CN201215443Y - Ceramic hanging board for inner barrel of preheater cyclone barrel - Google Patents

Ceramic hanging board for inner barrel of preheater cyclone barrel Download PDF

Info

Publication number
CN201215443Y
CN201215443Y CNU2008200710119U CN200820071011U CN201215443Y CN 201215443 Y CN201215443 Y CN 201215443Y CN U2008200710119 U CNU2008200710119 U CN U2008200710119U CN 200820071011 U CN200820071011 U CN 200820071011U CN 201215443 Y CN201215443 Y CN 201215443Y
Authority
CN
China
Prior art keywords
hanging
link plate
arm
hanging plate
ceramic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200710119U
Other languages
Chinese (zh)
Inventor
贾剑光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LUOYANG PENGFEI WEAR-RESISTANT MATERIALS LIMITED BY SHARE LTD.
Original Assignee
贾剑光
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 贾剑光 filed Critical 贾剑光
Priority to CNU2008200710119U priority Critical patent/CN201215443Y/en
Application granted granted Critical
Publication of CN201215443Y publication Critical patent/CN201215443Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Furnace Details (AREA)

Abstract

A ceramic hanging plate for the inner drum of preheater cyclone collector is composed of a hanging plate body and a fixing rod, wherein the left and right sides of the top end and the bottom end of the hanging plate body are provided with hanging plate arms connected with the hanging plate body, the hanging plate arms are respectively provided with a hanging arm hole connected with the another hanging plate arm, the hanging arm hole is provided with the fixing rod internally for connecting and fixing the two corresponding hanging plate arms integrally. The ceramic hanging plates are assembled tightly, having reliable connection and eliminated detachment, to overcome the unreliable connection defect of prior ceramic hanging plate, therefore, the ceramic hanging plate can replace alloy steel to obtain wide application, to reduce production cost.

Description

The ceramic hanging board that internal barrel of preheater cyclone barrel is used
Technical field
The utility model relates to a kind of wear-resistant ceramic link plate, the ceramic hanging board that a kind of specifically internal barrel of preheater cyclone barrel is used.
Technical background
At present, link plate in the cement kiln preheaters, mostly be the special alloy steel plate of heat-resistant antifriction greatly, this steel plate, price height, life-span weak point, increased the production cost of enterprise greatly, be unfavorable for the long-run development of enterprise, the service life that replaces steel alloy can improve link plate with ceramic hanging board, and can significantly reduce cost, but can't weld as steel alloy between the ceramic hanging board, cause connecting not firm, easily come off, therefore hindered it and used widely, pressing for provides a kind of ceramic hanging board of can close-connected internal barrel of preheater cyclone barrel using.
The utility model content
The purpose of this utility model is the deficiency for solving the problems of the technologies described above, the ceramic hanging board that provides a kind of internal barrel of preheater cyclone barrel to use, it is as a whole that it can closely be connected and fixed, and difficult drop-off, to improve the service life of internal barrel of preheater cyclone barrel, reduce production costs.
The utility model is the deficiency that solves the problems of the technologies described above, the technical scheme that is adopted is: be made up of link plate body and hold-down bars, the top of link plate body and the left and right sides, bottom are provided with the link plate arm, the link plate arm links to each other with the link plate body, on the link plate arm, be respectively equipped with the hanging arm hole that can be connected with another link plate, be provided with hold-down bars in hanging arm hole, hold-down bars is connected and fixed two corresponding link plate arms as a whole.
The utility model, described hanging arm hole, the degree of depth of last hanging arm hole is greater than the degree of depth of following hanging arm hole.
The utility model, the length of described hold-down bars be less than the degree of depth of last hanging arm hole, and greater than the degree of depth of hanging arm hole down.
The utility model, the distance between upper hanging plate arm and the following link plate arm is more than or equal to two summations of hanging the arm height.
The utility model, its using method is:
Get link plate body A, B, the C of three ceramic hanging boards, earlier hold-down bars is placed respectively in the last hanging arm hole on link plate body B left side and link plate body C right side, again the end face of the upper hanging plate arm of link plate body C is docked with the bottom surface of the following link plate arm of link plate body A between the arm of link plate up and down of back embedding link plate body B; Make the hanging arm hole on the link plate arm that is in contact with one another of link plate body B and link plate body A, C corresponding then, hold-down bars loses support and drops down onto in the following hanging arm hole of corresponding link plate body A, B in the last hanging arm hole of link plate body B, C respectively, make link plate body A, B, the C of three ceramic hanging boards of its butt joint interconnect fixing, connect ceramic hanging board in a manner described, until covering whole wall.
The beneficial effects of the utility model are:
1, splicing is tight between the ceramic hanging board, and it is firm to connect, difficult drop-off.
2, overcome ceramic hanging board and connected illusive shortcoming, made ceramic hanging board can replace steel alloy to be widely used.
3, make ceramic hanging board can replace steel alloy, greatly reduce the production cost of enterprise, improved Enterprises'Competitiveness.
Description of drawings
Fig. 1 is the profile of the utility model link plate body.
Fig. 2 is the vertical view of the utility model link plate body.
Fig. 3 is the schematic diagram of the utility model hold-down bars.
Fig. 4 is a connection diagram of the present utility model.
Mark among the figure: 1, link plate body, 2, hold-down bars, 3, the upper hanging plate arm, 4, link plate arm down, 5, go up hanging arm hole, 6, hanging arm hole down.
The specific embodiment
As shown in Figure 1, 2, the top of link plate body 1 and the left and right sides, bottom are provided with the link plate arm, the link plate arm links to each other with link plate body 1, on the link plate arm, be respectively equipped with the hanging arm hole that can be connected with another link plate, the degree of depth of last hanging arm hole 5 is greater than the degree of depth of following hanging arm hole 6, the length of hold-down bars 2 is less than the degree of depth of last hanging arm hole 5, and greater than the degree of depth of descending hanging arm hole 6, the distance between upper hanging plate arm 3 and the following link plate arm 4 equals two summations of hanging the arm height.
As shown in Figure 4, A, B, C are the link plate body of three ceramic hanging boards, the end face of the upper hanging plate arm 3 of link plate body C with just embed between the upper hanging plate arm 3 and following link plate arm 4 of link plate body B after dock the bottom surface of the following link plate arm 4 of link plate body A, hanging arm hole on the link plate arm that three ceramic hanging boards are in contact with one another is corresponding, the following link plate arm 4 of the link plate arm of link plate body B and link plate body A and the upper hanging plate arm 3 of link plate body C are connected and fixed as a wholely by being arranged on hold-down bars 2 in the hanging arm hole, make link plate body A, B, the C of three ceramic hanging boards interconnect fixing.

Claims (4)

1, the ceramic hanging board used of a kind of internal barrel of preheater cyclone barrel, it is characterized in that: form by link plate body (1) and hold-down bars (2), the top and the left and right sides, bottom of link plate body (1) are provided with the link plate arm, the link plate arm links to each other with link plate body (1), on the link plate arm, be respectively equipped with the hanging arm hole that can be connected with another link plate arm, be provided with hold-down bars (2) in hanging arm hole, hold-down bars (2) is connected and fixed two corresponding link plate arms as a whole.
2, the ceramic hanging board used of a kind of internal barrel of preheater cyclone barrel according to claim 1 is characterized in that: described hanging arm hole, the degree of depth of last hanging arm hole (5) is greater than the degree of depth of hanging arm hole (6) down.
3, the ceramic hanging board used of a kind of internal barrel of preheater cyclone barrel according to claim 1 is characterized in that: the length of described hold-down bars (2) is less than the degree of depth of last hanging arm hole (5), and greater than the degree of depth of hanging arm hole (6) down.
4, the ceramic hanging board used of a kind of internal barrel of preheater cyclone barrel according to claim 1, it is characterized in that: the distance between upper hanging plate arm (3) and the following link plate arm (4) is more than or equal to the summation of two link plate arm height.
CNU2008200710119U 2008-06-06 2008-06-06 Ceramic hanging board for inner barrel of preheater cyclone barrel Expired - Lifetime CN201215443Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200710119U CN201215443Y (en) 2008-06-06 2008-06-06 Ceramic hanging board for inner barrel of preheater cyclone barrel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200710119U CN201215443Y (en) 2008-06-06 2008-06-06 Ceramic hanging board for inner barrel of preheater cyclone barrel

Publications (1)

Publication Number Publication Date
CN201215443Y true CN201215443Y (en) 2009-04-01

Family

ID=40520647

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200710119U Expired - Lifetime CN201215443Y (en) 2008-06-06 2008-06-06 Ceramic hanging board for inner barrel of preheater cyclone barrel

Country Status (1)

Country Link
CN (1) CN201215443Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103424000A (en) * 2013-08-20 2013-12-04 中材建设有限公司 Ceramic inner cylinder of preheater

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103424000A (en) * 2013-08-20 2013-12-04 中材建设有限公司 Ceramic inner cylinder of preheater
CN103424000B (en) * 2013-08-20 2015-12-09 中材建设有限公司 A kind of ceramic inner barrel of preheater

Similar Documents

Publication Publication Date Title
CN201215443Y (en) Ceramic hanging board for inner barrel of preheater cyclone barrel
CN202864692U (en) Single carbon block clamp with adjusting device
CN101298960B (en) Ceramic suspending board for internal barrel of preheater cyclone barrel and connection method thereof
CN206847400U (en) Ceramic product holds buck
CN205836871U (en) A kind of brickmaking fragment of brick transport trolleys
CN208347118U (en) A kind of double thermal insulation color steel plate
CN210973655U (en) Street lamp installation equipment
CN202692710U (en) Inner cylinder hanging board with reinforcing rib on edge for preheater
CN201008968Y (en) Internal lining construction of torpedo pot
CN201406185Y (en) Pentagonal scraper
CN204096928U (en) A kind of main beam of gantry crane
CN201046621Y (en) Titanium-steel clad plate
CN201697476U (en) Sagger
CN201534822U (en) Ceramic inner cylinder of preheater cyrclone
CN202382636U (en) Heat exchanger tube plate
CN202692711U (en) Preheater inner barrel hanging plate with transverse reinforcing ribs
CN206847399U (en) Ceramic product holds burning device
CN204286098U (en) A kind of hanger brick
CN205403472U (en) Walking beam of energy -conserving heating furnace
CN202882169U (en) Novel connection structure of prefabricated light clapboards
CN218289493U (en) Coal gangue baked brick handling device
CN201192263Y (en) Card connection type electromagnetic heating container
CN201128764Y (en) Grooving structure for electrolytic cell lining side block
CN202988566U (en) Single carbon block clamp with friction pad
CN202992397U (en) Novel combined cable hanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Siping Pengfei refractory wear-resistant materials Co.

Assignor: Jia Jianguang

Contract fulfillment period: 2009.11.11 to 2018.6.3

Contract record no.: 2009410000265

Denomination of utility model: Ceramic suspending board for internal barrel of preheater cyclone barrel and connection method thereof

Granted publication date: 20090401

License type: Exclusive license

Record date: 20091207

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.11.11 TO 2018.6.3; CHANGE OF CONTRACT

Name of requester: SIPING PENGFEI FIRE-RESISTANT + ABRASION-PROOF MAT

Effective date: 20091207

ASS Succession or assignment of patent right

Owner name: LUOYANG PENGFEI REFRACTORY AND WEAR RESISTANT MATE

Free format text: FORMER OWNER: JIA JIANGUANG

Effective date: 20110801

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 471000 LUOYANG, HENAN PROVINCE TO: 471013 LUOYANG, HENAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110801

Address after: 471013 Henan city in Luoyang Province town of Luolong District of Luoyang temple white hat Guo Village North Pengfei refractory wear-resistant materials Co.

Patentee after: Luoyang Pengfei Refractory and Wear Resistant Materials Co., Ltd.

Address before: 471000 Henan city in Luoyang Province town of Luolong District of Luoyang temple white hat Guo Village North Pengfei Refractory Material Co Ltd

Patentee before: Jia Jianguang

C56 Change in the name or address of the patentee

Owner name: LUOYANG PENGFEI WEAR-RESISTANT MATERIALS CO., LTD.

Free format text: FORMER NAME: LUOYANG PENGFEI REFRACTORY AND WEAR RESISTANT MATERIALS CO., LTD.

CP03 Change of name, title or address

Address after: 471200 Luoyang Industrial Zone, Ruyang Province, East Ring Road, No. 3, No.

Patentee after: LUOYANG PENGFEI WEAR-RESISTANT MATERIALS LIMITED BY SHARE LTD.

Address before: 471013 Henan city in Luoyang Province town of Luolong District of Luoyang temple white hat Guo Village North Pengfei refractory wear-resistant materials Co.

Patentee before: Luoyang Pengfei Refractory and Wear Resistant Materials Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20090401

CX01 Expiry of patent term