CN203319467U - Combination type double-layered suspension cage of construction elevator - Google Patents

Combination type double-layered suspension cage of construction elevator Download PDF

Info

Publication number
CN203319467U
CN203319467U CN201320354140XU CN201320354140U CN203319467U CN 203319467 U CN203319467 U CN 203319467U CN 201320354140X U CN201320354140X U CN 201320354140XU CN 201320354140 U CN201320354140 U CN 201320354140U CN 203319467 U CN203319467 U CN 203319467U
Authority
CN
China
Prior art keywords
cage
suspension cage
framework
layer suspension
upper strata
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320354140XU
Other languages
Chinese (zh)
Inventor
余雷
董巍巍
李本勇
陈静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Industrial Equipment Installation Co Ltd
Priority to CN201320354140XU priority Critical patent/CN203319467U/en
Application granted granted Critical
Publication of CN203319467U publication Critical patent/CN203319467U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a combination type double-layered suspension cage of a construction elevator, which structurally comprises an upper layer suspension cage and a lower layer suspension cage, wherein a hoisting ring is arranged at the top of the upper layer suspension cage;a sliding ring protruding outward is arranged at the lower part of the framework of the upper layer suspension cage; upper guide shoes are arranged at the upper parts of the framework, on two side edges of the upper layer suspension cage; lower guide shoes are arranged at the lower parts of the main framework, on two side edges of the lower layer suspension cage; a slide bar is arranged on the framework of the lower layer suspension cage, in a position corresponding to the sliding ring; the sliding ring of the upper layer suspension cage is arranged on the slide bar of the lower layer suspension cage in a sleeved manner; the upper layer suspension cage slides up and down on the inner side of the lower layer suspension cage along the slide bar through the sliding ring. A positioning pin is further arranged on the framework at the lower part of the upper layer suspension cage, and an upper positioning hole and a lower positioning hole are respectively formed in the upper part of the lower layer suspension cage and the framework at the lower part, in positions corresponding to the positioning pin respectively. The combination type double-layered suspension cage has the advantages of high operating efficiency and the like, overcomes a serious defect that an underground loading and unloading table is not required to be additionally arranged, can achieve sequential loading and unloading on the ground as that of a single-layered suspension cage, and is suitable for building construction.

Description

The double-deck cage of the combination type of building hoist
Technical field
The utility model relates to a kind of cage for building hoist, and particularly a kind of double-deck cage of merging into one deck, belong to the elevator field.
Background technology
Building hoist is again construction elevator for building or building site elevator, also can be called outdoor elevators.Be the manned cargo-carrying construction machinery and equipment often used in building, be mainly used in construction and the interior and exterior finishes of skyscraper, also can be used for the construction of the buildings such as bridge, chimney.Because its unique body structure allows the workmen take not only comfortable but also safety.General building hoist load carrying ability is at the 1-3 ton, and running velocity is 1-60m/min.
Existing building hoist only has the individual layer cage, and due to the cage limited space, the cargo quantity of each handling is less, make the handling in time of ground goods to construction floor, the goods floor area is large simultaneously, has limited personnel's timely transportation, has had a strong impact on effective work efficiency of elevator.
Summary of the invention
The purpose of this utility model is in order to overcome the ineffective weak point of existing individual layer cage, design a kind of can convert arbitrarily simple and reasonable between single, double layer, safe and convenient to use, but the double-deck cage of the combination type of the building hoist of high efficiency.
The double-deck cage of the combination type of building hoist of the present utility model, its structure comprises upper strata cage and lower floor's cage, the top of described upper strata cage is provided with suspension ring, and the bottom of upper strata cage framework is provided with outwardly directed slip ring, and the framework upper of upper strata cage dual-side is equipped with leads boots; The framework bottom of lower floor's cage dual-side is equipped with down and is led boots, be provided with slide bar with lower floor's cage framework of slip ring correspondence position, the slip ring of upper strata cage is sleeved on the slide bar of lower floor's cage, and the upper strata cage slides up and down in lower floor's cage inboard along slide bar through slip ring.
For the ease of double-deck cage is merged into to the individual layer cage, and can between single, double layer, convert arbitrarily, can have additional locating dowel pin and knock hole, described locating dowel pin is arranged on the framework of cage bottom, upper strata, and is respectively equipped with upper knock hole and lower knock hole on the framework of lower floor's cage upper and lower of locating dowel pin correspondence position.
The double-deck cage of the combination type of building hoist of the present utility model, both had advantages of double-deck cage, can overcome the critical defect that double-deck cage need to be set up underground platform again, can as the individual layer cage, can load and unload successively on the ground.Have the advantages such as simple and reasonable, safe and convenient to use, work efficiency height, the most applicable building operation is used.
The accompanying drawing explanation
Accompanying drawing 1 is a kind of structural representation of the present utility model.
In figure 1 is suspension ring, the 2nd, the upper strata cage, the 3rd, on lead boots, the 4th, slip ring, the 5th, locating dowel pin, the 6th, lower floor's cage, the 7th, upper knock hole, the 8th, slide bar, the 9th, under lead boots, the 10th, lower knock hole.
The specific embodiment
Referring to accompanying drawing 1, the double-deck cage of combination type of the present utility model, its structure mainly is comprised of upper strata cage 2 and lower floor's cage 6, and the middle level cage that also can set up similar structures according to need forms combination type multilayer cage, but further improves as the number of plies may affect efficiency too much.Below or take double-deck cage is further described as example, the top of described upper strata cage 2 is provided with suspension ring 1, the bottom of upper strata cage framework is provided with outwardly directed slip ring 4, the framework upper of upper strata cage dual-side is equipped with leads boots 3; The framework bottom of lower floor's cage dual-side is equipped with down and is led boots 9, be provided with slide bar 8 with lower floor's cage framework of slip ring 4 correspondence positions, the slip ring 4 of upper strata cage is sleeved on the slide bar 8 of lower floor's cage, and upper strata cage 2 slides up and down in lower floor's cage 6 inboards along slide bar 8 through slip ring 4.
For the ease of double-deck cage is merged into to the individual layer cage, and can between single, double layer, convert arbitrarily, can have additional locating dowel pin 5 and knock hole, described locating dowel pin 5 is arranged on the framework of upper strata cage 2 bottoms, and is respectively equipped with upper knock hole 7 and lower knock hole 10 on the framework of lower floor's cage 6 upper and lowers of locating dowel pin 5 correspondence positions.
During use, the wire halyard of elevator is arranged on the suspension ring 1 at cage top, upper strata, double-deck cage can on cage top, upper strata, lead boots 3 and lower floor's cage bottom under lead boots 9 along the building hoist lifting rail, when needs are used the individual layer cage, the locating dowel pin 5 of cage bottom, upper strata is inserted in the lower knock hole 10 of lower floor's cage and gets final product, when needs are used double-deck cage, the locating dowel pin 5 of cage bottom, upper strata is inserted in the upper knock hole 7 of lower floor's cage and gets final product, when needs at same layer when filled two-layer goods on the ground, upper strata cage 2 can be dropped in lower floor's cage 6, first the upper strata goods is installed in the cage of upper strata, shut upper strata cage door, start elevator cage bottom, upper strata is risen to lower floor's cage top, the locating dowel pin 5 of cage bottom, upper strata is inserted in the upper knock hole 7 of lower floor's cage, again lower floor's goods is installed in lower floor's cage 6, shutting lower floor's cage can rise behind the door, after being raised to setting height, can open upper strata cage door and lower floor's cage door and unload or loading to adjacent two-layer passage simultaneously, while as needs, unloading two-layer goods on the ground, after can first the goods in lower floor's cage 6 being unloaded, again upper strata cage 2 is dropped in lower floor's cage 6 and can unload the goods in the cage of upper strata.

Claims (2)

1. the double-deck cage of the combination type of a building hoist, it is characterized in that comprising upper strata cage and lower floor's cage, the top of described upper strata cage is provided with suspension ring, and the bottom of upper strata cage framework is provided with outwardly directed slip ring, and the framework upper of upper strata cage dual-side is equipped with leads boots; The framework bottom of lower floor's cage dual-side is equipped with down and is led boots, be provided with slide bar with lower floor's cage framework of slip ring correspondence position, the slip ring of upper strata cage is sleeved on the slide bar of lower floor's cage, and the upper strata cage slides up and down in lower floor's cage inboard along slide bar through slip ring.
2. the double-deck cage of the combination type of building hoist as claimed in claim 1, locating dowel pin and knock hole have been characterized by further comprising, described locating dowel pin is arranged on the framework of cage bottom, upper strata, and is respectively equipped with upper knock hole and lower knock hole on the framework of lower floor's cage upper and lower of locating dowel pin correspondence position.
CN201320354140XU 2013-06-20 2013-06-20 Combination type double-layered suspension cage of construction elevator Expired - Fee Related CN203319467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320354140XU CN203319467U (en) 2013-06-20 2013-06-20 Combination type double-layered suspension cage of construction elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320354140XU CN203319467U (en) 2013-06-20 2013-06-20 Combination type double-layered suspension cage of construction elevator

Publications (1)

Publication Number Publication Date
CN203319467U true CN203319467U (en) 2013-12-04

Family

ID=49658836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320354140XU Expired - Fee Related CN203319467U (en) 2013-06-20 2013-06-20 Combination type double-layered suspension cage of construction elevator

Country Status (1)

Country Link
CN (1) CN203319467U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106276511A (en) * 2016-08-20 2017-01-04 刘小光 Telescopic single double-deck elevator powered by switchable system
CN108275548A (en) * 2018-03-08 2018-07-13 浙江虎霸建设机械有限公司 A kind of building hoist for building
CN111252647A (en) * 2020-03-11 2020-06-09 长沙宁湖机械设备有限公司 Three-compartment double-layer stop type elevator
CN112249842A (en) * 2020-10-26 2021-01-22 中建四局第三建设有限公司 Self-lifting construction elevator cage
CN117923282A (en) * 2024-03-25 2024-04-26 山东中宏路桥建设有限公司 Multi-layer driven lifting device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106276511A (en) * 2016-08-20 2017-01-04 刘小光 Telescopic single double-deck elevator powered by switchable system
CN106276511B (en) * 2016-08-20 2018-06-29 刘小光 Telescopic single double-deck elevator powered by switchable system
CN108275548A (en) * 2018-03-08 2018-07-13 浙江虎霸建设机械有限公司 A kind of building hoist for building
CN111252647A (en) * 2020-03-11 2020-06-09 长沙宁湖机械设备有限公司 Three-compartment double-layer stop type elevator
CN112249842A (en) * 2020-10-26 2021-01-22 中建四局第三建设有限公司 Self-lifting construction elevator cage
CN112249842B (en) * 2020-10-26 2022-07-29 中建四局第三建设有限公司 Self-lifting construction elevator cage
CN117923282A (en) * 2024-03-25 2024-04-26 山东中宏路桥建设有限公司 Multi-layer driven lifting device
CN117923282B (en) * 2024-03-25 2024-05-28 山东中宏路桥建设有限公司 Multi-layer driven lifting device

Similar Documents

Publication Publication Date Title
CN203319467U (en) Combination type double-layered suspension cage of construction elevator
CN103818734B (en) A kind of Quayside container conveyer method and movement system
CN104876103B (en) Automatic folding type flap gate of construction lifter
CN205114783U (en) Hydraulic pressure fluctuation freight elevator who shows loading capacity
CN107601206A (en) A kind of fall arrest brake structure
CN203173644U (en) Multifunctional lifting shaft working platform system
CN203237895U (en) Energy-saving load vertical lifting device
CN103072877A (en) Single-well and double-car elevator
CN103395699A (en) Double-layer quay crane with vertical lifting device
CN107697233B (en) A kind of boarding ladder
CN102807178A (en) Chamfered hanging basket device with slide rail
CN207226763U (en) A kind of adjustable baggage elevator of capacity
CN205772980U (en) The dual-purpose construction elevator of portable type
CN206091457U (en) Heap parking stall
CN105460722B (en) A kind of elevator provided with collapsible barrier plate
CN203499232U (en) Attached lifting scaffold
CN203345968U (en) Tower crane
CN105084178A (en) Lifting cage for lifter
CN208265567U (en) Machine room right-angled door-opened elevator
CN203294211U (en) Multilayer type transportation carriage and transport cart provided with same
CN207293991U (en) The railway track construction for possessing lifting beam end support function is hung with just beam is traversing
CN2926399Y (en) Cargo suspending-hole structure for small warehouse
CN205998904U (en) Tower crane with lift unmanned plane airplane parking area
CN205873710U (en) Economizer system and hoist thereof
CN205855725U (en) A kind of sedan-chair top foldable guardrail

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 210023 No. 6 Wenlan Road, Xianlin University City, Qixia District, Nanjing City, Jiangsu Province

Patentee after: China Construction Installation Group Co., Ltd.

Address before: 210046 No. 9 Yaohua Menyaojia Road, Qixia District, Nanjing City, Jiangsu Province

Patentee before: China Construction Industrial Equipment Installation Co., Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204

Termination date: 20210620

CF01 Termination of patent right due to non-payment of annual fee