CN201225103Y - Power drill box - Google Patents

Power drill box Download PDF

Info

Publication number
CN201225103Y
CN201225103Y CNU2008200793130U CN200820079313U CN201225103Y CN 201225103 Y CN201225103 Y CN 201225103Y CN U2008200793130 U CNU2008200793130 U CN U2008200793130U CN 200820079313 U CN200820079313 U CN 200820079313U CN 201225103 Y CN201225103 Y CN 201225103Y
Authority
CN
China
Prior art keywords
drilling tool
metal framework
directive wheel
wire rope
straight line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200793130U
Other languages
Chinese (zh)
Inventor
施境岭
周小刚
聂永坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Bohai Equipment Manufacturing Co Ltd
Original Assignee
Renqiu Huabei Petroleum Pipe Fittings Manufacture Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Renqiu Huabei Petroleum Pipe Fittings Manufacture Co Ltd filed Critical Renqiu Huabei Petroleum Pipe Fittings Manufacture Co Ltd
Priority to CNU2008200793130U priority Critical patent/CN201225103Y/en
Application granted granted Critical
Publication of CN201225103Y publication Critical patent/CN201225103Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a power drilling tool box which is applied to the technical field of oil drilling and is used for storing drilling tools. The power drilling tool box is characterized in that a metal frame storing the drilling tools and a drilling tool lifting mechanism are included, and the metal frame storing the drilling tools is mainly formed by welding a chassis, supporting beams, upright posts and an upper beam; the drilling tool lifting mechanism mainly comprises a linear power mechanism, a wire rope, a lower guide wheel, an upper guide wheel and a lifting girder; the linear power mechanism is fixed at the outer side of the metal frame, the lower guide wheel and the upper guide wheel are fixed at the outer side of the metal frame, and the lifting girder is arranged in the metal frame; the linear power mechanism is connected with one end of the wire rope which is wound around the lower guide wheel and the upper guide wheel, and the other end of the wire rope is fixed on the lifting girder. The utility model has the advantages of intensively storing a plurality of drilling tools in the drilling tool box to facilitate transportation, reduces the floor area of a well field, can lift the drilling tools out of the drilling tool box, and facilitates the use of drilling operations without using a special steel loader and a special crane any more.

Description

The power drilling tool box
Technical field
The utility model relates to the petroleum drilling technology field, particularly a kind of power drilling tool box of depositing, transporting and make things convenient for the wellbore construction operation to use.
Background technology
At present, domestic petroleum drilling technology field working power drilling tool box not as yet.When (comprising drilling rod, drill collar or sleeve pipe etc.), the drilling tool that will reach about 10 meters is in bulk on truck, is transported to the well site at the transportation oil drilling tools.Unload automobile-used special steel pipe charging crane or crane, drilling tool is emitted on the well site.During use, drilling tool is risen on the offshore boring island one by one, G.I.H carries out drillng operation then.
At first, truck drilling tool transportation in bulk is inconvenient, often causes the drilling tool damage.In addition, because drilling tool is the steel pipe that reaches about 10 meters, 3-5 layers of well site dischargings, use special steel pipe charging crane (crane), load and unload discharging, the drilling tool of discharging rolls easily, causes potential safety hazard, and takies very large tracts of land of well site.
The utility model content
The purpose of this utility model is: a kind of power drilling tool box is provided, many drilling tools can be left in the drilling tool box, convenient transportation reduces drilling tool in the well site floor space, need not re-use special steel pipe charging crane or crane, makes things convenient for the well site to use drilling tool.
The technical solution adopted in the utility model is: the power drilling tool box comprises metal framework and the drilling tool elevating mechanism of depositing drilling tool.Deposit the metal framework of drilling tool and mainly be made up of chassis, brace summer, column and top rail, the chassis is the rectangular frame of shaped steel welding, is welded with brace summer on the chassis, is welded with column in the both sides on chassis, in the welded top of column upper ledge is arranged.The drilling tool elevating mechanism mainly by parallel power mechanism, wire rope, down directive wheel, go up directive wheel and the lifting beam is formed, parallel power mechanism is fixed on the metal framework outside, following directive wheel and last directive wheel are fixed on outside the metal framework.The lifting beam is arranged in metal framework.The straight line actuating unit is connected with an end of wire rope, and wire rope is walked around down directive wheel and last directive wheel, and the other end of wire rope is fixed on the lifting beam.The straight line actuating unit produces parallel power, the pulling wire rope.Process is directive wheel and last directive wheel change lineoutofservice signal pull direction down, and wire rope stretchy lifting beam moves upward.The drilling tool of depositing in the metal framework can steadily rise to the top of upper ledge.
For the intensity of reinforcement metal framework, between the chassis, both sides of metal framework and upper ledge, be welded with brace.Two ends at metal framework are welded with steel plate.
The straight line actuating unit adopts linear motor, hydraulic cylinder, air rammer cylinder.
The quantity of straight line actuating unit is 2~4, and the straight line actuating unit is fixed on middle part, the metal framework outside.The quantity of following directive wheel and last directive wheel each.The quantity of lifting beam is 2, the both ends of lifting beam in metal framework.There is rail groove at the two ends of lifting beam, and the lifting beam can move up and down along rail groove.Wire rope is connected the two ends of lifting beam.
The beneficial effects of the utility model: the utility model power drilling tool box, many drilling tools can be left concentratedly in the drilling tool box, the drilling tool of drilling tool box in the drilling tool box installed on the truck convenient transportation; A plurality of drilling tool boxes are emitted on the well site, need not re-use special steel pipe charging crane or crane, reduce the well site floor space; Because the drilling tool box has the function of lifting drilling tool, make things convenient for drillng operation to use.
Below in conjunction with drawings and Examples the utility model power drilling tool box is described further.
Description of drawings
Fig. 1 is the utility model power drilling tool box structural representation, front view.
Fig. 2 is the vertical view of Fig. 1.
Among the figure, 1. chassis, 2. brace summer, 3. column, 4. straight line actuating unit, 5. wire rope 6. descends directive wheel, and 7. the lifting beam is 8. gone up directive wheel, 9. upper ledge, 10. brace, 11. steel plates.
The specific embodiment
Embodiment 1: with one long 11 meters, wide 2.14 meters, high 1.5 meters power drilling tool box is an example, is elaborated.
Consult Fig. 1.The power drilling tool box is made up of the metal framework of depositing drilling tool and drilling tool elevating mechanism.
Depositing the metal framework of drilling tool mainly is made up of chassis 1, brace summer 2, column 3 and top rail 9.The length of metal framework is 11 meters, and 2.14 meters of width highly are 1.5 meters.Can deposit 6 layers of drilling rod, 10 on every layer of drilling rod.Chassis 1 is the rectangle frame of steel pipe welding.Be welded with brace summer 2 on chassis 1, what brace summer 2 adopted is i iron.1 both sides are welded with column 3 on the chassis, and what column 3 adopted is steel pipe.Welded top at column 3 has upper ledge 9, and upper ledge 9 is a rectangle, employing be that steel pipe is welded into.In the both sides of metal framework, be welded with brace 10 between chassis 1 and the upper ledge 9.Two ends at metal framework are welded with steel plate 11 respectively.
The drilling tool elevating mechanism mainly is made up of straight line actuating unit 4, wire rope 5, time directive wheel 6, last directive wheel 8 and lifting beam 7.The quantity of straight line actuating unit 4 is 4, and straight line actuating unit 4 is fixed on middle part, the metal framework outside.Consult Fig. 2 straight line actuating unit 4 and adopt hydraulic cylinder.Adopt bolt that hydraulic cylinder is fixed on the junction plate 12 in the metal framework outside.Following directive wheel 6 and last directive wheel 8 are fixed pulleys.Each 4 of the quantity of following directive wheel 6 and last directive wheel 8.Following directive wheel 6 and last directive wheel 8 adopt and are bolted to the metal framework outside.Lifting beam 7 is arranged in metal framework, the both ends of lifting beam 7 in metal framework, there is rail groove at the two ends of lifting beam 7, and lifting beam 7 can move up and down along rail groove.The quantity of lifting beam 7 is 2.Consult Fig. 1.Hydraulic cylinder connects an end of wire rope 5, and wire rope 5 is walked around down directive wheel 6 and last directive wheel 8, and the other end of wire rope 5 is fixed on the lifting beam 7.Wire rope 5 is connected the two ends of lifting beam 7.Hydraulic cylinder produces power, pulling wire rope 5.Process is directive wheel 6 and last directive wheel 8 change wire rope 5 direction of pull down, and wire rope 5 stretchy lifting beams 7 move upward.6 layers of drilling tool depositing in the metal framework can rise to upper frame and go out box.
Embodiment 2: embodiment 2 is substantially the same manner as Example 1, and what difference was that straight line actuating unit 4 adopts is linear motor.
Embodiment 3: embodiment 3 is substantially the same manner as Example 1, and what difference was that straight line actuating unit 4 adopts is the air rammer cylinder.

Claims (6)

1, a kind of power drilling tool box, comprise metal framework and the drilling tool elevating mechanism of depositing drilling tool, it is characterized in that: the metal framework of depositing drilling tool mainly is made up of chassis (1), brace summer (2), column (3) and top rail (9), chassis (1) is the rectangle frame of shaped steel welding, on chassis (1), be welded with brace summer (2), the both sides of (1) are welded with column (3) on the chassis, in the welded top of column (3) upper ledge (9) are arranged; The drilling tool elevating mechanism mainly is made up of straight line actuating unit (4), wire rope (5), time directive wheel (6), last directive wheel (8) and lifting beam (7), straight line actuating unit (4) is fixed on the metal framework outside, following directive wheel (6) and last directive wheel (8) are fixed on the metal framework outside, lifting beam (7) is arranged in metal framework, straight line actuating unit (4) is connected with an end of wire rope (5), wire rope (5) is walked around down directive wheel (6) and last directive wheel (8), and the other end of wire rope (5) is fixed on the lifting beam (7).
2, power drilling tool box according to claim 1 is characterized in that: be welded with brace (10) between the chassis, both sides (1) of metal framework and upper ledge (9), be welded with steel plate (11) at the two ends of metal framework.
3, according to claim 1 or 2 or 3 described power drilling tool boxes, it is characterized in that: straight line actuating unit (4) adopts linear motor.
4, power drilling tool box according to claim 1 is characterized in that: straight line actuating unit (4) adopts hydraulic cylinder.
5, according to claim 1 or 2 or 3 described power drilling tool boxes, it is characterized in that: straight line actuating unit (4) adopts the air rammer cylinder.
6, according to claim 1 or 2 or 3 described power drilling tool boxes, it is characterized in that: the quantity of straight line actuating unit (4) is 2~4, straight line actuating unit (4) is fixed on middle part, the metal framework outside, each 4 of the quantity of following directive wheel (6) and last directive wheel (8), the quantity of lifting beam (7) is 2, the both ends of lifting beam (7) in metal framework, there is rail groove at the two ends of lifting beam (7), and wire rope (5) is connected the two ends of lifting beam (7).
CNU2008200793130U 2008-03-11 2008-03-11 Power drill box Expired - Fee Related CN201225103Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200793130U CN201225103Y (en) 2008-03-11 2008-03-11 Power drill box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200793130U CN201225103Y (en) 2008-03-11 2008-03-11 Power drill box

Publications (1)

Publication Number Publication Date
CN201225103Y true CN201225103Y (en) 2009-04-22

Family

ID=40597988

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200793130U Expired - Fee Related CN201225103Y (en) 2008-03-11 2008-03-11 Power drill box

Country Status (1)

Country Link
CN (1) CN201225103Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104373062A (en) * 2014-07-03 2015-02-25 重庆大江工业有限责任公司 Transfer car and drill transfer mechanism and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104373062A (en) * 2014-07-03 2015-02-25 重庆大江工业有限责任公司 Transfer car and drill transfer mechanism and method

Similar Documents

Publication Publication Date Title
WO2008119239A1 (en) A lifter with linking rod transmission
CN103288010B (en) A kind of fork lift truck structure
CN103437563B (en) A kind of mounting method for large steel-strctrue building steel frame
CN102720432A (en) Self-propelled underground boring jumbo
CN201914858U (en) Gantry crane used for heavy-cargo logistics
CN202785364U (en) Movable dual-door-type mast hoisting device
CN203684113U (en) Automatic beam placement platform device
CN201225103Y (en) Power drill box
CN201545649U (en) Equipment transportation device in small space
CN202208922U (en) Impact hammer for pile pouring machine
CN201646790U (en) Turnover panel concertina type workpiece loading and transporting vehicle
CN213475219U (en) Roof concrete lifting and sliding conveying system
CN205474639U (en) A rail travelling bogie that is used for bridge floor railway to lay rail welding rail production line
CN202322110U (en) Multifunctional telescopic arm-type crane
CN209760046U (en) Transport support and transport device
CN109681130B (en) Ocean platform hydraulic drilling machine
CN206569912U (en) A kind of transformer lifting gantry device of convenient disassembly
CN202156886U (en) Lifting system and tunnel lining trolley comprising same
CN100425521C (en) Jacking type large gantry crane
CN201433589Y (en) Silo roof steel beam slip-form lifting device
CN201362860Y (en) Building concrete pile detection device
CN205526991U (en) A device for liftable erects to be coiled
CN204434238U (en) A kind of well maintenance vehicle heavier-duty turning rack with pressure
CN205634553U (en) Rail mounted lift platform
CN203599270U (en) Unloading device on slitting line of strip steel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CNPC BOHAI PETROLEUM EQUIPMENT MANUFACTURING CO.,

Free format text: FORMER OWNER: RENQIU HUABEI PETROLEUM PIPE FITTINGS MANUFACTURE CO., LTD.

Effective date: 20110422

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 062552 NORTH CHINA PETROLEUM TUBE + TOOL MANUFACTURING CO., LTD., BEIZHAN WEST ROAD, RENQIU CITY, HEBEI PROVINCE TO: 300457 BUILDING 3, TIANJIN BINHAI SERVICE OUTSOURCING INDUSTRIAL PARK, NO. 19, XINHUAN WEST ROAD, TIANJIN DEVELOPMENT ZONE

TR01 Transfer of patent right

Effective date of registration: 20110422

Address after: 300457, Tianjin Development Zone, No. 19 West Ring Road, Tianjin Binhai service outsourcing industry park, building 3

Patentee after: CNPC Bohai Equipment Manufacturing Co., Ltd.

Address before: 062552 Hebei Renqiu North West Road Huabei oil pipe manufacturing Co., Ltd.

Patentee before: Renqiu Huabei Petroleum Pipe Fittings Manufacture Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090422

Termination date: 20160311