CN201227688Y - Xuantai brick for molten steel tank - Google Patents
Xuantai brick for molten steel tank Download PDFInfo
- Publication number
- CN201227688Y CN201227688Y CNU2008200137343U CN200820013734U CN201227688Y CN 201227688 Y CN201227688 Y CN 201227688Y CN U2008200137343 U CNU2008200137343 U CN U2008200137343U CN 200820013734 U CN200820013734 U CN 200820013734U CN 201227688 Y CN201227688 Y CN 201227688Y
- Authority
- CN
- China
- Prior art keywords
- brick
- shoe last
- arc
- hat block
- block tire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to a block fetus brick of a molten steel ladel. The brick is characterized in that the front end shape is an arc-shaped protrusion and the back end shape is an arc-shaped concave bow; an arc-shaped groove is formed on the front side; at least one lug boss is arranged on the back side; the upper surface is coated with a barrier coat. The front protruded arch of a back brick is embedded in the back concave arch of a front brick; a radian of the brick can be adjusted according to the deformation degree of a molten steel ladle casing so that the two bricks can fit together perfectly; the lug boss arranged on the lower surface of an upper brick is embedded in the arc-shaped groove formed on the upper surface of a lower brick so that transplacement between the upper brick and the lower brick can be avoided and the collapse problem of the lower brick course can be solved. Furthermore, the barrier coat perform the function of separating the bricks and permanently lining pouring materials and avoiding the defects, such as an interlining, a rippled surface, unevenness, a pouring gap, and the like, which are caused by the wrinkles of a plastic cloth.
Description
Technical field
The utility model belongs to steel-making and use fire resisting material field, particularly a kind ofly is used to build by laying bricks or stones or pours into a mould the employed novel shoe last or hat block tire brick of molten steel jar permanent layer of tiing a knot.
Background technology
The cast permanent layer is that steel mill molten steel jar is reorganized and outfit one of requisite operation in the process.The poor quality of permanent layer cast not only influences building by laying bricks or stones of working lining, also stays great potential safety hazard for the molten steel jar simultaneously.At present, unitary mould is just reorganized and outfit on the technology at the molten steel jar of minority steel mill and is used, and it requires the molten steel jar deflection must be very little, and most steel mill molten steel jar to reorganize and outfit technology all be to adopt the method for building shoe last or hat block tire brick knotting permanent layer by laying bricks or stones.Existing shoe last or hat block tire brick is generally made according to the operational layer brick type, because the molten steel tank skin uses the back distortion to occur for a long time, can not guarantee after building by laying bricks or stones that adjacent two seam outer walls are smooth seamless between the same brick layer, it is less to be difficult to when building by laying bricks or stones simultaneously guarantee misplace between the brick layer up and down, and permanent liner surface, cast back is rough and uneven in surface.
Along with improving constantly of permanent layer material class, density of material progressively increases, when being poured into molten steel jar top, because the impact of bottom brick layer vibrating head vibration when being difficult to bear the static pressure of molten steel and cast, the avalanche phenomenon very easily occurs, cause that all that has been achieved is spoiled and the cast failure.For the material for permanent liner in pouring after preventing to toast sticks on the shoe last or hat block tire brick, before the cast need the shoe last or hat block tire brick outer wall that lays with water the material feeding contact site and lay Polypropylence Sheet.Because the permanent liner of cast is thinner, the slit is less, therefore lays difficulty of Polypropylence Sheet, be easy to occur wrinkle, be difficult to Polypropylence Sheet is laid smooth, thereby cause the permanent liner after the cast to produce defectives such as interlayer, pipe, uneven and cast space, the serious cast again of must dismantling.
Summary of the invention
The purpose of this utility model provides a kind of novel shoe last or hat block tire brick, and defectives such as the permanent liner surface interlayer that occurs when fundamentally solving knotting molten steel jar permanent liner, pipe, uneven, cast space prevent shoe last or hat block tire brick avalanche problem in the casting process.For this reason, technical solution adopted in the utility model is:
A kind of molten steel jar shoe last or hat block tire brick is characterized in that shoe last or hat block tire brick front end is shaped as circular-arc protrusion, and the rear end is shaped as circular-arc recessed; The leading flank of brick has arc groove, and trailing flank is provided with at least one boss.
The recessed arc radius in the circular arc that described shoe last or hat block tire brick front end protrudes and rear end is identical.
Upper surface at shoe last or hat block tire brick scribbles barrier coat.Barrier coat can adopt common paint, high temperature resistant paint, graphite and water-repellent paint etc. not with the material of material for permanent liner in pouring generation chemical reaction.
Center of arc's point of shoe last or hat block tire brick leading flank arc groove overlaps with center of arc's point of shoe last or hat block tire brick upper surface arc.
The summit of shoe last or hat block tire brick trailing flank boss and corresponding being on the same cross section of bottom land of leading flank arc groove.
The boss of shoe last or hat block tire brick trailing flank is round, oval platform or bucking ladder.
The width of described arc groove is greater than the maximum gauge or the width 1~3mm of boss.
The enforcement the beneficial effects of the utility model are:
Because the shoe last or hat block tire brick brick shape of the utility model is reasonable in design, simple and practical, therefore in building construction, need only adjacent two shoe last or hat block tire brick tails are joined, the anterior arc that protrudes of the shoe last or hat block tire brick in back just is embedded in the recessed arc in last rear portion just, and can adjust the radian of shoe last or hat block tire brick according to the deformation extent of molten steel ladle bowl, two bricks are fitted together perfectly, can not produce the slit.Between levels, the boss of upper strata shoe last or hat block tire brick lower surface is embedded in the arc groove of lower floor's shoe last or hat block tire brick upper surface just, has avoided in the building process problem of brick fault position up and down; Solved when watering steel the avalanche problem that bottom brick layer occurs simultaneously to molten steel jar top.Substituted Polypropylence Sheet with barrier coat, both played the effect of isolating shoe last or hat block tire brick and material for permanent liner in pouring, the permanent liner of having avoided again causing owing to the Polypropylence Sheet wrinkle produces defectives such as interlayer, pipe, uneven and cast space.
Description of drawings
Fig. 1 is a molten steel jar shoe last or hat block tire brick working face schematic diagram.
Fig. 2 is the left view of Fig. 1.
Among the figure: 1 is barrier coat, and 2 is boss, and 3 is arc groove, and 4 is circular-arc recessed, and 5 is circular-arc protrusion.
The specific embodiment
Below, in conjunction with the accompanying drawings the utility model is specified.
As seen from Figure 1, the design feature of the utility model molten steel jar shoe last or hat block tire brick is: the head of shoe last or hat block tire brick is that front end is shaped as a circular-arc protrusion 5, and the afterbody of shoe last or hat block tire brick is that the rear end shape is circular-arc recessed 4.The leading flank of brick is working face in fact, laterally have together slightly arc and traverse the arc groove 3 at two ends at last working face, the trailing flank of the brick corresponding with arc groove 3 is that the following working face of shoe last or hat block tire brick is provided with two boss 2, and two roundlets that dotted line is represented among Fig. 1 promptly are.Can be more clearly visible the shape and the setting of boss 2 and arc groove 3 by Fig. 2.Simultaneously, promptly with on the outer surface that material for permanent liner in pouring contacts also scribble barrier coat 1 at the upper surface of shoe last or hat block tire brick.For preventing adhesion, barrier coat 1 adopts is not advisable with the material of material for permanent liner in pouring generation chemical reaction, selects water-repellent paint for use; Also can adopt common paint, high temperature resistant paint or graphite.
According to the needs of result of use, require the circular arc of shoe last or hat block tire brick nose circle arcuation protrusion 5 identical, so that it the slit can not occur after building by laying bricks or stones with circular-arc recessed 4 the arc radius in rear end; And after suitably adjusting angle, also can reach substantially and fit together perfectly.Upper surface that shoe last or hat block tire brick scribbles barrier coat 1 is a radian slightly, and designing requirement, center of arc's point of working face arc groove 3 should overlap with center of arc's point of shoe last or hat block tire brick arc on the shoe last or hat block tire brick; Corresponding being on the same cross section of bottom land of the summit of working face boss 2 and last working face arc groove 3 under the shoe last or hat block tire brick mainly is to guarantee to build the back by laying bricks or stones both can be embedded in together just.Boss is selected the frustum of a cone for use, also can adopt oval frustum or bucking ladder.For making both accurately locate and prevent vertical misalignment, the width of arc groove 3 should be slightly larger than the maximum gauge or the width of boss 2, generally is advisable with interior at 3mm.
Claims (7)
1, a kind of molten steel jar shoe last or hat block tire brick is characterized in that, described shoe last or hat block tire brick front end is shaped as circular-arc protrusion, and the rear end is shaped as circular-arc recessed; The leading flank of brick has arc groove, and trailing flank is provided with at least one boss.
2, molten steel jar shoe last or hat block tire brick according to claim 1 is characterized in that, the recessed arc radius in the circular arc that described shoe last or hat block tire brick front end protrudes and rear end is identical.
3, molten steel jar shoe last or hat block tire brick according to claim 1 is characterized in that, scribbles the barrier coat of common paint, high temperature resistant paint, graphite or water-repellent paint formation at the upper surface of shoe last or hat block tire brick.
4, molten steel jar shoe last or hat block tire brick according to claim 1 is characterized in that, center of arc's point of shoe last or hat block tire brick leading flank arc groove overlaps with center of arc's point of shoe last or hat block tire brick upper surface arc.
5, molten steel jar shoe last or hat block tire brick according to claim 1 is characterized in that, the summit of shoe last or hat block tire brick trailing flank boss and corresponding being on the same cross section of bottom land of leading flank arc groove.
6, molten steel jar shoe last or hat block tire brick according to claim 1 is characterized in that, the boss of shoe last or hat block tire brick trailing flank is round, oval platform or bucking ladder.
7, molten steel jar shoe last or hat block tire brick according to claim 1 is characterized in that the width of described arc groove is greater than the maximum gauge or the width 1~3mm of boss.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200137343U CN201227688Y (en) | 2008-06-30 | 2008-06-30 | Xuantai brick for molten steel tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200137343U CN201227688Y (en) | 2008-06-30 | 2008-06-30 | Xuantai brick for molten steel tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201227688Y true CN201227688Y (en) | 2009-04-29 |
Family
ID=40632650
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200137343U Expired - Fee Related CN201227688Y (en) | 2008-06-30 | 2008-06-30 | Xuantai brick for molten steel tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201227688Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103252487A (en) * | 2013-05-27 | 2013-08-21 | 德清县钢友耐火材料有限公司 | Novel steel ladle |
CN103252488A (en) * | 2013-05-27 | 2013-08-21 | 德清县钢友耐火材料有限公司 | Novel steel ladle permanent layer high-alumina brick |
-
2008
- 2008-06-30 CN CNU2008200137343U patent/CN201227688Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103252487A (en) * | 2013-05-27 | 2013-08-21 | 德清县钢友耐火材料有限公司 | Novel steel ladle |
CN103252488A (en) * | 2013-05-27 | 2013-08-21 | 德清县钢友耐火材料有限公司 | Novel steel ladle permanent layer high-alumina brick |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101579726B (en) | Compound spoil-retaining wall with holes for tundish and preparation process thereof | |
CN106041045A (en) | Continuous casting tundish diffuse-type gas-permeable ring upper nozzle brick cup and argon blowing refining method thereof | |
CN201588207U (en) | Concreting device at construction joints | |
CN203917892U (en) | Long-life tundish | |
CN101898242A (en) | Masonry method of permanent ladle layer by using magnesia carbon bricks | |
CN206135341U (en) | Concrete combined slab dedicated line box | |
CN201227688Y (en) | Xuantai brick for molten steel tank | |
CN111644608B (en) | Tundish water feeding port structure and mounting method thereof | |
CN104264700A (en) | Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction | |
CN101683690A (en) | Method for constructing bottom of ladle | |
CN103628575A (en) | Large-altitude-difference variable-section concrete structure construction joint and construction method thereof | |
CN105436495A (en) | Tundish and tundish water gap impervious steel installing method | |
CN104722746B (en) | A kind of slab CC tundish working lining and preparation method thereof | |
CN206308694U (en) | A kind of antiseep and Bar Anchorage anti-float anchor rod | |
CN108543940A (en) | A kind of molten steel pot of non-bonnet (NB) plate is along masonry construction and construction method | |
CN106041044A (en) | Continuous casting tundish breathable ceramic tube upper nozzle brick cup and argon blowing refining method thereof | |
CN208328901U (en) | A kind of civil engineering reinforcement stake | |
CN201455216U (en) | Composite dreg retaining wall with holes for tundish | |
CN110439592A (en) | Shield tunnel two serves as a contrast concrete structure and construction method | |
CN207348280U (en) | A kind of novel precast floor slab | |
CN201960126U (en) | Built-in air-permeable brick formed by blowing argon at bottom of steel ladle | |
CN204080744U (en) | Face Slab of Concrete-faced Rockfill support is by formula caulking machine | |
CN204504207U (en) | A kind of slab CC tundish working lining | |
CN218503334U (en) | Lining heat insulation device for casting high manganese steel frog pouring ladle | |
CN207775725U (en) | A kind of special disposable light filling composite core mould of bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090429 Termination date: 20140630 |
|
EXPY | Termination of patent right or utility model |