suspension gear 1 is many rope suspension types, adopts the head rope suspension gear and the supporting use of lifting winch (not shown) of national standard, and tang rope suspension gear 12 also adopts the national standard model according to concrete performance.The both sides of dish 3 and tank body lower wall 11 are assembled two groups of rolling cage shoe groups 2 respectively on tank body, and every group comprises three rolling cage shoes, as the guide piece of rectangle cage guide, have played the effect that reduces the cage horizontal vibration.The upper surface that coils on tank body also is assembled with railing 13.
Tank body 4 is assembled by eight root posts around upper, middle and lower-ranking disk body and the apportion, form two upper and lower cuboid separate space of mid-game 8, separate space on mid-game 8 is provided with bucket case 6, bucket case 6 sections are oblong, its size two car cage sections that are near the mark, its bottom surface is ramped shaped and utilizes base to stand on the mid-game, a top side of bucket case 6 is provided with two load port 5, bottom homonymy at bucket case 6 is provided with two vertical unloading gates 7,2 loadings, 2 unloadings have been formed, these two vertical unloading gate 7 corresponding ramp-like base.When cage puts in place, by outer power, two gates 7 to be opened simultaneously as cylinder, the coal by gravity in the bucket case 6 draws off cage by ramp-like base.Bucket case 6 effective unit weights can reach eight tons.The two ends of the separate space under mid-game 8 are provided with jar door 9, and corresponding jar of door 9 is provided with tramroad 10, stop device 14, handrail (not shown) etc. on 11 of lower walls, and this sheaf space mainly is the lifting task of finishing mine car, personnel, material, equipment.After mine car enters cage by jar door 9 along tramroad 10, under the control of stop device 14 in the cage hoisting process held stationary, safe and reliable.Same handrail also has protective effect to the staff.

Claims (1)

1, a kind of many rope double lockss, two car skip bucket cages, comprise the cage body and be assembled in the head rope suspension gear that coils on the cage body, be assembled in the tang rope suspension gear of cage body lower wall, be assembled on the cage body rolling cage shoe group of dish and cage body lower wall respectively, it is characterized in that: described cage body is by last, in, eight root posts around following three layers of disk body and the apportion assemble, form on the mid-game, under two cuboid separate space, separate space on described mid-game is provided with the bucket case that the bottom surface is ramped shaped, a top side of described bucket case is provided with two load port, in the corresponding ramp-like base of the bottom of described bucket case homonymy two vertical unloading gates are set, the two ends of the separate space under described mid-game are provided with a jar door, and corresponding described jar of door is provided with tramroad on described lower wall, stop device.
CNU2008200146751U 2008-08-08 2008-08-08 Multi-rope double-gate double-skip cage Expired - Fee Related CN201245397Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200146751U CN201245397Y (en) 2008-08-08 2008-08-08 Multi-rope double-gate double-skip cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200146751U CN201245397Y (en) 2008-08-08 2008-08-08 Multi-rope double-gate double-skip cage

Publications (1)

Publication Number Publication Date
CN201245397Y true CN201245397Y (en) 2009-05-27

Family

ID=40729214

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200146751U Expired - Fee Related CN201245397Y (en) 2008-08-08 2008-08-08 Multi-rope double-gate double-skip cage

Country Status (1)

Country Link
CN (1) CN201245397Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102295217A (en) * 2011-07-19 2011-12-28 焦作煤业(集团)新乡能源有限公司 On-line operation-monitoring system for cage and skip of mechanized mine
CN103588074A (en) * 2013-11-25 2014-02-19 徐州煤矿安全设备制造有限公司 Large-tonnage narrow and long external force type bend unloading skip bucket
CN108301836A (en) * 2018-04-03 2018-07-20 中煤科工集团南京设计研究院有限公司 A kind of movable stock and application method for large coal mine vertical main shaft mouth

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102295217A (en) * 2011-07-19 2011-12-28 焦作煤业(集团)新乡能源有限公司 On-line operation-monitoring system for cage and skip of mechanized mine
CN103588074A (en) * 2013-11-25 2014-02-19 徐州煤矿安全设备制造有限公司 Large-tonnage narrow and long external force type bend unloading skip bucket
CN103588074B (en) * 2013-11-25 2015-04-29 徐州煤矿安全设备制造有限公司 Large-tonnage narrow and long external force type bend unloading skip bucket
CN108301836A (en) * 2018-04-03 2018-07-20 中煤科工集团南京设计研究院有限公司 A kind of movable stock and application method for large coal mine vertical main shaft mouth
CN108301836B (en) * 2018-04-03 2023-11-17 中煤科工集团南京设计研究院有限公司 Movable sleeve frame for main wellhead of large coal mine vertical shaft and use method

Similar Documents

Publication Publication Date Title
CN201245397Y (en) Multi-rope double-gate double-skip cage
CN102839840B (en) Low-carbon efficient convenient and fast intelligent parking garage
CN101695981A (en) Energy storage type passenger and freight transportation vertical conveyer
CN202690063U (en) Derrick-free shaft-sinking construction device for mine shaft
CN203237895U (en) Energy-saving load vertical lifting device
CN103334755A (en) Slope hoisting and crushing system for deep open-pit mine
CN205555823U (en) Bbservation elevator's drive arrangement
CN107989432A (en) A kind of multi-storied garage
CN203319467U (en) Combination type double-layered suspension cage of construction elevator
CN205061263U (en) Lift cage
CN102134928B (en) Petal basket type intelligent underground parking garage
CN201614767U (en) Pit load balanced mechanized three-dimensional parking garage
CN201808996U (en) Elevator without machine room
CN207017717U (en) A kind of steady elevating three-dimensional parking garage
CN107651530B (en) Lifting machine
CN203079501U (en) Host elevator for coal mine
CN102862897A (en) Hydraulic speed control potential energy elevator
CN201534738U (en) Energy-saving construction elevator with rack and pinion
CN204607324U (en) Bottom elevator without cabin
CN202245623U (en) Winding device for steel wire ropes of elevators
CN218024885U (en) Mine elevator system
CN201338900Y (en) Novel elevator counterweight device
CN114380177B (en) Cage skip for mine vertical shaft
CN204528970U (en) A kind of device preventing accidental movement of elevator cage
CN107512644A (en) Skip bucket pulleying buffer and supporting cage device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CCTEG SHENYANG ENGINEERING CO., LTD.

Free format text: FORMER NAME: SHENYANG DESIGN AND RESEARCH INSTITUTE, SINO-COAL ENGINEERING GROUP

CP01 Change in the name or title of a patent holder

Address after: Xiannongtan road in Shenhe District of Shenyang City, Liaoning Province, No. 12 110015

Patentee after: CCTEG Shenyang Engineering Co., Ltd.

Address before: Xiannongtan road in Shenhe District of Shenyang City, Liaoning Province, No. 12 110015

Patentee before: Shenyang Design and Research Institute, Sino-coal Engineering Group

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090527

Termination date: 20160808

CF01 Termination of patent right due to non-payment of annual fee