CN201228820Y - Movable support for installing pipe in buried sleeve pipe - Google Patents

Movable support for installing pipe in buried sleeve pipe Download PDF

Info

Publication number
CN201228820Y
CN201228820Y CNU2008201508321U CN200820150832U CN201228820Y CN 201228820 Y CN201228820 Y CN 201228820Y CN U2008201508321 U CNU2008201508321 U CN U2008201508321U CN 200820150832 U CN200820150832 U CN 200820150832U CN 201228820 Y CN201228820 Y CN 201228820Y
Authority
CN
China
Prior art keywords
inner shield
shield ring
retainer ring
sleeve pipe
hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201508321U
Other languages
Chinese (zh)
Inventor
陈阿威
管荣华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baosteel Group Corp
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CNU2008201508321U priority Critical patent/CN201228820Y/en
Application granted granted Critical
Publication of CN201228820Y publication Critical patent/CN201228820Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a movable support for mounting pipes in embedded sleeves, which comprises a clamping hoop, an inner retainer ring, wherein the clamping hoop comprises a semicircular upper clamping hoop and a semicircular lower clamping hoop, and the inner retainer ring comprises a semicircular upper inner retainer ring and a semicircular lower retainer ring. The two lateral edges of the inner circle of the upper clamping hoop and the lower clamping hoop are welded with clamping-hoop baffles, and a circle of clamping-hoop through groove is formed by the upper clamping hoop, the lower clamping hoop and the clamping-hoop baffles on the two sides, further, the lateral edges of the outer circle of the upper inner retainer ring and the lower inner retainer ring are equipped with inner retainer ring baffles, and a circle of inner retainer ring through groove is formed by the upper inner retainer ring, the lower inner retainer ring and the inner retainer ring baffles on the two sides, additionally, the inner retainer ring through groove is disposed in the clamping-hoop through groove, a plurality of roller balls are distributed in the inner retainer ring through groove, and a plurality of guide wheels are arranged at the outer circle of the lower clamping hoop. The movable support for mounting pipe in embedded sleeves which is effectively guarantees mounting quality of pipes in the embedded sleeves along with convenient operation, and simultaneously guarantees safety of both equipment and construction workers.

Description

A kind of ground sleeve pipe interior conduit installation travel(l)ing rest that buries
Technical field
The utility model relates to a kind of auxiliary device that ground sleeve pipe interior conduit is installed that buries, particularly a kind of ground sleeve pipe interior conduit installation travel(l)ing rest that buries.
Background technique
Existingly bury ground industrial gas pipeline or pipe layings such as domestic gas pipeline, rock gas; generally all be that large diameter pipeline is carried at a distance; run into geographical conditions such as building, road, rivers in laid processes, pipeline need pass through various material sleeve pipes protection is installed.Prior art bury ground sleeve pipe interior conduit erection scaffolding, the simple support of general employing supports and axially passes pipeline, but the ground sleeve pipe interior conduit that buries of prior art is installed, especially for the heavy caliber pipe-jacking engineering of deep basal pit, well head is narrow and small, the influence of high depth and push pipe length makes piping erection construction inconvenience, be difficult to pipeline effectively rotated in burying the ground sleeve pipe and move and carry out butt welding and connect, especially bury ground sleeve pipe weld seam for what adopt spiral welded pipe, influence is installed, cause support of pipelines to rotate with weld seam, not only influence welding quality, and may cause the torsional deformation of pipeline.Simultaneously in the piping erection process; need pipeline be sling by means of other lifting tool and dock; the consequence of its generation is: damage the insulating protective layer of pipeline outer wall, waste great amount of manpower and material resources and the personal safety that can not ensure the workmen in burying the ground sleeve pipe.
Summary of the invention
For addressing the above problem, the utility model provides a kind of ground sleeve pipe interior conduit installation travel(l)ing rest that buries, it is installed on the pipeline, makes pipeline realize that in burying the ground sleeve pipe circumferencial direction rotates and moves axially, be convenient to the effective butt joint of pipeline in burying the ground sleeve pipe and install.
For achieving the above object, the ground sleeve pipe interior conduit that buries of the present utility model is installed and use travel(l)ing rest, comprising: the clip that is connected and composed by bolt by semicircular front band and semicircular lower catch hoop, by semicircular inner shield ring and the semicircular inner shield ring that descends inner shield ring to connect and compose by bolt gone up; The inner ring both sides of the edge of described front band and lower catch hoop all are welded with the clip baffle plate, and the clip baffle plate of described front band and lower catch hoop and both sides forms a circle clip groove; Described both sides of the edge, outer ring of going up inner shield ring and following inner shield ring all are welded with the inner shield ring baffle plate, and the described inner shield ring baffle plate of going up inner shield ring and following inner shield ring and both sides forms a circle inner shield ring groove; Described inner shield ring groove places described clip groove, is evenly distributed with a plurality of balls in the described inner shield ring groove; The outer ring of described lower catch hoop is provided with a plurality of guide wheels.
In the middle of the described ball bearing pin is arranged, described bearing pin two ends are separately fixed on the inner shield ring baffle plate of described inner shield ring both sides.
The described inner ring of going up inner shield ring and following inner shield ring is stained with rubber cover.
Described guide wheel is fixed on the outer ring of described lower catch hoop by height-adjustable support.
The ground sleeve pipe interior conduit installation travel(l)ing rest that buries of the present utility model, pipeline is moved axially easily with circumferencial direction in burying the ground sleeve pipe to rotate, guarantee the installation quality of pipeline in burying the ground sleeve pipe effectively, and it is easy to operate, save manpower and materials, ensured equipment and workmen's safety simultaneously.
Description of drawings
Fig. 1 installs the structural representation of using travel(l)ing rest for the ground sleeve pipe interior conduit that buries of the present utility model;
Fig. 2 uses the A-A of travel(l)ing rest to sectional view for burying ground sleeve pipe interior conduit installation among Fig. 1;
Fig. 3 installs the assembling decomposing schematic representation of using travel(l)ing rest for the ground sleeve pipe interior conduit that buries of the present utility model;
Fig. 4 for of the present utility model bury ground sleeve pipe interior conduit install with travel(l)ing rest be used for piping erection the time schematic representation.
Embodiment
Fig. 1 installs the structural representation of using travel(l)ing rest for the ground sleeve pipe interior conduit that buries of the present utility model; Fig. 2 uses the A-A of travel(l)ing rest to sectional view for burying ground sleeve pipe interior conduit installation among Fig. 1; Fig. 3 installs the assembling decomposing schematic representation of using travel(l)ing rest for the ground sleeve pipe interior conduit that buries of the present utility model.As shown in the figure, the ground sleeve pipe interior conduit that buries of the present utility model is installed and is comprised with travel(l)ing rest: the clip that is connected and composed by bolt by semicircular front band 1a and semicircular lower catch hoop 1b, the inner shield ring that is connected and composed by bolt by semicircular inner shield ring 4a of going up and semicircular inner shield ring 4b down, the inner ring both sides of the edge of described front band 1a and lower catch hoop 1b all are welded with clip baffle plate 2a, 2b, and clip baffle plate 2a, the 2b of described front band 1a and lower catch hoop 1b and both sides forms a circle clip groove 11; Described both sides of the edge, outer ring of going up inner shield ring 4a and following inner shield ring 4b all are welded with inner shield ring baffle plate 3a, 3b, inner shield ring baffle plate 3a, the 3b of described inner shield ring 4a of going up and following inner shield ring 4b and both sides forms a circle inner shield ring groove 41, and described inner shield ring groove 41 places clip groove 11; Be evenly distributed with a plurality of balls 5 in the described inner shield ring groove 41, the bearing pin two ends in the middle of the described ball 5 are fixed on inner shield ring baffle plate 3a, the 3b of both sides; The outer ring of described lower catch hoop 1b is provided with a plurality of guide wheels 7.
The effect of clip groove 11 is that the roller 5 in the guiding inner shield ring groove 41 steadily moves, and roller 5 is embedded in the clip groove 11 when work, makes inner shield ring relatively more suitable sliding when clip rotates when pipeline 10 rotates.Thereby guarantee that pipeline 10 can successfully rotate along its circumferencial direction, finish the installation requirement of the welding of large diameter pipeline, also can prevent the distortion that is distorted in the piping erection process simultaneously.
The described inner ring of inner shield ring 4a, 4b up and down is stained with rubber cover 6a, 6b, is used to protect the anti-rot protection material of pipeline 10 outer walls not to be damaged.
The ground sleeve pipe interior conduit that buries of the present utility model is installed the outer ring that is installed in pipeline 10 with travel(l)ing rest, as shown in Figure 3.Fig. 4 for of the present utility model bury ground sleeve pipe interior conduit install with travel(l)ing rest be used for piping erection the time schematic representation.Of the present utility model bury ground sleeve pipe interior conduit install be installed in the outer ring of pipeline 10 with travel(l)ing rest after, can enter smoothly and bury in the ground sleeve pipe 20.Described guide wheel 7 is fixed on the outer ring of described lower catch hoop 1b by height-adjustable support, is used to regulate the height of guide wheel 7, and purpose is the vertical height of regulating pipeline 10, guarantees effective welding of pipeline 10.Preferably 3 of the quantity of described guide wheel 7, the i.e. secondary guide wheel of the capstan under being positioned at shown in the figure and its both sides.The effect of guide wheel 7 is that pipeline 10 is axially moved in burying ground sleeve pipe 20, and the secondary guide wheel of both sides can play auxiliary effect of stablizing pipeline 10 simultaneously.When install to need adjusting substantially horizontal and/or when vertical, guide wheel 7 is along the horizontal position that moves axially can regulate pipeline 10 that buries ground sleeve pipe 20, the vertical height of the adjusting can regulate pipeline 10 of guide wheel 7 height.

Claims (5)

1, a kind of ground sleeve pipe interior conduit installation travel(l)ing rest that buries, it is characterized in that, comprising: the clip that connects and composes by bolt by semicircular front band and semicircular lower catch hoop, go up the inner shield ring that inner shield ring and semicircular inner shield ring down connect and compose by bolt by semicircular;
The inner ring both sides of the edge of described front band and lower catch hoop all are welded with the clip baffle plate, and the clip baffle plate of described front band and lower catch hoop and both sides forms a circle clip groove;
Described both sides of the edge, outer ring of going up inner shield ring and following inner shield ring all are welded with the inner shield ring baffle plate, and the described inner shield ring baffle plate of going up inner shield ring and following inner shield ring and both sides forms a circle inner shield ring groove;
Described inner shield ring groove places described clip groove, is evenly distributed with a plurality of balls in the described inner shield ring groove;
The outer ring of described lower catch hoop is provided with a plurality of guide wheels.
2, the ground sleeve pipe interior conduit that buries as claimed in claim 1 is installed and use travel(l)ing rest, it is characterized in that there is bearing pin described ball centre, and described bearing pin two ends are separately fixed on the inner shield ring baffle plate of described inner shield ring both sides.
3, the ground sleeve pipe interior conduit that buries as claimed in claim 1 is installed and use travel(l)ing rest, it is characterized in that the described inner ring of going up inner shield ring and following inner shield ring is stained with rubber cover.
4, the ground sleeve pipe interior conduit that buries as claimed in claim 1 is installed and is used travel(l)ing rest, it is characterized in that described guide wheel is fixed on the outer ring of described lower catch hoop by height-adjustable support.
5, the ground sleeve pipe interior conduit that buries as claimed in claim 4 is installed and is used travel(l)ing rest, it is characterized in that the quantity of described guide wheel is 3.
CNU2008201508321U 2008-07-15 2008-07-15 Movable support for installing pipe in buried sleeve pipe Expired - Lifetime CN201228820Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201508321U CN201228820Y (en) 2008-07-15 2008-07-15 Movable support for installing pipe in buried sleeve pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201508321U CN201228820Y (en) 2008-07-15 2008-07-15 Movable support for installing pipe in buried sleeve pipe

Publications (1)

Publication Number Publication Date
CN201228820Y true CN201228820Y (en) 2009-04-29

Family

ID=40633771

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201508321U Expired - Lifetime CN201228820Y (en) 2008-07-15 2008-07-15 Movable support for installing pipe in buried sleeve pipe

Country Status (1)

Country Link
CN (1) CN201228820Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103286747A (en) * 2011-12-21 2013-09-11 罗伯特·博世有限公司 Tool hanger
CN104810763A (en) * 2015-03-31 2015-07-29 太仓市晨洲塑业有限公司 Multifunctional cable protection pipe
CN105598664A (en) * 2015-11-16 2016-05-25 上海海隆复合钢管制造有限公司 Bimetal compound steel pipe assembling device and method
CN115055476A (en) * 2022-07-08 2022-09-16 杭州航民百泰首饰有限公司 Gold powder recovery water tower filter equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103286747A (en) * 2011-12-21 2013-09-11 罗伯特·博世有限公司 Tool hanger
CN103286747B (en) * 2011-12-21 2017-01-18 罗伯特·博世有限公司 tool hanger
CN104810763A (en) * 2015-03-31 2015-07-29 太仓市晨洲塑业有限公司 Multifunctional cable protection pipe
CN105598664A (en) * 2015-11-16 2016-05-25 上海海隆复合钢管制造有限公司 Bimetal compound steel pipe assembling device and method
CN105598664B (en) * 2015-11-16 2018-03-27 上海海隆复合钢管制造有限公司 A kind of dual-metal clad steel pipe assembling device and dual-metal clad steel pipe assembly method
CN115055476A (en) * 2022-07-08 2022-09-16 杭州航民百泰首饰有限公司 Gold powder recovery water tower filter equipment
CN115055476B (en) * 2022-07-08 2023-08-11 杭州航民百泰首饰有限公司 Gold powder recovery water tower filter equipment

Similar Documents

Publication Publication Date Title
CN201424941Y (en) Device for airtight starting and reaching of shield machine
CN201228820Y (en) Movable support for installing pipe in buried sleeve pipe
CN204917742U (en) Portable portal crane is used in piping erection
CN201145098Y (en) Movable device in buried sleeve
CN108223912A (en) Underground space piping lane pipeline mounting construction method
CN104195948A (en) Bridge hanging pipeline pushing installation and construction method
CN112878460B (en) Construction method for steel pipe built in reinforced concrete sleeve
CN104711930A (en) Installation and construction method for large-diameter pipe bridge on ultra-wide river way
CN210661644U (en) Pipe jacking hat brim device
WO2015158074A1 (en) Construction method for connection and replacement of underground water-supply fiber-reinforced plastic mortar pipe and steel pipe
CN209163819U (en) A kind of working top iron of soil pressing balance pipe jacking machine
CN203905598U (en) Steel sleeve chimney
CN206647683U (en) The buffer unit of petroleum pipeline bending place impulsive force can be reduced
CN201014060Y (en) Device used for movable supporting pipeline in casing tube
CN212297912U (en) Reinforcing structure for outlet of pipe jacking receiving well
CN206231959U (en) Lift pipe level conveying arrangement in situ in a kind of pipe gallery
CN212223029U (en) Blast furnace down pipe spraying construction device
CN210129717U (en) Firewall cable wall-penetrating protective sleeve fixing device for comprehensive pipe rack
CN210280097U (en) Movable oil tank cleaning and ventilating device
CN110306420B (en) Pipe transportation device in pipe bridge and construction method thereof
CN102392550A (en) Reverse installation method for flue gas desulfurization and absorption tower
KR101439334B1 (en) Construction machinery for pipe and constrution method
CN207888030U (en) A kind of steel pipe cutting device
CN106219404A (en) Blast furnace refractory brick construction circular crane
CN202595751U (en) Elephant trunk riprapping vehicle for immersed tube foundation construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BAOGANG GROUP CO., LTD.

Free format text: FORMER OWNER: BAOSHAN IRON + STEEL CO., LTD.

Effective date: 20121231

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201900 BAOSHAN, SHANGHAI TO: 200122 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20121231

Address after: 200122 No. 370 Pu circuit, Shanghai, Pudong New Area

Patentee after: Baosteel Group Corporation

Address before: 201900 Fujin Road, Shanghai, orchard, Baoshan District

Patentee before: Baoshan Iron & Steel Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20090429

CX01 Expiry of patent term