CN201215898Y - Backup auto-activating device having remote auto-activating function - Google Patents

Backup auto-activating device having remote auto-activating function Download PDF

Info

Publication number
CN201215898Y
CN201215898Y CNU2008200397586U CN200820039758U CN201215898Y CN 201215898 Y CN201215898 Y CN 201215898Y CN U2008200397586 U CNU2008200397586 U CN U2008200397586U CN 200820039758 U CN200820039758 U CN 200820039758U CN 201215898 Y CN201215898 Y CN 201215898Y
Authority
CN
China
Prior art keywords
station
interconnection
automatic switching
oneself willingly
activating device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200397586U
Other languages
Chinese (zh)
Inventor
金震
陆征军
陈志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
NR Engineering Co Ltd
Original Assignee
NR Electric Co Ltd
NR Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, NR Engineering Co Ltd filed Critical NR Electric Co Ltd
Priority to CNU2008200397586U priority Critical patent/CN201215898Y/en
Application granted granted Critical
Publication of CN201215898Y publication Critical patent/CN201215898Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model relates to an automatic switching device with the remotely automatic switching function, wherein the automatic switching device with the remotely automatic switching function is respectively collocated on an open-loop point converting station and a close-loop point converting station, and the switch-in analog quantity of each of the automatic switching devices is that the voltages and the like of two segments of busses of the station (I bus, II bus ), the switch-in switching value of each of the automatic switching devices is that the station incoming line (1), an interconnection, a tripping position joint (TWJ) of a section switch, a closing position joint (KKJ) of the section switch and the like, two line voltages (U*1, U*2) of the interconnection are used as the auxiliary criterion of the automatic switching devices and the actions, the tripping position joint (TWJ) which is accessed into the section switch is used for judging the system operating mode, the automatic switching devices and the actions, and the closing position joint (KKJ) which is assessed into the section switch is used as the locking spare power automatic switching when switching the working power supply manually. The proposal can realize the automatic switching of normal standby power supplies, can realize the remotely automatic switching, and can really realize the mutual standby of the two converting stations through the interconnection.

Description

Have a distant place and haul oneself willingly into the backup auto-activating device of function
Technical field
The utility model relates to a kind of automatic switching device of electric power system power transmission and distribution, particularly relates to a kind of microcomputer type automatic switching device of standby power supply.
Background technology
In recent years, backup auto-activating device is used widely in 220kV and following grade power grids, has played the important function of the protection stabilization of power grids and raising power supply reliability.Common prepared auto restart divides inlet wire to be equipped with throwing and two big classes are hauled oneself willingly in segmentation.Inlet wire is equipped with throwing and all is mounted in open loop point transformer station, splits the switch of circling point stand-by heat and realize fast automatic input when the working power dead electricity, realizes stand-by power supply restoring electricity to this station.Yet the transformer station at the offside cyclization point place of open loop point stand-by power supply, when its working power dead electricity, conventional backup auto-activating device can't recover the power supply to this station.That is to say, if realize that with conventional backup auto-activating device standby each other with two continuous transformer stations of interconnection is impracticable, conventional backup auto-activating device can only be realized cyclization point transformer station standby as open loop point transformer station, and can not realize open loop point transformer station standby as cyclization point transformer station.
Summary of the invention
For two purposes that transformer station is standby each other that can realize linking to each other with interconnection, the utility model provides a kind of backup auto-activating device that function is hauled oneself willingly in a distant place that has, and can realize conventional automatic closing function, can realize that again a distant place hauls oneself willingly into function.
The technical solution of the utility model is: have the backup auto-activating device that function is hauled oneself willingly in a distant place, dispose one respectively in open loop point transformer station and cyclization point transformer station and have the backup auto-activating device that function is hauled oneself willingly in a distant place, every backup auto-activating device inserts analog quantity and is: voltage mother I, mother II of two sections buses of our station, the line voltage distribution of our station inlet wire 1 and interconnection, each phase current of our station inlet wire 1 and interconnection; The switching value that every backup auto-activating device inserts is: the trip position contact TWJ of our station inlet wire 1, interconnection and block switch and block switch close back position contact KKJ, receive the offside station close a floodgate order open into, locking prepared auto restart open into;
Insert two sections busbar voltage mothers I of our station, mother II, be used to that pressure is arranged, do not have to press and differentiate; Insert inlet wire 1, interconnection two line voltage distribution Ux1, Ux2 as hauling oneself willingly into the assistant criteria of preparing and moving; Insert the trip position contact TWJ of 1DL, 2DL, 3DL block switch, be used for system operation mode and differentiate, haul oneself willingly into and prepare and action; Locking prepared auto restart when inserting the back position contact KKJ of closing of 1DL, 2DL, 3DL block switch as hand jumping working power.
The transmission of the permission combined floodgate order that haul oneself willingly in a realization distant place can realize by the existing pilot protection passage of electric power system, does not increase extra passage investment cost.
According to the block switch that inserts and the position of two service entrance switchs, two sections busbar voltages, backup auto-activating device can the current operational mode of automatic recognition system, can realize that when the working power dead electricity a conventional automatic closing and a distant place haul oneself willingly into.Conventional automatic closing comprises that inlet wire is thrown dual mode fully and dual mode is hauled oneself willingly in segmentation.
Mode is hauled oneself willingly in a realization distant place: the backup auto-activating device of cyclization point transformer station is after charging under system's normal condition is finished, when work inlet wire dead electricity, prepared auto restart action jumping work service entrance switch, send out an order that allows combined floodgate to the backup auto-activating device of open loop point transformer station then, after the backup auto-activating device of open loop point transformer station is received this order, adding the stand-by power supply circuit of declaring open loop point does not again have the switch of running the circling point stand-by heat after the pressure jointly, restores electricity for offside cyclization point transformer station.
The prepared auto restart mode of the routine that the utility model is realized has four kinds, and a distant place has been hauled oneself willingly into two kinds, has six kinds of modes.Haul oneself willingly into the mode backup auto-activating device for these six kinds and all can discern automatically, can not obscure.The backup auto-activating device of cyclization point transformer station is after charging under system's normal condition is finished, and when work inlet wire dead electricity, prepared auto restart action jumping work service entrance switch is sent out an order that allows combined floodgate to the backup auto-activating device of open loop point transformer station then.After the backup auto-activating device of open loop point transformer station is received this order, add the stand-by power supply circuit of declaring open loop point again and do not have pressure, then the switch of circling point stand-by heat is run in action jointly, restores electricity so just for offside cyclization point transformer station, has realized the standby functions of open loop point transformer station as cyclization point transformer station.The transmission of ordering that allows to close a floodgate can realize by the existing pilot protection passage of electric power system, does not increase extra passage investment cost.If current conditions do not possess channel transfer, after then the backup auto-activating device of open loop point transformer station is declared the stand-by power supply circuit and do not had pressure (think offside cyclization point transformer station dead electricity), run the switch of circling point jointly through certain time-delay.
The beneficial effects of the utility model are, have a distant place and haul oneself willingly into the automatic closing function that the backup auto-activating device of function can be realized routine, can realize that again a distant place hauls oneself willingly into function, can discern the current operational mode of electric power system automatically according to the switching value and the analog quantity that insert, when the working power dead electricity, haul oneself willingly into the mode correct operation accordingly, realized that really two transformer stations that link to each other with interconnection are standby each other.Realized really that promptly two transformer stations are standby mutually by interconnection, the combined floodgate order that transmission is hauled oneself willingly in a distant place can utilize existing pilot protection passage to realize, reduces investment outlay.
Description of drawings
Fig. 1 is the utility model system main wiring diagram.
Fig. 2 is four kinds of conventional prepared auto restart mode logic diagrams.
Fig. 3 is the logic diagram that dual mode is hauled oneself willingly in a distant place.
Embodiment
In two transformer stations shown in Figure 1, dispose one respectively and have the backup auto-activating device that function is hauled oneself willingly in a distant place, every backup auto-activating device need insert analog quantity to be had: the voltage of two sections buses of our station, the line voltage distribution of our station inlet wire 1 and interconnection, each phase current of our station inlet wire 1 and interconnection.The insertion switch amount has: the position of our station inlet wire 1, interconnection and block switch 3DL (comprise trip position contact TWJ and close back position contact KKJ), receive the offside station close a floodgate order open into, locking prepared auto restart open into or the like.
Introduce two sections busbar voltage mothers I, mother II, be used to that pressure is arranged, do not have to press and differentiate.Introduce inlet wire 1, interconnection two line voltage distribution Ux1, Ux2 as hauling oneself willingly into the assistant criteria of preparing and moving.Introducing inlet wire 1, interconnection two inlet wires each a phase current I1, I2, is to cause the prepared auto restart misoperation in order to prevent behind the bus VT three-phase broken string, also is in order better to confirm whether tripping of service entrance switch.Introduce the trip position contact TWJ of 1DL, 2DL, 3DL block switch, be used for system operation mode and differentiate, haul oneself willingly into and prepare and action.Introducing the back position contact KKJ (attracting from the switching manipulation loop) of closing of 1DL, 2DL, 3DL block switch, is for locking prepared auto restart when hand is jumped working power.
Fig. 2 is four kinds of conventional prepared auto restart mode logic diagrams, hauls oneself willingly into mode 1,2 and throws for inlet wire is equipped with, and hauls oneself willingly into mode 3,4 and hauls oneself willingly into for segmentation.
Haul oneself willingly into mode 1: inlet wire 1 operation, interconnection stand-by heat.
Charge condition:
1) mother I, mother II all have pressure, and when inspection circuit 2 voltage control words dropped into, the interconnection circuit had pressure;
2) 1DL, 3DL are closing the position, and 2DL is in a minute position.
Satisfy above condition simultaneously, after certain time-delay (15 seconds), charge and finish.
Discharging condition:
1) when inspection circuit 2 voltage control words dropped into, the interconnection circuit did not have pressure, discharges through certain time-delay (15 seconds);
2) 2DL closes;
3) hand is jumped 1DL or 3DL;
4) other outside block signals open into;
5) TWJ of 1DL, 2DL or 3DL is unusual;
6) the 1DL switch is refused to jump.
Course of action:
After charging was finished, two buses did not all have pressure, inlet wire 1 and do not have stream, the interconnection circuit has pressure (when inspection circuit 2 voltage control words drop into), jump into line 1 switch through time-delay, confirm the 1DL tripping after the interconnection switch is closed in time-delay.
Haul oneself willingly into mode 2: interconnection operation, inlet wire 1 stand-by heat.
Charge condition:
1) mother I, mother II all have pressure, and when inspection circuit 1 voltage control word dropped into, inlet wire 1 circuit had pressure;
2) 2DL, 3DL are closing the position, and 1DL is in a minute position.
Satisfy above condition simultaneously, after certain time-delay (15 seconds), charge and finish.
Discharging condition:
1) when inspection circuit 1 voltage control word dropped into, inlet wire 1 circuit did not have pressure, discharges through certain time-delay (15 seconds);
2) 1DL closes;
3) hand is jumped 2DL or 3DL;
4) other outside block signals open into;
5) TWJ of 1DL, 2DL or 3DL is unusual;
6) the 2DL switch is refused to jump.
Course of action:
After charging was finished, two buses did not all have pressure, interconnection and do not have stream, inlet wire 1 circuit has pressure (when inspection circuit 1 voltage control word drops into), jump the interconnection switch through time-delay, confirm the 2DL tripping after inlet wire 1 switch is closed in time-delay.
Haul oneself willingly into mode 3,4: two sections bus fanout operations, two sections buses are standby each other.
Charge condition:
1) mother I, mother II all have pressure;
2) 1DL, 2DL are closing the position, and 3DL is in a minute position.
Satisfy above condition simultaneously, after certain time-delay (15 seconds), charge and finish.
Discharging condition:
1) 3DL is closing the position;
2) two buses all do not have pressure, time-delay 15s discharge;
3) hand is jumped 1DL or 2DL;
4) other outside block signals open into;
5) TWJ of 1DL, 2DL or 3DL is unusual;
6) related switch is refused to jump.
Haul oneself willingly into the course of action of mode 3:
After charging was finished, the female nothing of I was pressed, inlet wire 1 does not have stream, mother II has pressure, jumps into line 1 switch through time-delay, confirms the 1DL tripping after delay time and closes block switch.
Haul oneself willingly into the course of action of mode 4:
After charging was finished, the female nothing of II was pressed, interconnection does not have stream, mother I has pressure, jumps the interconnection switch through time-delay, confirms the 2DL tripping after delay time and closes block switch.
Fig. 3 is the logic diagram that haul oneself willingly in a distant place, is divided into the mode of hauling oneself willingly into 5,6, and cyclization point transformer station adopts the mode 5 of hauling oneself willingly into, and open loop point transformer station adopts the mode 6 of hauling oneself willingly into.After the working power dead electricity of cyclization point transformer station, haul oneself willingly into mode 5 actions and jump the working power switch, send out one to open loop point transformer station prepared auto restart afterwards and allow the order of closing a floodgate.The backup auto-activating device of open loop point transformer station receives that permission that offside cyclization point transformer station sends closes a floodgate after the order, add again and declare this side interconnection circuit and do not have pressure, run the interconnection switch of circling point jointly through time-delay, so just realized restoring electricity of involutory circling point transformer station of open loop point transformer station.
Haul oneself willingly into mode 5: cyclization point transformer station prepared auto restart moves when the working power dead electricity.
Charge condition:
1) mother I, mother II all have pressure;
2) 1DL, 2DL, 3DL are all closing the position.
Satisfy above condition simultaneously, after certain time-delay (15 seconds), charge and finish.
Discharging condition:
1) hand is jumped 1DL or 3DL;
2) 2DL is in a minute position;
3) other outside block signals open into;
4) TWJ of 1DL, 2DL or 3DL is unusual;
5) the 1DL switch is refused to jump.
Course of action:
After charging was finished, two mothers did not all have pressure, inlet wire 1 nothing stream, jump into line 1 switch through time-delay, confirmed to send out the order of permission combined floodgate for the prepared auto restart of offside open loop point transformer station after the 1DL tripping.
Haul oneself willingly into mode 6: open loop point transformer station prepared auto restart moves after receiving the combined floodgate order that cyclization point transformer station is transmitted.
Charge condition:
1) mother II has pressure, and the interconnection circuit has pressure;
2) 2DL is in a minute position.
Satisfy above condition simultaneously, after certain time-delay (15 seconds), charge and finish.
Discharging condition:
1) the female nothing of II is pressed, time-delay 15S;
2) 2DL closes;
3) other outside block signals open into;
4) TWJ of 2DL is unusual;
Course of action:
After charging was finished, mother II had pressure, interconnection circuit not to have pressure, received the permission combined floodgate order that offside cyclization point transformer station is transmitted simultaneously, closed the interconnection switch through time-delay.
If the scene does not possess the permission combined floodgate order that channel transfer cyclization point transformer station prepared auto restart sends, then can set and haul oneself willingly into mode 6 and do not add to declare and receiving the order of closing a floodgate by the control word of adjusting, after only declaring mother II and having pressure, interconnection circuit not to have pressure, run circling point interconnection switch jointly through time-delay.Like this, if interconnection generation permanent fault, the open loop point transformer station prepared auto restart open loop point interconnection switch of also joining, at this moment protection acceleration tripping that just must dependence interconnection switch.In addition, for fear of running circling point interconnection switch jointly when interconnection circuit VT broken string mistiming, the contact that available interconnection circuit VT broken string is associated goes locking to haul oneself willingly into mode 6.So want to realize that by interconnection two transformer stations are standby each other, the order that preferably will have channel transfer to allow to close a floodgate realizes that a distant place hauls oneself willingly into, and is more reliable like this, safer.

Claims (2)

1. have a distant place and haul oneself willingly into the backup auto-activating device of function, dispose one respectively in open loop point transformer station and cyclization point transformer station and have the backup auto-activating device that function is hauled oneself willingly in a distant place, it is characterized in that every backup auto-activating device inserts analog quantity and is: the voltage of two sections buses of our station (mother I, mother II), the line voltage distribution of our station inlet wire (1) and interconnection, each phase current of our station inlet wire (1) and interconnection; The switching value that every backup auto-activating device inserts is: the trip position contact (TWJ) of our station inlet wire (1), interconnection and block switch and block switch close back position contact (KKJ), receive the offside station close a floodgate opening of ordering into, locking prepared auto restart open into; Insert two sections busbar voltages of our station (mother I, mother II), be used to that pressure is arranged, do not have to press and differentiate; Insert our station inlet wire (1), two line voltage distributions of interconnection (Ux1, Ux2) as hauling oneself willingly into the assistant criteria of preparing and moving; Insert the trip position contact (TWJ) of block switch (1DL, 2DL, 3DL), be used for system operation mode and differentiate, haul oneself willingly into and prepare and action; Insert locking prepared auto restart when afterwards position contact (KKJ) is jumped working power as hand that closes of block switch (1DL, 2DL, 3DL).
2. according to claim 1 have a backup auto-activating device that function is hauled oneself willingly in a distant place, it is characterized in that having the backup auto-activating device of hauling oneself willingly into function in a distant place and realize the permission of hauling oneself willingly in the distant place order of closing a floodgate in the existing pilot protection channel transfer of electric power system.
CNU2008200397586U 2008-06-27 2008-06-27 Backup auto-activating device having remote auto-activating function Expired - Lifetime CN201215898Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200397586U CN201215898Y (en) 2008-06-27 2008-06-27 Backup auto-activating device having remote auto-activating function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200397586U CN201215898Y (en) 2008-06-27 2008-06-27 Backup auto-activating device having remote auto-activating function

Publications (1)

Publication Number Publication Date
CN201215898Y true CN201215898Y (en) 2009-04-01

Family

ID=40521104

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200397586U Expired - Lifetime CN201215898Y (en) 2008-06-27 2008-06-27 Backup auto-activating device having remote auto-activating function

Country Status (1)

Country Link
CN (1) CN201215898Y (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917056A (en) * 2010-08-16 2010-12-15 广东省电力调度中心 220kV bus switch spare automatic switching method of 550kV station
CN102033181A (en) * 2010-11-25 2011-04-27 河南省电力公司洛阳供电公司 Portable spare power automatic switching calibrator
CN102097856A (en) * 2011-01-18 2011-06-15 北京四方继保自动化股份有限公司 Spare power automatic switching programmable logic control method for plant supply of power station
CN102522815A (en) * 2012-01-09 2012-06-27 云南电力试验研究院(集团)有限公司电力研究院 Automatic switching method of intelligent inter-station remote backup power supply
CN102545376A (en) * 2012-02-02 2012-07-04 贵州电网公司电网规划研究中心 Spare power automatic switching system for 220 KV line faults
CN104333125A (en) * 2014-11-26 2015-02-04 国网宁夏电力公司固原供电公司 Long-distance automatic stand-by power switching device
CN104868454A (en) * 2015-06-12 2015-08-26 国家电网公司 Backup power supply switchover protective system
CN104977546A (en) * 2015-06-29 2015-10-14 广东电网有限责任公司江门供电局 Secondary direct-current power source loss discriminating method for substations
CN105244992A (en) * 2015-09-01 2016-01-13 云南电网有限责任公司大理供电局 Remote backup power supply automatic switching method and system
CN105322645A (en) * 2015-12-06 2016-02-10 江苏省电力公司宿迁供电公司 Call wire bi-directional backup system
CN105703476A (en) * 2016-04-08 2016-06-22 国家电网公司 Emergency power supply automatic switch-in device
CN109245101A (en) * 2018-11-13 2019-01-18 国网四川省电力公司天府新区供电公司 The method for promoting statements based on collusion substation's power supply reliability
CN112865283A (en) * 2021-01-12 2021-05-28 国网山东省电力公司邹城市供电公司 Spare power automatic switching device and method for internal bridging type transformer substation
CN113357695A (en) * 2021-06-04 2021-09-07 贵州中毅达科技有限公司 Implementation method of electric heater with multiple systems

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917056B (en) * 2010-08-16 2012-12-12 广东省电力调度中心 220kV bus switch spare automatic switching method of 550kV station
CN101917056A (en) * 2010-08-16 2010-12-15 广东省电力调度中心 220kV bus switch spare automatic switching method of 550kV station
CN102033181A (en) * 2010-11-25 2011-04-27 河南省电力公司洛阳供电公司 Portable spare power automatic switching calibrator
CN102033181B (en) * 2010-11-25 2014-09-10 河南省电力公司洛阳供电公司 Portable spare power automatic switching calibrator
CN102097856A (en) * 2011-01-18 2011-06-15 北京四方继保自动化股份有限公司 Spare power automatic switching programmable logic control method for plant supply of power station
CN102522815A (en) * 2012-01-09 2012-06-27 云南电力试验研究院(集团)有限公司电力研究院 Automatic switching method of intelligent inter-station remote backup power supply
CN102545376A (en) * 2012-02-02 2012-07-04 贵州电网公司电网规划研究中心 Spare power automatic switching system for 220 KV line faults
CN104333125A (en) * 2014-11-26 2015-02-04 国网宁夏电力公司固原供电公司 Long-distance automatic stand-by power switching device
CN104868454A (en) * 2015-06-12 2015-08-26 国家电网公司 Backup power supply switchover protective system
CN104868454B (en) * 2015-06-12 2018-09-18 国家电网公司 Automatic closing protects system
CN104977546B (en) * 2015-06-29 2018-01-16 广东电网有限责任公司江门供电局 A kind of Secondary Direct Electrical Resources towards transformer station lose method of discrimination
CN104977546A (en) * 2015-06-29 2015-10-14 广东电网有限责任公司江门供电局 Secondary direct-current power source loss discriminating method for substations
CN105244992A (en) * 2015-09-01 2016-01-13 云南电网有限责任公司大理供电局 Remote backup power supply automatic switching method and system
CN105322645A (en) * 2015-12-06 2016-02-10 江苏省电力公司宿迁供电公司 Call wire bi-directional backup system
CN105703476A (en) * 2016-04-08 2016-06-22 国家电网公司 Emergency power supply automatic switch-in device
CN105703476B (en) * 2016-04-08 2019-01-11 国家电网公司 A kind of automatic throw-in equipment of emergency power supply
CN109245101A (en) * 2018-11-13 2019-01-18 国网四川省电力公司天府新区供电公司 The method for promoting statements based on collusion substation's power supply reliability
CN109245101B (en) * 2018-11-13 2022-03-11 国网四川省电力公司天府新区供电公司 Method for improving power supply reliability of series-supply transformer substation
CN112865283A (en) * 2021-01-12 2021-05-28 国网山东省电力公司邹城市供电公司 Spare power automatic switching device and method for internal bridging type transformer substation
CN112865283B (en) * 2021-01-12 2022-07-26 国网山东省电力公司邹城市供电公司 Spare power automatic switching device and method for internal bridge connection type transformer substation
CN113357695A (en) * 2021-06-04 2021-09-07 贵州中毅达科技有限公司 Implementation method of electric heater with multiple systems

Similar Documents

Publication Publication Date Title
CN201215898Y (en) Backup auto-activating device having remote auto-activating function
CN101552489B (en) Method for controlling automatic operation of standby power by microcomputer of inner bridge and single bus connection
CN101917056B (en) 220kV bus switch spare automatic switching method of 550kV station
CN103094951A (en) Charge-and-discharge connector and a vehicle in which charge and discharge are possible through the charge-and-discharge connector
CN101436787B (en) Method for automatically devoting microcomputer control standby power for enlarging inner bridge wire splice
CN104319871B (en) Transformer station domain island protection and backup automatic switching integrated method
CN109995024A (en) A kind of multistage power grid collaboration self-healing system and self-healing method
CN105244992A (en) Remote backup power supply automatic switching method and system
CN204481568U (en) A kind of power plant is standby throws protective device
CN107206906A (en) High-tension battery and motor vehicle for motor vehicle
CN103618376A (en) Main change protection locking spare power automatic switching improving method
CN102222901A (en) Sequence control process for modular multi-level flexible direct-current transmission system control equipment
CN109245101A (en) The method for promoting statements based on collusion substation's power supply reliability
CN102064599A (en) Method for controlling mutual-control spare power automatic switching device based on two substations and three wires
CN104467163A (en) Fragmented spare power automatic switching implementation method for multiple power incoming lines
CN110601350B (en) High-voltage self-adaptive regional automatic switching system and automatic switching control method thereof
CN102436971A (en) Remote control on-off reclosing relay
CN104485732A (en) In-put control method for standby powers of transformer substations
CN100466415C (en) Method for automatic putting new type backup power source into use under PC control
CN103280880A (en) Decoupling control method for controlling backup power supply automatic switching by expansion inner bridge microcomputer
CN102437545B (en) Reclosing remote putting on/off relay
CN102545376A (en) Spare power automatic switching system for 220 KV line faults
CN201616705U (en) Backup auto-activating device
CN201608538U (en) Automatic switching device of spare transformer under economical operation of power distribution station
CN102403783A (en) Method for automatically switching in microcomputer control standby power supply of expanded inner bridge connection line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090401