CN201221046Y - Prefabricated box girder - Google Patents
Prefabricated box girder Download PDFInfo
- Publication number
- CN201221046Y CN201221046Y CNU2008200373755U CN200820037375U CN201221046Y CN 201221046 Y CN201221046 Y CN 201221046Y CN U2008200373755 U CNU2008200373755 U CN U2008200373755U CN 200820037375 U CN200820037375 U CN 200820037375U CN 201221046 Y CN201221046 Y CN 201221046Y
- Authority
- CN
- China
- Prior art keywords
- internal mold
- walking beam
- guide rail
- roller
- backform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a precast box beam, which comprises an inner mold, a bottom mold, a walking beam arranged in the inner mold, a guide rail arranged in longitudinal direction below the walking beam and fixedly connected with the walking beam, and a plurality of first rollers connected with the bottom mold, wherein the guide rail can move on the first rollers. The integral formation of the template can simplify the installation and the extraction operation of the inner mold and can simplify the roller structure to achieve easy manufacture. In addition, the inner mold can be moved out of the box beam without directional hanging, thereby achieving less occupied site area, improving turnover utilization rate around the site, and improving operation efficiency.
Description
Technical field
The utility model relates to the site operation apparatus field, and especially a kind of prefabricated case that is used for the high-speed railway Line for Passenger Transportation adopts the main equipment of all-hydraulic whole deploying and retracting internal mold.
Background technology
On the high-speed railway Line for Passenger Transportation, in view of the high standard requirement of high speed traveling to the smooth-going performance of circuit, therefore most of highway section all adopts the bridge construction form to cross over, and this makes whole hole hollow prestress box-girder obtain widely applying.In prefabricated process, one of essential heavy construction equipment is exactly the supporting mould one " internal mold " that forms space in the casing.When internal mold is shifted out the fine strain of millet case, must lay guide rail in the internal mold outside, so that internal mold is hauled out, workload is just bigger like this, and length consuming time, and the occupied ground area is big, and the mobility of construction is just poor.
Summary of the invention
The technical problems to be solved in the utility model is: provide a kind of high speed to carry the prefabricated fine strain of millet case of special line for passenger trains.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of prefabricated case beam, comprise internal mold, bed die, walking beam is installed in the internal mold, the below of walking beam is provided with guide rail along the longitudinal direction, this guide rail is fixedlyed connected with walking beam, connects a plurality of first rollers on the bed die, and this guide rail can move on first roller.
Further, also comprise draw-gear, this draw-gear is positioned at the internal mold outside along the longitudinal direction.
Further, the described internal mold outside also is provided with second roller along the longitudinal direction, and second roller is between draw-gear and internal mold.
Further; described internal mold also comprises backform; with the hinged side form of backform; and the load-bearing pillar that is used to support backform; this load-bearing pillar is connected with walking beam by hydraulic jack; be connected by hydraulic jack between backform and the side form, and the fluid power system that is used to drive hydraulic jack.
The beneficial effects of the utility model are because template is formed whole form, make internal mold installation, shift out operation and simplify, and wheel track is simplified the structure, be easy to make.In addition, make internal mold shift out the fine strain of millet case and can non-directional hang and draw, the turnover utilization rate around the few and place of occupied ground area is improved, and has promoted operating efficiency.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the partial cross section figure of Fig. 1.
Among the figure, 1, internal mold, 3, bed die, 5, walking beam, 7, guide rail, 9, first roller, 11, draw-gear, 13, second roller, 15, backform, 17, side form, 19, the load-bearing pillar, 21, fluid power system.
The specific embodiment
With preferred embodiment the utility model is described in further detail in conjunction with the accompanying drawings now.These accompanying drawings are the schematic diagram of simplification, basic structure of the present utility model only is described in a schematic way, so it only show the formation relevant with the utility model.
Prefabricated case beam as shown in Figure 1, comprise internal mold 1, bed die 3, and draw-gear 11, this draw-gear 11 is positioned at internal mold 1 outside, and draw-gear 11 is positioned on the longitudinal direction of internal mold 1, this draw-gear 11 is used for internal mold 1 is pulled out the fine strain of millet case. and internal mold 1 also is equipped with walking beam 5, the below of walking beam 5 is provided with guide rail 7 along the longitudinal direction, connects a plurality of first rollers 9 on the bed die 3, and this guide rail 7 can move on first roller 9.In addition, internal mold 1 outside also is provided with second roller 13 along the longitudinal direction, and second roller 13 is between draw-gear 11 and internal mold 1.Internal mold 1 comprises backform 15, with backform 15 hinged side forms 17, and the load-bearing pillar 19 that is used to support backform 15, this load-bearing pillar 19 is connected with walking beam 5 by hydraulic jack, be connected by hydraulic jack between backform 15 and the side form 17, and the fluid power system 21 that is used to drive hydraulic jack.
When needs use prefabricated box girder inner formwork 1, first roller 9 at first is installed on bed die 3, and second roller 13 is arranged in fine strain of millet case arranged outside, then prefabricated box girder inner formwork 1 is drawn to pouring position by draw-gear 13 along first roller 9, second roller 13, then load-bearing pillar 19 is increased to the designing requirement height, in addition side form 17 is launched, be deployed into the degree of designing requirement when side form 17 by fluid power system 21, keep this state, just can carry out the reinforced concrete box beam and make.
At last, finish when case is beam prefabricated, after concrete strength reaches demoulding strength, it is dismountable internal mold 1, at first shrink by the side form 17 of fluid power system 21 with internal mold 1, then load-bearing pillar 19 is reduced to the appropriate location, the walking beam 5 of internal mold 1 outwards moves at the traction lower edge of draw-gear 11 first roller 9, second roller 13, is hauled out until whole internal mold 1.This stripping means mechanization degree height, high efficiency.
With above-mentioned foundation desirable embodiment of the present utility model is enlightenment, and by above-mentioned description, the related work personnel can carry out various change and modification fully in the scope that does not depart from this utility model technological thought.The technical scope of this utility model is not limited to the content on the manual, must determine its technical scope according to the claim scope.
Claims (4)
1, a kind of prefabricated case beam, comprise internal mold (1), bed die (3), walking beam (5) is installed in the internal mold (1), it is characterized in that: the below of walking beam (5) is provided with guide rail (7) along the longitudinal direction, this guide rail (7) is fixedlyed connected with walking beam (5), connects a plurality of first rollers (9) on the bed die (3), and this guide rail (7) can be gone up at first roller (9) and move.
2, prefabricated case beam as claimed in claim 1 is characterized in that: also comprise draw-gear (11), this draw-gear (11) is positioned at internal mold (1) outside along the longitudinal direction.
3, prefabricated case beam as claimed in claim 2 is characterized in that: described internal mold (1) outside also is provided with second roller (13) along the longitudinal direction, and second roller (13) is positioned between draw-gear (11) and the internal mold (1).
4, prefabricated case beam as claimed in claim 1, it is characterized in that: described internal mold (1) also comprises backform (15), with the hinged side form of backform (15) (17), and the load-bearing pillar (19) that is used to support backform (15), this load-bearing pillar (19) is connected with walking beam (5) by hydraulic jack, be connected by hydraulic jack between backform (15) and the side form (17), and the fluid power system (21) that is used to drive hydraulic jack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200373755U CN201221046Y (en) | 2008-06-06 | 2008-06-06 | Prefabricated box girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200373755U CN201221046Y (en) | 2008-06-06 | 2008-06-06 | Prefabricated box girder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201221046Y true CN201221046Y (en) | 2009-04-15 |
Family
ID=40574557
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200373755U Expired - Fee Related CN201221046Y (en) | 2008-06-06 | 2008-06-06 | Prefabricated box girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201221046Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102001127A (en) * | 2010-10-26 | 2011-04-06 | 湖南中铁五新钢模有限责任公司 | Combined box girder hydraulic internal mould |
-
2008
- 2008-06-06 CN CNU2008200373755U patent/CN201221046Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102001127A (en) * | 2010-10-26 | 2011-04-06 | 湖南中铁五新钢模有限责任公司 | Combined box girder hydraulic internal mould |
CN102001127B (en) * | 2010-10-26 | 2012-07-04 | 湖南中铁五新钢模有限责任公司 | Combined box girder hydraulic internal mould |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106089253B (en) | A kind of all-hydraulic template system poured for culvert | |
CN102966121B (en) | Integrally movable mould frame for pipe rack cast-in-site construction | |
CN107363988B (en) | Hydraulic internal mold toothed rail traveling system and traveling method for prefabricated box girder | |
CN203022024U (en) | Integrally-movable formwork for pipe gallery cast-in-situ construction | |
CN201474704U (en) | Needle beam type hydraulic steel mould carrier | |
CN106120584A (en) | A kind of box culvert slip form construction device and method | |
CN104594918A (en) | Split integrated underground passage steel mold plate trolley and construction method thereof | |
CN103742168A (en) | Independent lining trolley for anchorage holes and opening holes of tunnels | |
CN106194216A (en) | A kind of Rectangular Box Culvert and constructing tunnel chassis | |
CN107326930A (en) | A kind of live rapidform machine of Urban Underground pipe gallery and its method of work | |
CN108098982B (en) | Hydraulic retraction internal mold for large-span precast box girder | |
CN106223983A (en) | A kind of diversion tunnel inclined shaft, flat section tunneling boring primary steel mould trolley | |
CN205936645U (en) | A full liquid die plate system for culvert is pour | |
CN206016835U (en) | Tunnel and subway engineering diameter Changeable Model chassis | |
CN201963317U (en) | Single-side steel mould trolley | |
CN206035507U (en) | Rectangle box culvert and for tunnel construction platform truck | |
CN211547804U (en) | Cantilever type retaining wall rapid construction device | |
CN211762304U (en) | Self-propelled hydraulic integral T-beam template device | |
CN201221046Y (en) | Prefabricated box girder | |
CN205975365U (en) | Cast -in -situ box girder combined type moving die carrier | |
CN101597884A (en) | A kind of prefabricated case beam | |
CN102001127B (en) | Combined box girder hydraulic internal mould | |
CN201264291Y (en) | Automatic deploying and retracting internal mold of prefabricated box girder | |
CN204552760U (en) | Traveling type hydraulic formwork jumbo | |
CN206092017U (en) | Diversion tunnel inclined shaft, complete general steel mould trolley of section of flat section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Changzhou Guofeng Machine Co., Ltd. Assignor: Song Guomin Contract record no.: 2010320000447 Denomination of utility model: Movement-limit adjusting device of precast box beam Granted publication date: 20090415 License type: Exclusive License Record date: 20100423 |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090415 Termination date: 20140606 |