CN201225344Y CNU2008200586516U CN200820058651U CN201225344Y CN 201225344 Y CN201225344 Y CN 201225344Y CN U2008200586516 U CNU2008200586516 U CN U2008200586516U CN 200820058651 U CN200820058651 U CN 200820058651U CN 201225344 Y CN201225344 Y CN 201225344Y
Authority
CN
China
Prior art keywords
valve
oil
control valve
jack
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200586516U
Other languages
Chinese (zh)
Inventor
顾国明
唐建飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CNU2008200586516U priority Critical patent/CN201225344Y/en
Application granted granted Critical
Publication of CN201225344Y publication Critical patent/CN201225344Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Fluid-Pressure Circuits (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The utility model provides a creeping and raising synchronizing control system in building operations, which comprises an oil tank, an oil pump, a motor, a transportation pipeline system, two cylinder raising mechanisms and a synchronizing control device, wherein the transportation pipeline system comprises an oil suction branch pipeline, an oil return branch pipeline and an electromagnetic directional valve; and each cylinder raising mechanism comprises a jack, a pilot operated check valve and an on-off three-way control valve. The utility model is characterized in that the creeping and raising synchronizing control system also comprises a synchronizing control device which is arranged between the transportation pipeline system and the two cylinder raising mechanisms and is composed of a synchronizing valve and a one-way governing valve. The creeping and raising synchronizing control system can better solve the problems of different kinematic velocities and desynchrony of raising mechanisms of the prior creeping framework system, realizes automatic control of the falling speed, and ensures the stable and synchronous falling.

Description

Construction creeping formwork jacking synchronous control system
Technical field
The utility model relates to hydraulic synchronous control system, relates in particular to the jacking synchronous control system of creeping formwork in the construction such as high-level structure core concrete, large bridge king-tower.
Background technique
China once mainly relied on import equipment in used hydraulic climbing formwork systems such as construction high level, superelevation layer, tall and slender structure core concrete, large bridge king-towers.But since the cost costliness, the domestic product that also begins to research and develop oneself.Shortcomings such as there is complex structure in domestic present technology, and function is perfect inadequately, and operation inconvenience and work rate are low.
Climbing form system operated by rotary motion two covers or two cover above jacking seats in the plane (oil cylinder lifting body), load in the system is not quite similar on each position, the resistance that is overcome when therefore can work owing to jacking in each jacking seat in the plane (oil cylinder lifting body) of climbing form system is different to cause that each jacking seat in the plane (oil cylinder lifting body) movement velocity speed differs, cumulative error will make climbing form system jam gently then occur, the work of can not normally climbing; Heavy then damage mechanism's component of climbing form system, engineering construction is caused very big influence.In order to solve the problem of synchronization lifting, domestic similar products mainly rely on regular inspection of the stacking of equipment, material on the strict control climbing form system and operator and regular manual setting deviation, this manual type not only limited climbing form system function of use, increased the weight of operator's working strength, also technical solution problem fundamentally not.External some company's appliance computer adds intelligent means such as sensor and carries out synchronization control, but has high input because of equipment eventually, system complex, and it is high that operation requires, and safeguards also difficulty, can not widely be accepted by domestic enterprise.
The model utility content
The utility model technical issues that need to address be to provide a kind of can simplied system structure and can realize the construction creeping formwork jacking synchronous control system of automation synchronization control lifting.
In order to solve the problems of the technologies described above, the utility model has adopted following technological means:
A kind of construction creeping formwork jacking synchronous control system, comprise fuel tank, oil pump, motor, transfer conduit system and two cover oil cylinder lifting bodies, described transfer conduit system comprises the oil suction branch road, oil return branch road and solenoid directional control valve, described every cover oil cylinder lifting body comprises jack, Pilot operated check valve and two-bit triplet control valve, described jack has rodless cavity and rod chamber, described jacking synchronous control system also comprises the sync control device of being located between described transfer conduit system and the two cover oil cylinder lifting bodies, at oil cylinder lifting body ascent stage, the driven by motor oil pump with hydraulic oil from the oil suction branch road of fuel tank through the transfer conduit system, solenoid directional control valve, arrive the jack rodless cavity of oil cylinder lifting body again through sync control device, oil return is then flowed back to fuel tank from the jack rod chamber through solenoid directional control valve and oil return branch road; In the oil cylinder lifting body decline stage, the driven by motor oil pump directly arrives hydraulic oil the jack rod chamber of oil cylinder lifting body and rodless cavity fluid is flowed out through the transfer conduit system from fuel tank, gets back to fuel tank through solenoid directional control valve, the oil return branch road of transfer conduit system again.
In above-mentioned construction creeping formwork jacking synchronous control system, described sync control device comprises synchronous valve and unidirectional series flow control valve, a port of described synchronous valve links to each other with an end of unidirectional series flow control valve, two ports are connected with the two-bit triplet control valve of oil cylinder lifting body by a control valve respectively in addition, and the other end of described unidirectional series flow control valve is connected with described solenoid directional control valve.Described unidirectional series flow control valve carries the unidirectional return line of a parallel connection.
In above-mentioned construction creeping formwork jacking synchronous control system, the two-bit triplet control valve of described every cover oil cylinder lifting body has a port that links to each other with sync control device, a port that links to each other with corresponding jack and a port that links to each other with solenoid directional control valve; Under the "on" position, port that links to each other with sync control device and the port conducting that links to each other with jack, under the power failure state, port that links to each other with sync control device and the port conducting that links to each other with solenoid directional control valve.
In above-mentioned construction creeping formwork jacking synchronous control system, be provided with oil suction filter and oil sucting one-way valve in turn from oil pump one end on the described oil suction branch road; Be provided with return check valve and return filter in turn from solenoid directional control valve one end on the described oil return branch road.Further, described solenoid directional control valve is a 3-position 4-way H type valve, and two port is communicated with oil sucting one-way valve output terminal and return check valve input end respectively, and two ports link to each other with the jack rod chamber of sync control device and oil cylinder lifting body respectively in addition.
In above-mentioned construction creeping formwork jacking synchronous control system, described return check valve two ends reverse parallel connection one Fill valve, the pressure relief valve of also connecting between described oil sucting one-way valve and the return check valve.
In above-mentioned construction creeping formwork jacking synchronous control system, one end of described Pilot operated check valve links to each other with the two-bit triplet control valve by oil pipe, the other end links to each other with the jack rodless cavity, described Pilot operated check valve also has a pipeline that leads to the jack rod chamber, this pipeline a little is the remote control mouth with communicating of rod chamber, and remote control mouth place is provided with damper, produces the fluid impact endurance test shock to prevent climbing form system in the cylinder process that contracts from normally climbing under the effect of heavy load.
In above-mentioned construction creeping formwork jacking synchronous control system, described two-bit triplet control valve is a ball-valve structure.
The beneficial effects of the utility model are, the selection of each valve is used and special Placement in oil cylinder lifting body, transfer conduit system and the sync control device, the realm of building construction that has not only overcome domestic high level, superelevation layer, tall and slender structure core concrete, large bridge king-tower etc. the difficult problem of form frame system synchronization lifting of climbing, also external simultaneously same category of device have that system is simple, Operation and Maintenance is easy and lower-cost advantage.
Description of drawings
Fig. 1 is the structural representation of the construction creeping formwork jacking synchronous control system of the utility model specific embodiment.
Embodiment
Below with reference to accompanying drawing construction creeping formwork jacking synchronous control system of the present utility model is described in further detail, is specially following mode of execution:
As shown in Figure 1, present embodiment is the construction creeping formwork jacking synchronous control system of two cover oil cylinder lifting bodies (corresponding two jacking seats in the plane), this system comprises fuel tank 7, oil pump 8, motor 9, transfer conduit system, two cover oil cylinder lifting bodies, and a synchronous control gear.This transfer conduit system comprises oil suction branch road L1, oil return branch road L2 and solenoid directional control valve 17, every cover oil cylinder lifting body comprises jack 18, Pilot operated check valve 2 and two-bit triplet control valve 4, and this jack 18 has rodless cavity (epicoele) and rod chamber (cavity of resorption).This sync control device is in series by synchronous valve 5 and unidirectional series flow control valve 6.
Two oil cylinder lifting bodies are installed on the mould bases support mechanism 1, jack 18, Pilot operated check valve 2 and two-bit triplet control valve 4 connect and compose the oil inlet passage of oil cylinder lifting body successively, high pressure hose 3 is arranged between Pilot operated check valve 2 and the two-bit triplet control valve 4, and (between jack 18 and the solenoid directional control valve 17) also is provided with a high pressure hose on the oil discharge passage of oil cylinder lifting body.The action of each oil cylinder is all controlled by this two-bit triplet control valve 4, concrete, this two-bit triplet control valve 4 is ball-valve structures, it has a port X who links to each other with sync control device, a port Y who links to each other with corresponding jack 18 and a port Z who links to each other with solenoid directional control valve 17, under the "on" position, X port and the conducting of Y port, under the power failure state, X port and the conducting of Z port.This two-bit triplet control valve 4 is used to control the break-make of fluid, selects for use ball valve that the response frequency raising of valve, leakage rate were prolonged near zero, life-span.Each two-bit triplet control valve 4 all adopts modular design, and volume is little, easy for installation.This Pilot operated check valve 2 can be realized the hydraulic lock function, when hydraulic pipe line runs into unexpected damaged the leakage, oil cylinder still can support weight, guarantee the Security of synchronization of jacking up, Pilot operated check valve 2 in addition can be with carrying a function of changing flexible pipe 3 when load support simultaneously, this Pilot operated check valve 2 is a ball-valve structure, and pilot operated, hydraulic pressure directly moves, and leaks almost nil.Select 10 tons (during 200bar) of carrying for use, range is the oil cylinder of 250mm.
Oil suction branch road L1 is provided with oil suction filter 13, its inlet connects oil pump 8, and outlet is connected with the P end of oil sucting one-way valve 14 and solenoid directional control valve 17 successively, and oil return branch road L2 is provided with return filter 10, it exports connected tank 7, and inlet is connected to the R end of solenoid directional control valve 17 by return check valve 12.This solenoid directional control valve 17 is 3-position 4-way H type solenoid directional control valves, its output terminal B end and A end are connected to jack 18 rod chambers of oil cylinder lifting body and the unidirectional series flow control valve 6 in the sync control device respectively, in addition, also be parallel with a pressure relief valve 16 between the P of solenoid directional control valve 17 end and the R end.Return check valve 12 cracking pressures are set in 3.5bar, make system pipeline be full of oil all the time, prevent sneaking into of air, improve the speed of response of system and carry out precision.Fill valve 11 is in parallel with return check valve 12, when a certain oil cylinder pauses because of a variety of causes, but the form frame system that climbs works on because of the jacking of other oil cylinders, the oil cylinder that the steel mould base of jacking can drive pause works on, promptly the action of oil cylinder piston must need hydraulic oil to replenish at this moment, otherwise will cause to vacuumize and damage pipeline and equipment, so, this repairing oil suction system designed on the pipeline cleverly.System pressure safety valve 16 front ends are provided with pressure gauge 15, and by regulating the working pressure that pressure relief valve 16 (relief valve) can initialization system, when because load variations when causing overpressure, system's automatic overflow is guaranteed the safety of each workpiece of system.Oil suction, return filter 10,13 have cleanliness of hydraulic oil self check sender function, to guarantee the cleaning of fluid.
At two oil cylinder lifting bodies, in sync control device, select synchronous valve 5 for use, the control end of the two-bit triplet control valve 4 of each oil cylinder lifting body all is connected with synchronous valve 5, rising or falling speed information and the instruction of fluid break-make are all by the guide line transmission, so the synchronization control of system relies on automatic adjusting of internal mechanism of synchronous valve 5 to finish fully.Synchronous valve 5 front ends are connected with the unidirectional series flow control valve 6 of highi degree of accuracy, can adjust different speed as required, and creeping formwork is climbed according to friction speed.Unidirectional series flow control valve 6 the other ends are connected with the A port of solenoid directional control valve 17, and in addition, this unidirectional series flow control valve 6 carries the unidirectional return line 19 of a parallel connection.When jacking needs speed governing, can regulate unidirectional series flow control valve 6 and obtain the jacking speed that needs, hydraulic oil enters unidirectional series flow control valve 6 by the A of solenoid directional control valve 17 end and flows to synchronous valve 5 again, finish a jacking, when oil cylinder need be withdrawn,, do not allow hydraulic oil pass through the speed governing end of unidirectional series flow control valve 6 during the oil cylinder withdrawal in order to increase work efficiency, but directly allow hydraulic oil flow back to, thereby fully improve the working efficiency of system through unidirectional return line 19.
In oil cylinder lifting body uphill process, motor 9 and oil pump 8 are supplied with hydraulic oil, process oil suction filter 13 and solenoid directional control valve 17 and sync control device enter jack 18 rodless cavities of oil cylinder lifting body, at this moment, two-bit triplet control valve 4 is in "on" position, be X port and the conducting of Y port, hydraulic oil lifts mould bases support mechanism 1 by jack 18; Oil return is then flowed back to fuel tank 7 from jack 18 rod chambers behind solenoid directional control valve 17, return check valve 12, return filter 10.In the uphill process, if two oil cylinder speed accumulated deficiencies surpass setting value, will underspeed the automatically rate of climb of that too fast relatively oil cylinder of sync control device, the speed for the treatment of are adjusted when consistent, and oil cylinder continues to rise synchronously.
The decline process of oil cylinder lifting body under the effect of heavy duty, realizes that hydraulic oil refluxes by the switching of solenoid directional control valve 17 directions.In the reflux course, change the oil circuit direction by solenoid directional control valve 17, fluid through jack 18 rod chambers, flows back to fuel tank 7 from jack 18 oil cylinder rodless cavities through the R mouth of Pilot operated check valve 2, two-bit triplet control valve 4, solenoid directional control valve 17 from solenoid directional control valve 17 more again behind return check valve 12 and return filter 10.
In addition, this Pilot operated check valve 2 also has a pipeline that leads to jack 18 rod chambers, communicating of this pipeline and rod chamber a little is the remote control mouth, and remote control mouth place is provided with damper, produces the fluid impact endurance test shock to prevent climbing form system in the cylinder process that contracts from normally climbing under the effect of heavy load.

Claims (10)

1. construction creeping formwork jacking synchronous control system, comprise fuel tank, oil pump, motor, transfer conduit system and two cover oil cylinder lifting bodies, described transfer conduit system comprises the oil suction branch road, oil return branch road and solenoid directional control valve, described every cover oil cylinder lifting body comprises jack, Pilot operated check valve and two-bit triplet control valve, described jack has rodless cavity and rod chamber, it is characterized in that: described jacking synchronous control system also comprises the sync control device of being located between described transfer conduit system and the two cover oil cylinder lifting bodies, at oil cylinder lifting body ascent stage, the driven by motor oil pump with hydraulic oil from the oil suction branch road of fuel tank through the transfer conduit system, solenoid directional control valve, arrive the jack rodless cavity of oil cylinder lifting body again through sync control device, oil return is then flowed back to fuel tank from the jack rod chamber through solenoid directional control valve and oil return branch road; In the oil cylinder lifting body decline stage, the driven by motor oil pump directly arrives hydraulic oil the jack rod chamber of oil cylinder lifting body and rodless cavity fluid is flowed out through the transfer conduit system from fuel tank, gets back to fuel tank through solenoid directional control valve, the oil return branch road of transfer conduit system again.
2. construction creeping formwork jacking synchronous control system as claimed in claim 1, it is characterized in that, described sync control device comprises synchronous valve and unidirectional series flow control valve, a port of described synchronous valve links to each other with an end of unidirectional series flow control valve, two ports are connected with the two-bit triplet control valve of oil cylinder lifting body by a control valve respectively in addition, and the other end of described unidirectional series flow control valve is connected with described solenoid directional control valve.
3. construction creeping formwork jacking synchronous control system as claimed in claim 2 is characterized in that described unidirectional series flow control valve carries the unidirectional return line of a parallel connection.
4. construction creeping formwork jacking synchronous control system as claimed in claim 1, it is characterized in that the two-bit triplet control valve of described every cover oil cylinder lifting body has a port that links to each other with sync control device, a port that links to each other with corresponding jack and a port that links to each other with solenoid directional control valve; Under the "on" position, port that links to each other with sync control device and the port conducting that links to each other with jack, under the power failure state, port that links to each other with sync control device and the port conducting that links to each other with solenoid directional control valve.
5. construction creeping formwork jacking synchronous control system as claimed in claim 1 is characterized in that, is provided with oil suction filter and oil sucting one-way valve in turn from oil pump one end on the described oil suction branch road; Be provided with return check valve and return filter in turn from solenoid directional control valve one end on the described oil return branch road.
6. construction creeping formwork jacking synchronous control system as claimed in claim 5, it is characterized in that, described solenoid directional control valve is a 3-position 4-way H type valve, two port is communicated with oil sucting one-way valve output terminal and return check valve input end respectively, and two ports link to each other with the jack rod chamber of sync control device and oil cylinder lifting body respectively in addition.
7. construction creeping formwork jacking synchronous control system as claimed in claim 5 is characterized in that, described return check valve two ends reverse parallel connection one Fill valve, the pressure relief valve of also connecting between described oil sucting one-way valve and the return check valve.
8. construction creeping formwork jacking synchronous control system as claimed in claim 1, it is characterized in that, one end of described Pilot operated check valve links to each other with the two-bit triplet control valve by oil pipe, the other end links to each other with the jack rodless cavity, described Pilot operated check valve also has a pipeline that leads to the jack rod chamber, and this pipeline a little is the remote control mouth with communicating of rod chamber.
9. construction creeping formwork jacking synchronous control system as claimed in claim 8 is characterized in that the place is provided with damper at Pilot operated check valve remote control mouth, prevents that climbing form system from producing the fluid impact endurance test shock in the cylinder process that contracts from normally climbing under the effect of heavy load.
10. construction creeping formwork jacking synchronous control system as claimed in claim 1 is characterized in that described two-bit triplet control valve is a ball-valve structure.
CNU2008200586516U 2008-05-20 2008-05-20 Building construction mould climbing jacking synchronous control system Expired - Lifetime CN201225344Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200586516U CN201225344Y (en) 2008-05-20 2008-05-20 Building construction mould climbing jacking synchronous control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200586516U CN201225344Y (en) 2008-05-20 2008-05-20 Building construction mould climbing jacking synchronous control system

Publications (1)

Publication Number Publication Date
CN201225344Y true CN201225344Y (en) 2009-04-22

Family

ID=40598230

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200586516U Expired - Lifetime CN201225344Y (en) 2008-05-20 2008-05-20 Building construction mould climbing jacking synchronous control system

Country Status (1)

Country Link
CN (1) CN201225344Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102431275A (en) * 2011-09-14 2012-05-02 镇江奥力聚氨酯机械有限公司 Multi-cylinder synchronization apparatus for lamination conveyer
CN102483076A (en) * 2009-07-17 2012-05-30 罗尔工业公司 Supply and resetting hydraulic unit for a lifting assembly with two separate simultaneously actuated powered bearings
WO2012116537A1 (en) * 2011-03-02 2012-09-07 长沙中联重工科技发展股份有限公司 Lifting structure of tower crane, hydraulic system of lifting structure, and lifting method
CN103192466A (en) * 2013-03-18 2013-07-10 三一集团有限公司 Control system for blade turning die and a tensioning device
CN105545832A (en) * 2016-03-08 2016-05-04 中冶赛迪工程技术股份有限公司 Hydraulic control system and method for ascending and descending of movable smoke hood
CN110454454A (en) * 2019-06-26 2019-11-15 武汉船用机械有限责任公司 The hydraulic control system of crude oil exporting hose cantilever crane

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102483076A (en) * 2009-07-17 2012-05-30 罗尔工业公司 Supply and resetting hydraulic unit for a lifting assembly with two separate simultaneously actuated powered bearings
CN102483076B (en) * 2009-07-17 2015-01-07 罗尔工业公司 Supply and resetting hydraulic unit for a lifting assembly with two separate simultaneously actuated powered bearings
WO2012116537A1 (en) * 2011-03-02 2012-09-07 长沙中联重工科技发展股份有限公司 Lifting structure of tower crane, hydraulic system of lifting structure, and lifting method
CN102431275A (en) * 2011-09-14 2012-05-02 镇江奥力聚氨酯机械有限公司 Multi-cylinder synchronization apparatus for lamination conveyer
CN102431275B (en) * 2011-09-14 2014-06-18 镇江奥力聚氨酯机械有限公司 Multi-cylinder synchronization apparatus for lamination conveyer
CN103192466A (en) * 2013-03-18 2013-07-10 三一集团有限公司 Control system for blade turning die and a tensioning device
CN105545832A (en) * 2016-03-08 2016-05-04 中冶赛迪工程技术股份有限公司 Hydraulic control system and method for ascending and descending of movable smoke hood
CN110454454A (en) * 2019-06-26 2019-11-15 武汉船用机械有限责任公司 The hydraulic control system of crude oil exporting hose cantilever crane

Similar Documents

Publication Publication Date Title
CN101586584A (en) A kind of high level, tall and slender structure construction creeping formwork hydraulic synchronous control system
CN201269230Y (en) Integral jacking creeping formwork hydraulic synchronous integrated control system for steel construction platform
CN201225344Y (en) Building construction mould climbing jacking synchronous control system
CN101898244B (en) Synchronous hydraulic system of diffluence motor
CN102173363A (en) Jacking structure of tower crane and hydraulic system and jacking method thereof
CN102900715A (en) Hydraulic control system for forklift, and forklift
CN201554009U (en) Piston-type double hanging point hydraulic headstock gear
CN106870317A (en) A kind of hydraulic cylinder driven slush pump
CN201693168U (en) Synchronous hydraulic device for flow-dividing motor
CN105257614A (en) Hydraulic oil cylinder high-precision synchronous control complete device of ultralarge heavy equipment
CN102295248B (en) Hydraulic elevating leveling device and control and use method for the same
CN101761491B (en) Multi-functional control valve of water pump
CN208150860U (en) Hydraulic control system for aircraft synchronization of jacking up
CN202016806U (en) Jacking structure of tower type crane and hydraulic system thereof
CN205190395U (en) Hydraulic cylinder high -precision synchronization control integrated equipment of super large jumbo
CN201756385U (en) Power pump station used for hydraulic elevator/hydraulic lift
CN205190393U (en) Hydraulic drive device of super large jumbo
CN208221215U (en) A kind of bolt-type ocean lifting platform synchronization hydraulic system
CN202833391U (en) Top drive type drilling machine power head linear motion hydraulic control system
CN110510540B (en) Aircraft jacking hydraulic system
CN209083722U (en) A kind of hydraulic power unit of bolt-type ocean lifting platform
CN109114075B (en) A kind of stereo garage electro-hydraulic proportional control system
CN105545845B (en) A kind of fluid pressure drive device of super large jumbo
CN211110814U (en) Novel aircraft jacking hydraulic system
CN111997944A (en) Hydraulic system for automobile lifter