CN201218073Y - Drill hole pipe reinforcing device - Google Patents

Drill hole pipe reinforcing device Download PDF

Info

Publication number
CN201218073Y
CN201218073Y CNU2008200293835U CN200820029383U CN201218073Y CN 201218073 Y CN201218073 Y CN 201218073Y CN U2008200293835 U CNU2008200293835 U CN U2008200293835U CN 200820029383 U CN200820029383 U CN 200820029383U CN 201218073 Y CN201218073 Y CN 201218073Y
Authority
CN
China
Prior art keywords
orifice
orifice tube
drilling
external piece
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200293835U
Other languages
Chinese (zh)
Inventor
姬中奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN RESEARCH INSTITUTE OF CHINA COAL RESEARCH INSTITUTE
Xian Research Institute Co Ltd of CCTEG
Original Assignee
SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE filed Critical SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE
Priority to CNU2008200293835U priority Critical patent/CN201218073Y/en
Application granted granted Critical
Publication of CN201218073Y publication Critical patent/CN201218073Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of geological drilling orifice devices, in particular to a drilling orifice pipe reinforcing device. The utility model aims to solve the problems existing in the prior art that the cost is high, the process is complicated, a definite risk exists, and the like, and has the technical proposal that the drilling orifice pipe reinforcing device comprises an orifice pipe and an external connecting piece. The drilling orifice pipe reinforcing device is characterized in that a reinforcing piece with a central hole is arranged between the orifice pipe and the external connecting piece, the periphery of the reinforcing piece is evenly distributed with external connecting holes, and anchor rods are fixedly arranged into the external connecting holes. The utility model has the advantages that: firstly, the reinforcing mode is simple; secondly, the reinforcing effect is significant; and thirdly, the manufacturing is easy and the site implementation is facilitated.

Description

A kind of drilling orifice pipe bracing means
Technical field:
The utility model relates to geotechnical boring opening arrangement technical field, is specifically related to a kind of drilling orifice pipe bracing means.
Background technology:
In the geotechnical boring engineering, according to the requirement of hole structure, some boring needs to install and the fixed orifice pipe, as hydrogeologic drilling.The method of common installation and fixed orifice pipe is after Completion of Drilling Hole, orifice tube is lowered in the boring, backfilling cement slurries or other coagulums in the annular gap space between orifice tube and the borehole wall, make orifice tube and hole wall gluing be frozen into an integral body, thereby make orifice tube be fixed on the hole wall of geologic body and produce certain consolidation strength.After the fixing end of orifice tube, what have also will check the consolidation strength of orifice tube whether to satisfy the requirement of hole internal pressure by withstand voltage test, be consolidation strength whether greater than liquid or gas in the boring behind the bore closed to the pressure in aperture, visit and discharge water and the part Grouting engineering as hydrogeologic drilling under the coal mine, down-hole.
The consolidation strength of drilling orifice pipe can improve by the length that increases orifice tube, so in most cases the Design of length that needs only orifice tube gets long enough, the consolidation strength of orifice tube can meet the demands fully, makes orifice tube that the interior high-pressure fluid of the force-closed boring of enough energy be arranged.
Along with the extensive use of borehole engineering in production and construction, under some special geological condition, when the length of orifice tube was subjected to the restriction on stratum, the consolidation strength of orifice tube was difficult to meet the demands.The test requirement of engineering that discharges water was fixed orifice tube before boring discloses the aquifer as coal mine, and make the high hydraulic pressure that orifice tube can the confining bed of aquifer, occur in time to withdraw from drilling tool and closing the orifice tube valve behind the boring water burst so that disclose the aquifer, eliminate the harm that the boring water burst causes mine in boring.But the distance between boring tapping and target aquifer is too near, and during the curtailment of formation consolidation orifice tube, the method consolidation strength of the fixed orifice pipe that the above is conventional is limited, is difficult to water under high pressure is enclosed in the boring.
Realize at existing pure dependence annular gap coagulum under the method for solid pipe, solve above-mentionedly, just must use superpower solid tube material or improve solid length of tube by force because of solid length of tube short-range missile causes the problem of orifice tube consolidation strength deficiency.The former involves great expense and does not have ripe superpower solid tube material at present; The latter need disclose the aquifer by force and top water creeps into certain depth, use the glued annular gap of rapid condensation material filling then, a kind of method that has been 200610012916.4 disclosure of the Invention as application number, can have under the situation of water by slip casting chemical material fixed orifice pipe in boring, this method not only needs special chemical material and complicated grouting equipment, also to head on the boring water burst simultaneously and carry out operation, therefore exist solid plumber plant complexity, cost height, problem such as certain risk is arranged.
Summary of the invention:
The purpose of this utility model is that a kind of drilling orifice pipe bracing means will be provided, to solve cost height, the complex process that prior art exists, the problem that certain risk is arranged.
For solving the problem that prior art exists, the technical scheme that the utility model provides is:
A kind of drilling orifice pipe bracing means comprises orifice tube and external piece, and its special character is: be provided with the girth member of band mesopore between orifice tube and external piece, be evenly equipped with the outer hole of connection on the described girth member periphery, fixedly be equipped with anchor pole on the hole outside connecting.
Above-mentioned girth member is the orifice tube flange of an increasing, is evenly equipped with the endoporus that connects external piece on the interior week of this orifice tube flange, is evenly equipped with on the enlarged of periphery to connect outer hole.
Above-mentioned orifice tube flange is directly welded in the orifice tube end.
Above-mentioned girth member comprises orifice tube flange and reinforcing dish, and the diameter of described reinforcing dish is evenly equipped with the endoporus that connects aperture pipe flange and external piece greater than the orifice tube flange on week in the reinforcing dish, is evenly equipped with on the periphery to connect outer hole.
Above-mentioned orifice tube flange is directly welded in the orifice tube end, and the reinforcing dish is connected by bolt with orifice tube flange and external piece.
Above-mentioned external piece is slip casting gland, valve or other orifice members.
Compared with prior art, advantage of the present utility model is as follows: 1, reinforcing mode is simple; 2, consolidation effect is remarkable; 3, processing and fabricating is easy, is convenient to field conduct.
Description of drawings:
Fig. 1 is the structural representation of embodiment 1;
Fig. 2 is the structural representation of the orifice tube flange of increasing;
Fig. 3 is the structural representation of embodiment 2;
Fig. 4 is the structural representation of embodiment 3.
Description of reference numerals is as follows:
The 1-orifice tube, 2-orifice tube flange, 3-reinforcing dish, 4-endoporus, the outer hole of 5-, 6-anchor pole, 7-backing plate, 8-anchor head nut, 9-external piece.
The specific embodiment:
Below in conjunction with drawings and Examples the utility model is done detailed description.
Embodiment 1, referring to Fig. 1 and Fig. 2.A kind of drilling orifice pipe bracing means, comprise orifice tube 1, the band mesopore girth member and external piece 9.The girth member of said band mesopore is meant the orifice tube flange 2 of the increasing that is welded in orifice tube 1 end, and said external piece 9 is slip casting glands.Be evenly equipped with the endoporus 4 that connects external piece 9 on week in the described orifice tube flange 2, be evenly equipped with the outer hole 5 of connection on the enlarged of periphery.Wear bolt in the endoporus 4 and connect, fixedly wear anchor pole 6 on the hole 5 outside with external piece 9, anchor pole 6 by backing plate 7 and anchor head nut 8 fixed orifice pipe flanges 2 in the boring country rock.
Creep into desired depth, afterbody has been welded with in 1 time hand-hole of orifice tube of orifice tube flange 2 of increasing, simple fixation is in boring after arriving the precalculated position, in the borehole wall country rock, squeeze into anchor pole 6 and anchoring by the outer hole 5 of the connection of orifice tube flange 2, backing plate 7 is passed anchor pole 6 to be flattened on outside the orifice tube flange 2, tighten anchor head nut 8 and prestressing force slightly, external piece 9 (being the slip casting gland this moment) and orifice tube flange 2 are linked together by endoporus 4 usefulness bolts.Adopt normal tube side method admittedly afterwards, the annular gap between grouting filling orifice tube 1 and the borehole wall, fixed orifice pipe 1 unload initial set slurries in the external piece 9 cleaning orifice tubes 1 after slurries tentatively solidify in borehole wall, and the solid plumber who promptly finishes orifice tube 1 does.Gu continue behind the duct ligation bundle to creep into to the target aquifer, arrive the precalculated position or when bore flooding quantity is excessive, withdraw from drilling rod, utilize bolt mounting holes mouth valve by endoporus 4.
In order to increase the anchorage length of anchor pole itself, anchor pole 6 oblique cuttings are in the boring country rock in the present embodiment.
Embodiment 2, referring to Fig. 3.A kind of drilling orifice pipe bracing means, the girth member and the external piece 9 that comprise orifice tube 1, band mesopore, said girth member is made up of reinforcing dish 3 and the orifice tube flange 2 that is welded in orifice tube 1 end, the diameter of reinforcing dish 3 is greater than orifice tube flange 2, be evenly equipped with endoporus 4 on week in the reinforcing dish 3, be evenly equipped with outer hole 5 on the enlarged of periphery, said external piece 9 is slip casting glands.Said reinforcing dish 3 uses bolts to connect with orifice tube flange 2 and external piece 9 by its endoporus 4, fixedly is equipped with anchor pole 6 on the hole 5 outside connecting, anchor pole 6 pass through backing plate 7 and anchor head nut 8 fixedly reinforcing dish 3 and orifice tube flange 2 in the country rock of holing.
Creep into desired depth, afterbody has been welded with precalculated position in 1 time hand-hole of orifice tube of orifice tube flange 2, and simple fixation is in boring, by endoporus 4 usefulness bolts reinforcing dish 3 and orifice tube flange 2 are fixedly connected, passing the outer hole 5 of connection of reinforcing dish 3 squeezes into anchor pole 6 and anchor pole is installed fixed putting in place in the boring country rock, backing plate 7 is passed anchor pole 6 be flattened on outside the reinforcing dish 3, tighten anchor head nut 8 and suitably apply prestressing force.Unclamp endoporus 4 bolts, external piece 9 is placed on the reinforcing dish 3, by endoporus 4 usefulness bolts external piece 9 and reinforcing dish 3, orifice tube flange 2 are fixedly connected again.Adopt normal tube side method admittedly afterwards, annular gap between grouting filling orifice tube 1 and the borehole wall, fixed orifice pipe 1 unloads initial set slurries in the external piece 9 cleaning orifice tubes 1 after slurries tentatively solidify in borehole wall, the solid plumber who promptly finishes fixed orifice tube 1 does.Gu continue behind the duct ligation bundle to creep into to the target aquifer, arrive the precalculated position or when bore flooding quantity is excessive, withdraw from drilling rod, utilize bolt mounting holes mouth valve by endoporus 4.
Embodiment 3, referring to Fig. 4.A kind of drilling orifice pipe bracing means, the girth member and the external piece 9 that comprise orifice tube 1, band mesopore, said girth member is made up of reinforcing dish 3 and the orifice tube flange 2 that is welded in orifice tube 1 end, the diameter of reinforcing dish 3 is greater than orifice tube flange 2, be evenly equipped with endoporus 4 on week in the reinforcing dish 3, be evenly equipped with outer hole 5 on the enlarged of periphery, said external piece 9 is valves.Said reinforcing dish 3 uses bolts to connect with orifice tube flange 2 and external piece 9 by its endoporus 4, fixedly is equipped with anchor pole 6 on the hole 5 outside connecting, anchor pole 6 pass through backing plate 7 and anchor head nut 8 fixedly reinforcing dish 3 and orifice tube flange 2 in the country rock of holing.
Creep into desired depth, withdraw from drilling tool, the stream that mixes is moulded shape cement ball to be dropped in the boring successively, firmly afterbody has been welded with orifice tube flange 2 and the top be precalculated position in 1 time hand-hole of orifice tube of blind pipe, the cement ball of drill tip is clamp-oned in the annular gap between orifice tube 1 and the hole wall and from the aperture returned out, reinforcing dish 3 and orifice tube flange 2 are fixedly connected by endoporus 4 usefulness bolts.Pass the outer hole 5 of connection of reinforcing dish 3 and squeeze into anchor pole 6 and anchor pole 6 is installed fixed putting in place in the boring country rock, backing plate 7 is passed anchor pole 6 be flattened on outside the reinforcing dish 3, tighten anchor head nut 8 and suitably apply prestressing force, the solid plumber who promptly finishes fixed orifice tube 1 does.Creep into to the target aquifer the back that thes cement solidifies in the annular gap, and arrives the precalculated position or withdraw from drilling rod when bore flooding quantity is excessive, utilizes bolt that external piece 9 is installed by endoporus 4.

Claims (6)

1, a kind of drilling orifice pipe bracing means, comprise orifice tube (1) and external piece (9), it is characterized in that: the girth member that between orifice tube (1) and external piece (9), is provided with the band mesopore, be evenly equipped with connection outer hole (5) on the described girth member periphery, hole (5) is gone up and fixedly is equipped with anchor pole (6) outside connecting.
2, a kind of drilling orifice pipe bracing means as claimed in claim 1, it is characterized in that: above-mentioned girth member is the orifice tube flange (2) of an increasing, be evenly equipped with the endoporus (4) that connects external piece (9) on the interior week of this orifice tube flange (2), be evenly equipped with connection outer hole (5) on the enlarged of periphery.
3, a kind of drilling orifice pipe bracing means as claimed in claim 2, it is characterized in that: described orifice tube flange (2) is directly welded in orifice tube (1) end.
4, a kind of drilling orifice pipe bracing means as claimed in claim 1, it is characterized in that: described girth member comprises orifice tube flange (2) and reinforcing dish (3), the diameter of described reinforcing dish (3) is greater than orifice tube flange (2), be evenly equipped with the endoporus (4) that connects aperture pipe flange (2) and external piece (9) on interior week of reinforcing dish (3), be evenly equipped with connection outer hole (5) on the periphery.
5, a kind of drilling orifice pipe bracing means as claimed in claim 4, it is characterized in that: described orifice tube flange (2) is directly welded in orifice tube (1) end, and reinforcing dish (3) is connected by bolt with orifice tube flange (2) and external piece (9).
6, as claim 3 or 5 described a kind of drilling orifice pipe bracing means, it is characterized in that: described external piece (9) is slip casting gland, valve or other orifice members.
CNU2008200293835U 2008-06-18 2008-06-18 Drill hole pipe reinforcing device Expired - Lifetime CN201218073Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200293835U CN201218073Y (en) 2008-06-18 2008-06-18 Drill hole pipe reinforcing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200293835U CN201218073Y (en) 2008-06-18 2008-06-18 Drill hole pipe reinforcing device

Publications (1)

Publication Number Publication Date
CN201218073Y true CN201218073Y (en) 2009-04-08

Family

ID=40540909

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200293835U Expired - Lifetime CN201218073Y (en) 2008-06-18 2008-06-18 Drill hole pipe reinforcing device

Country Status (1)

Country Link
CN (1) CN201218073Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102242635A (en) * 2011-07-20 2011-11-16 铜陵中都矿山建设有限责任公司 Embedding construction method of orifice pipe
CN102392661A (en) * 2011-10-13 2012-03-28 北京中铁瑞威基础工程有限公司 Grouting construction method for high pressure and rich water zone of tunnel and orifice pipe component
CN103032045A (en) * 2012-12-19 2013-04-10 玉溪大红山矿业有限公司 Plugging method and plugging device for high sub-level open draw shaft mouth
CN105041341A (en) * 2015-08-18 2015-11-11 山东大学 Hole opening sealing device used for static pressure permeating rotary grouting of drill hole and using method thereof
CN110260922A (en) * 2019-07-08 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Water burst drilling holes close monitoring of structures
CN111042138A (en) * 2019-12-13 2020-04-21 四川共拓岩土科技股份有限公司 Orifice tube device interactive fixing method
CN111827871A (en) * 2020-06-11 2020-10-27 冀中能源峰峰集团有限公司 Underground coal mine hydrological drilling construction system and construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102242635A (en) * 2011-07-20 2011-11-16 铜陵中都矿山建设有限责任公司 Embedding construction method of orifice pipe
CN102242635B (en) * 2011-07-20 2013-04-17 铜陵中都矿山建设有限责任公司 Embedding construction method of orifice pipe
CN102392661A (en) * 2011-10-13 2012-03-28 北京中铁瑞威基础工程有限公司 Grouting construction method for high pressure and rich water zone of tunnel and orifice pipe component
CN103032045A (en) * 2012-12-19 2013-04-10 玉溪大红山矿业有限公司 Plugging method and plugging device for high sub-level open draw shaft mouth
CN103032045B (en) * 2012-12-19 2015-05-13 玉溪大红山矿业有限公司 Plugging method and plugging device for high sub-level open draw shaft mouth
CN105041341A (en) * 2015-08-18 2015-11-11 山东大学 Hole opening sealing device used for static pressure permeating rotary grouting of drill hole and using method thereof
CN110260922A (en) * 2019-07-08 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Water burst drilling holes close monitoring of structures
CN110260922B (en) * 2019-07-08 2021-06-08 中国电建集团成都勘测设计研究院有限公司 Gush water drilling and seal monitoring structure
CN111042138A (en) * 2019-12-13 2020-04-21 四川共拓岩土科技股份有限公司 Orifice tube device interactive fixing method
CN111827871A (en) * 2020-06-11 2020-10-27 冀中能源峰峰集团有限公司 Underground coal mine hydrological drilling construction system and construction method
CN111827871B (en) * 2020-06-11 2022-10-25 冀中能源峰峰集团有限公司 Underground coal mine hydrological drilling construction system and construction method

Similar Documents

Publication Publication Date Title
CN201218073Y (en) Drill hole pipe reinforcing device
CN104747075B (en) Anti-collapsing drilling method for grout spraying of soft coal seam
CN101624910B (en) Method for reinforcing concealed tunnel
CN104141470B (en) The pore-forming molding method of underground coal mine fracturing borehole casing section
CN110130334B (en) Self-drilling high-pressure rotary-jetting bag grouting expanding anti-floating anchor rod construction method
CN203756203U (en) Self-drilling type full-thread bolt grouting anchor rod
CN102071961B (en) Downward gas drainage drill hole and pressure testing drill hole sealing method
CN201310362Y (en) Installing device of high pressure water burst drill hole bore pipe
CN103061785A (en) Borehole casing pressure-proof seepage sealing grouting device and process for roadway breaking water burst surrounding rock
CN104481580B (en) A kind of down-hole coal bed mash gas pumping drilling restorative procedure and the device of use thereof
CN105604593A (en) Three-stage anchoring combined type hollow grouting anchor rod
CN110439497A (en) Drill multistage closure, fracturing, slip casting, water filling integration apparatus and application method
CN102200002A (en) method and device for sealing upward hole at high pressure by sections
CN212723393U (en) Installation and recovery device for microseism sensor in tunnel
CN201129177Y (en) Drill rod back subsection grouting apparatus
CN113294189B (en) Grouting anchor rod
CN203702071U (en) Water inrush preventing drill ejecting device for water exploration and grouting construction of vertical shaft
CN215369773U (en) Freezing pipe orifice sealing device
CN206887949U (en) A kind of assembled pressure-adjustable enlarging anchor rod structure
CN101701505B (en) Sleeve pore-fixing device and method
CN201448488U (en) Back valve and steel tube equipped with the same
CN201310366Y (en) Aperture pipe for high hydraulic mud injection
CN206144587U (en) Odd -shaped cross section cavity self -drilling stock
CN103147777B (en) Pumping paste prestress full bolting anchor rod/cable supporting method
CN210315529U (en) Self-drilling high-pressure rotary-jetting bag grouting expanding anti-floating anchor rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: XI'AN RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY

Free format text: FORMER NAME: CHINA COAL TECHNOLOGY + ENGINEERING GROUP XI'AN RESEARCH INSTITUTE

Owner name: CHINA COAL TECHNOLOGY + ENGINEERING GROUP XI'AN RE

Free format text: FORMER NAME: SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 710054 No. 52, Yanta Road, Xi'an, Shaanxi

Patentee after: CCTEG Xi'an Research Institute

Address before: 710054 No. 52, Yanta Road, Xi'an, Shaanxi

Patentee before: Xi'an Research Institute Of China Coal Research Institute

Address after: 710054 No. 52, Yanta Road, Xi'an, Shaanxi

Patentee after: Xi'an Research Institute Of China Coal Research Institute

Address before: 710054 No. 52, Yanta Road, Xi'an, Shaanxi

Patentee before: Xi'an Branch of China Coal Research Institute

CX01 Expiry of patent term

Granted publication date: 20090408

CX01 Expiry of patent term