CN201224869Y - 圆墩盖梁支撑装置 - Google Patents

圆墩盖梁支撑装置 Download PDF

Info

Publication number
CN201224869Y
CN201224869Y CNU2008202187120U CN200820218712U CN201224869Y CN 201224869 Y CN201224869 Y CN 201224869Y CN U2008202187120 U CNU2008202187120 U CN U2008202187120U CN 200820218712 U CN200820218712 U CN 200820218712U CN 201224869 Y CN201224869 Y CN 201224869Y
Authority
CN
China
Prior art keywords
construction
supporting device
connecting plates
pier
bent cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202187120U
Other languages
English (en)
Inventor
张艳娇
杨福刚
于建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 9 Group Co Ltd
Original Assignee
China Railway No 9 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 9 Group Co Ltd filed Critical China Railway No 9 Group Co Ltd
Priority to CNU2008202187120U priority Critical patent/CN201224869Y/zh
Application granted granted Critical
Publication of CN201224869Y publication Critical patent/CN201224869Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

圆墩盖梁支撑装置,用于桥梁施工中,是盖梁浇筑时的支撑装置;解决支架法施工要消耗大量的人力、物力,施工成本高,周期长等不足;圆墩盖梁支撑装置,其特征在于由连接板、加劲板、橡胶垫、两个半圆形抱箍和紧固件组成;在半圆形抱箍的两端安装连接板,连接板上制出安装紧固件的孔,在连接板与半圆形抱箍之间安装加劲板,在两个半圆形抱箍内壁上安装橡胶垫,紧固件安装在连接板上的孔中;优点:施工简便,节省施工成本,可以有效缩短施工周期等。

Description

圆墩盖梁支撑装置
技术领域:本发明创造用于桥梁施工中,是盖梁浇筑时的支撑装置。
背景技术:已往,在桥梁施工中,浇注盖梁采用的支撑装置,通常是采用支架法施工,支架法施工对地基的承载力要求比较高,一般均要求对地基进行压实,对软土地基还需要浇筑混凝土地坪,因此,对地基的处理要花费较多人力物力。如果对地基的处理稍有不慎,即可造成支架整体下沉,严重影响盖梁的施工质量;墩柱较高时,支架庞大需要巨额投入,还必须对支架进行预压以消除非弹性变形,这需要消耗大量人力物力;由于墩柱高度的变化而需要调整底模高度,对于钢管支架的调整从经济上讲是不合算的,而且还要大量不必要的人力;支架法施工对木材需要量较大,因此消耗能源较大;如在水中施工无系梁桥墩时,支架法很难施工。
发明内容:本发明创造的目的是在桥梁施工中,浇筑盖梁时提供一种替代支架法施工的圆墩盖梁支撑装置;本发明创造的目的是通过下述的技术方案实现的:圆墩盖梁支撑装置,其特征在于由连接板、加劲板、橡胶垫、两个半圆形抱箍和紧固件组成;在半圆形抱箍的两端安装连接板,连接板上制出安装紧固件的孔,在连接板与半圆形抱箍之间安装加劲板,在两个半圆形抱箍内壁安装橡胶垫,紧固件安装在连接板上的孔中。
本发明创造的优点:在桥梁施工中,浇筑盖梁时,是将圆墩盖梁支撑装置固定在圆柱形的混凝土圆墩上,替代支架法施工中的支架,是依据圆墩盖梁支撑装置与混凝土圆墩之间产生的摩擦力支撑浇筑盖梁产生的重力,因此对墩柱周围地基无所要求,省去了对地基处理的费用,也节省了支架法施工中所用的大量的木材和钢管,节省了能源,节省了成本,特别适合在工期短的施工中采用此装置,适应高度不同的混凝土墩施工。
附图说明:
图1是圆墩盖梁支撑装置在桥梁施工中,浇筑盖梁时应用安装示意图;
图2是图1中A向示意图即圆墩盖梁支撑装置结构示意图。
图中的:1、连接板  2、加劲板  3、混凝土墩  4、橡胶垫  5、两个半圆形抱箍  6、紧固件  7、工字钢  8、盖梁底模板  9、盖梁
具体实施方式:圆墩盖梁支撑装置,其特征在于由连接板、加劲板、橡胶垫、两个半圆形抱箍和紧固件组成;在半圆形抱箍的两端安装连接板,连接板上制出安装紧固件的孔,在连接板与半圆形抱箍之间安装加劲板,在两个半圆形抱箍内壁安装橡胶垫,紧固件安装在连接板上的孔中。紧固件可采用螺栓、螺母。两个半圆形抱箍采用钢板制成。加劲板可根据强度要求设计决定层数。
圆墩盖梁支撑装置使用说明:在桥梁施工中,浇筑盖梁时,是将圆墩盖梁支撑装置固定在混凝土墩上端,将施工中采用的过渡件工字钢安装在圆墩盖梁支撑装置中的连接板、加劲板上,在工字钢上面安装盖梁底模板,在盖梁底模板上浇筑盖梁。由于是将圆墩盖梁支撑装置经两个半圆形抱箍抱住混凝土墩,必须与混凝土墩密贴,但是由于混凝土墩截面不可能绝对圆,各混凝土墩的不圆度也是不同的,因此为了适应各种不圆度的混凝土墩,两个半圆形抱箍为不设加强环或加劲板的柔性抱箍,这样,在施加预拉力时,由于两个半圆形抱箍是柔性的,容易与混凝土墩密贴;连接板上安装的紧固件可采用螺栓、螺母,螺栓、螺母在连接板上的排列,必须保证圆墩盖梁支撑装置与混凝土墩间的摩擦力能可靠地传递载荷,因此,要有足够数量的螺栓来保证预拉力,根据预拉力的要求决定螺栓的排数及每排的个数。
圆墩盖梁支撑装置与混凝土墩间的最大静摩擦力等于正压力与摩擦系数的乘积,即f=μ×N
式中f—两个半圆形抱箍与混凝土墩间的最大静摩擦力;
N—圆墩盖梁支撑装置与混凝土墩间的正压力;
μ—圆墩盖梁支撑装置与混凝土墩的摩擦系数。

Claims (1)

1、圆墩盖梁支撑装置,其特征在于由连接板、加劲板、橡胶垫、两个半圆形抱箍和紧固件组成;在半圆形抱箍的两端安装连接板,连接板上制出安装紧固件的孔,在连接板与半圆形抱箍之间安装加劲板,在两个半圆形抱箍内壁安装橡胶垫,紧固件安装在连接板上的孔中。
CNU2008202187120U 2008-10-27 2008-10-27 圆墩盖梁支撑装置 Expired - Lifetime CN201224869Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202187120U CN201224869Y (zh) 2008-10-27 2008-10-27 圆墩盖梁支撑装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202187120U CN201224869Y (zh) 2008-10-27 2008-10-27 圆墩盖梁支撑装置

Publications (1)

Publication Number Publication Date
CN201224869Y true CN201224869Y (zh) 2009-04-22

Family

ID=40597754

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202187120U Expired - Lifetime CN201224869Y (zh) 2008-10-27 2008-10-27 圆墩盖梁支撑装置

Country Status (1)

Country Link
CN (1) CN201224869Y (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101935982A (zh) * 2010-08-11 2011-01-05 中铁三局集团有限公司 独立桥墩盖梁模板托架的搭建方法
CN101994293A (zh) * 2010-11-11 2011-03-30 中铁六局集团有限公司 一种高墩盖梁施工方法
CN102234982A (zh) * 2011-05-10 2011-11-09 吴江市明港道桥工程有限公司 一种圆墩盖梁支撑装置
CN102444278A (zh) * 2011-10-21 2012-05-09 中铁十七局集团第四工程有限公司 带有升降式托辊的抱箍及使用该抱箍进行混凝土浇注支撑体系转换的方法
CN102635072A (zh) * 2012-04-20 2012-08-15 上海颖川加固工程技术有限公司 桥梁顶升用钢夹箍支撑体系
CN102839600A (zh) * 2012-07-30 2012-12-26 东南大学 一种木石组合桥的钢结构连接装置
CN108930224A (zh) * 2018-08-08 2018-12-04 云南公投建设集团第九工程有限公司 穿心棒法盖梁支撑调节系统施工方法
CN108978482A (zh) * 2018-08-23 2018-12-11 中国五冶集团有限公司 圆墩盖梁的拼装式支撑架以其安装方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101935982A (zh) * 2010-08-11 2011-01-05 中铁三局集团有限公司 独立桥墩盖梁模板托架的搭建方法
CN101935982B (zh) * 2010-08-11 2011-11-16 中铁三局集团有限公司 独立桥墩盖梁模板托架的搭建方法
CN101994293A (zh) * 2010-11-11 2011-03-30 中铁六局集团有限公司 一种高墩盖梁施工方法
CN101994293B (zh) * 2010-11-11 2012-08-22 中铁六局集团有限公司 一种高墩盖梁施工方法
CN102234982A (zh) * 2011-05-10 2011-11-09 吴江市明港道桥工程有限公司 一种圆墩盖梁支撑装置
CN102444278A (zh) * 2011-10-21 2012-05-09 中铁十七局集团第四工程有限公司 带有升降式托辊的抱箍及使用该抱箍进行混凝土浇注支撑体系转换的方法
CN102444278B (zh) * 2011-10-21 2013-07-31 中铁十七局集团第四工程有限公司 带有升降式托辊的抱箍及使用该抱箍进行混凝土浇筑支撑体系转换的方法
CN102635072A (zh) * 2012-04-20 2012-08-15 上海颖川加固工程技术有限公司 桥梁顶升用钢夹箍支撑体系
CN102839600A (zh) * 2012-07-30 2012-12-26 东南大学 一种木石组合桥的钢结构连接装置
CN108930224A (zh) * 2018-08-08 2018-12-04 云南公投建设集团第九工程有限公司 穿心棒法盖梁支撑调节系统施工方法
CN108978482A (zh) * 2018-08-23 2018-12-11 中国五冶集团有限公司 圆墩盖梁的拼装式支撑架以其安装方法

Similar Documents

Publication Publication Date Title
CN201224869Y (zh) 圆墩盖梁支撑装置
CN201746774U (zh) 一种带组合锚固装置的斜拉桥索塔锚固区钢牛腿
CN204608592U (zh) 一种桥梁用耗能减震防落梁装置
CN108468378B (zh) 一种混凝土结构预制装配式节点
CN108442238B (zh) 一种横向装配式自复位型抗震挡块及其施工方法
CN202673588U (zh) 用于连接混凝土塔筒和钢塔筒的装置
CN203451114U (zh) 用于桥塔施工的塔吊附着装置
CN101230579A (zh) 环形承压底板井格梁式风力发电塔基础
CN110616733A (zh) 一种输电铁塔基础及构件的整体加固装置及方法
CN211368810U (zh) 一种用于装配式桥梁墩柱的减震装置
CN101694085B (zh) 复合式软钢耗能桥梁支座
CN112523775A (zh) 一种新型联络通道预应力支架装置
CN208362891U (zh) 一种横向装配式自复位型抗震挡块
CN205242248U (zh) 形状记忆合金拉索减震支座
CN209568564U (zh) 一种土木工程用抗震结构
CN206289530U (zh) 一种减隔震橡胶支座
CN206784159U (zh) 一种桥梁抗震支座
CN201865043U (zh) 桥梁减震支座
CN211524170U (zh) 一种建筑工程框架梁加固装置
CN110805164B (zh) 底部带有减震耗能连接件的装配式剪力墙
CN211472913U (zh) 一种隔震层结构
CN203855883U (zh) 一种侧向固定的板式橡胶支座
CN210216153U (zh) 装配式预应力牛腿托架预压体系
CN108678161B (zh) 一种预应力混凝土排架柱及施工方法
CN106978908B (zh) 带剪切软钢阻尼器的内嵌预应力装配式框架加固结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20090422

CX01 Expiry of patent term