CN201206424Y - Testing device for multifunction boring equipment - Google Patents

Testing device for multifunction boring equipment Download PDF

Info

Publication number
CN201206424Y
CN201206424Y CNU2008200806639U CN200820080663U CN201206424Y CN 201206424 Y CN201206424 Y CN 201206424Y CN U2008200806639 U CNU2008200806639 U CN U2008200806639U CN 200820080663 U CN200820080663 U CN 200820080663U CN 201206424 Y CN201206424 Y CN 201206424Y
Authority
CN
China
Prior art keywords
fixed
belt pulley
hydraulic speed
drilling equipment
test run
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200806639U
Other languages
Chinese (zh)
Inventor
王峰
罗军
杨大平
李炎伟
王文智
王部队
鲁运来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tuha Drilling Co of CNPC Western Drilling Engineering Co Ltd
Original Assignee
Tuha Drilling Co of CNPC Western Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tuha Drilling Co of CNPC Western Drilling Engineering Co Ltd filed Critical Tuha Drilling Co of CNPC Western Drilling Engineering Co Ltd
Priority to CNU2008200806639U priority Critical patent/CN201206424Y/en
Application granted granted Critical
Publication of CN201206424Y publication Critical patent/CN201206424Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices For Conveying Motion By Means Of Endless Flexible Members (AREA)

Abstract

The utility model relates to a multifunctional trial run device for drilling equipment, which is applied to trial run in repair services of oil drilling equipment. The multifunctional trial run device is characterized in that a diesel engine is fixed at one end of a base seat, and a power output shaft of the diesel engine is connected with a cardan shaft. The cardan shaft is connected with an input shaft of a hydraulic speed adjusting box, and the hydraulic speed adjusting box is fixed on the base seat. An air tube clutch is fixed on an output shaft of the hydraulic speed adjusting box. The other end of the air tube clutch is connected with the central shaft of bearing seats, and the bearing seats are fixed on the base seat. A chain wheel is fixed at the other end of the central shaft of the bearing seats. The other end of the chain wheel is fixed at the central shaft end of a belt pulley. The central shaft of the belt pulley is supported on the two bearing seats. The multifunctional trial run device has the advantages that the stepless speed adjustment of the chain wheel and the belt pulley can be realized through the hydraulic speed adjusting box, the chain wheel can drive a winch or a turn table to work, and the belt pulley can drive a drill pump or an interlocking machine to work, so that the requirements under various working conditions can be met. The structure of the device is compact, the trial run of a plurality of drilling equipment can be realized, and the working efficiency is high.

Description

Multi-functional drilling equipment test run device
Technical field
The utility model relates to the oil drilling technical field, the particularly test run device that uses of oil-well drilling equipment repairing trades, and specifically to chain drive winch, rotating disk, belt transmission borehole pump and gear carry out the device of test run.
Background technology
Oil and gas well drilling equipment majority is a main equipment, carries out test run after assembling is finished and debugging (test run) is a requisite important step repairing.Need the drilling equipment of test run and debugging that chain drive winch, rotating disk are arranged, belt transmission borehole pump and gear etc. are arranged.The mounting structure of each equipment, the content difference of different needs operation debugging.Every kind of equipment needs a cover test run device, the cost height, and structure is numerous and diverse.
The utility model content
The purpose of this utility model provides a kind of multi-functional drilling equipment test run device, can carry out test run to chain drive winch, rotating disk, borehole pump and gear respectively.Has multiple drilling equipment test run function.Overcome present test run equipment test run function singleness, every kind of equipment all needs the deficiency of a cover test run device.
The multi-functional drilling equipment test run of the utility model device is achieved in that
The multi-functional drilling equipment test run of the utility model device mainly is made up of diesel engine, universal drive shaft, hydraulic speed-regulating case, air clutch, bearing support, sprocket wheel, belt pulley and base.Diesel engine is fixed on an end of base, and the diesel powered output shaft is connected with universal drive shaft.Universal drive shaft connects hydraulic speed-regulating case power shaft, and the hydraulic speed-regulating case is fixed on the base.Be fixed with air clutch on the hydraulic speed-regulating case output shaft.The other end of air clutch is connected on the central axis of bearing support, and bearing support is fixed on the base.The other end of the central axis of bearing support is fixed with sprocket wheel.The other end of sprocket wheel is fixed on the center axle head of belt pulley.The central axis of belt pulley is supported on two bearing supports.
The center of hydraulic speed-regulating case, air clutch, bearing support, sprocket wheel and belt pulley is on same horizon.
For operating personnel's safety, around universal drive shaft, sprocket wheel and belt pulley, be fixed with the iron sheet guard shield.
The beneficial effects of the utility model: the multi-functional drilling equipment test run of the utility model device, Diesel Driven hydraulic speed-regulating case, stepless speed regulation by hydraulic speed-regulating case control sprocket wheel and belt pulley, can drive winch or rotating disk running by sprocket wheel, belt pulley can drive borehole pump or gear running, can drive a plurality of working machines and carry out test run, reach various working speeds, satisfy various operating mode demands.
The utility model middle belt pulley is installed in end, and when being convenient to sprocket wheel examination winch or rotating disk, pulley belt can be striden the terminal shaft bearing and be laid up dismounting, and when borehole pump or gear test run, the chain wheel drive chain disconnects easily.
Description of drawings
Accompanying drawing 1 is the overall structure schematic diagram of the multi-functional drilling equipment test run of the utility model device.
Accompanying drawing 2 is to utilize the utility model to carry out machine winch test run schematic diagram.
Accompanying drawing 3 is to utilize the utility model to carry out rotating disk test run schematic diagram.
Accompanying drawing 4 is to utilize the utility model to carry out borehole pump test run schematic diagram.
The specific embodiment
Embodiment 1: with a 12V diesel engine is that the multi-functional drilling equipment test run device of power is an example, and the utility model is described in further detail.
Consult Fig. 1.The multi-functional drilling equipment test run of the utility model device mainly is made up of diesel engine 1, universal drive shaft 3, hydraulic speed-regulating case 4, air clutch 5, bearing support 6, sprocket wheel 7, belt pulley 8 and base 9.Base 9 is to adopt i iron and channel-section steel to be welded into 360 millimeters of i iron height.Diesel engine 1 adopts 12V diesel engine, 1500 horsepowers of Maximum Power Outputs.
Diesel engine 1 is fixed on an end of base 9, and diesel engine 1 power output shaft is connected with a universal drive shaft 3.Universal drive shaft 3 other ends connect the power shaft of hydraulic speed-regulating case 4.Adopt bolt that hydraulic speed-regulating case 4 is fixed on the base 9.Be fixed with air clutch 5 on hydraulic speed-regulating case 4 output shafts.Air clutch 5 belongs to the oil drilling common equipment.The other end of air clutch 5 is connected on the central axis of bearing support 6, adopts bolt that bearing support 6 is fixed on the base 9.The other end of the central axis of bearing support 6 is fixed a sprocket wheel 7 that three row's sprockets are arranged.The other end of sprocket wheel 7 is fixed on the center axle head of belt pulley 8.The central axis of belt pulley 8 is supported on two bearing supports 6.Hydraulic speed-regulating case 4 and three bearing supports 6 have supported air clutch 5, sprocket wheel 7 and belt pulley 8.
The center of hydraulic speed-regulating case 4, air clutch 5, bearing support 6, sprocket wheel 7 and belt pulley 8 is on same horizon.
Around universal drive shaft 3, sprocket wheel 7 and belt pulley 8, be fixed with an iron sheet guard shield 2 respectively.
The utility model can carry out four kinds of test runs:
Winch test run: consult Fig. 2.Setting winch C1, the multi-functional drilling equipment test run of centering device sprocket wheel 7 and winch drive sprocket B1, jinny C1 connects driving chain A1 and winch gas circuit.Start diesel engine 1, can be by clutch 5 control sprocket wheel clutches, the rotating speed by hydraulic speed-regulating case 4 adjusting sprocket wheels 7 is worked winch C1 under multiple rotating speed, satisfy the various working condition requirements of winch C1.
Rotating disk test run: consult Fig. 3.Rotating disk C2 is installed, the multi-functional drilling equipment test run of centering device sprocket wheel 7 and rotating disk sprocket wheel B2, fixedly rotating disk B2 connects driving chain A2, and rotary drive chain lacks a row than winch, but can be connected on the sprocket wheel 7 too.Start diesel engine 1, can be by clutch 3 control sprocket wheel clutches, the rotating speed by hydraulic speed-regulating case 4 adjusting sprocket wheels 7 is worked turntable vehicle under multiple rotating speed, satisfy the various working condition requirements of rotating disk C2.
Borehole pump test run: consult Fig. 4.Borehole pump C3 is installed, and the multi-functional drilling equipment test run of centering device belt pulley 8 and borehole pump belt pulley B3 hang up driving belt A3, and fixedly borehole pump C3 connects cooling water pipeline and fluid end mud line (test run can replace mud with clear water).Start diesel engine 1, can be by clutch 5 control belt pulley clutches, the rotating speed by hydraulic speed-regulating case 4 adjusting belt pulleys 7 is worked borehole pump under multiple rotating speed, satisfy the various working condition requirements of borehole pump C3.
Gear test run: consult Fig. 4.Gear is installed, the multi-functional drilling equipment test run of centering device belt pulley 8 and gear belt pulley B3, fixedly gear is connected the gas circuit pipeline.Start diesel engine 1, can be by clutch 5 control belt pulley clutches, the rotating speed by hydraulic speed-regulating case 4 adjusting belt pulleys 7 is worked gear under multiple rotating speed, satisfy various working condition requirements.Gear test run structure and borehole pump test run structural similarity.
The utility model is repeatedly on probation at scene, West Tuha Drilling Co.,Ltd mechanical repair plant, and fitting operation is simple, uses easy to carryly, safe and reliable, has improved operating efficiency greatly, has reduced labour intensity.

Claims (3)

1, a kind of multi-functional drilling equipment test run device, mainly by diesel engine (1), universal drive shaft (3), hydraulic speed-regulating case (4), air clutch (5), bearing support (6), sprocket wheel (7), belt pulley (8) and base (9) are formed, it is characterized in that: diesel engine (1) is fixed on an end of base (9), diesel engine (1) power output shaft is connected with universal drive shaft (3), universal drive shaft (3) connects hydraulic speed-regulating case (4) power shaft, hydraulic speed-regulating case (4) is fixed on the base (9), be fixed with air clutch (5) on hydraulic speed-regulating case (4) output shaft, the other end of air clutch (5) is connected on the central axis of bearing support (6), bearing support (6) is fixed on the base (9), the other end of the central axis of bearing support (6) is fixed with sprocket wheel (7), the other end of sprocket wheel (7) is fixed on the center axle head of belt pulley (8), and the central axis of belt pulley (8) is supported on two bearing supports (6).
2, multi-functional drilling equipment test run device according to claim 1, it is characterized in that: the center of hydraulic speed-regulating case (4), air clutch (5), bearing support (6), sprocket wheel (7) and belt pulley (8) is on same horizon.
3, multi-functional drilling equipment test run device according to claim 1 is characterized in that: be fixed with iron sheet guard shield (2) around universal drive shaft (3), sprocket wheel (7) and belt pulley (8).
CNU2008200806639U 2008-05-15 2008-05-15 Testing device for multifunction boring equipment Expired - Fee Related CN201206424Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200806639U CN201206424Y (en) 2008-05-15 2008-05-15 Testing device for multifunction boring equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200806639U CN201206424Y (en) 2008-05-15 2008-05-15 Testing device for multifunction boring equipment

Publications (1)

Publication Number Publication Date
CN201206424Y true CN201206424Y (en) 2009-03-11

Family

ID=40465491

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200806639U Expired - Fee Related CN201206424Y (en) 2008-05-15 2008-05-15 Testing device for multifunction boring equipment

Country Status (1)

Country Link
CN (1) CN201206424Y (en)

Similar Documents

Publication Publication Date Title
CN203836034U (en) Conical bearing structure parallel-connected hydraulic retarder
CN208153704U (en) The main-gear box of large-scale open mill
CN102953676A (en) Drill power system
CN201206424Y (en) Testing device for multifunction boring equipment
CN201293083Y (en) Unfolding aheading speed reducer for hydraulic coupling
CN202296943U (en) Oil workover rig power-driven winch assembly
CN104930165A (en) Wind turbine gearbox and sun gear and planet carrier spline pair connection structure thereof
CN206020031U (en) A kind of coupling fluid-structure formula dynamic loading device
CN205087837U (en) Subside formula winch and carousel integration actuating mechanism
CN202955198U (en) Low-speed efficient energy-saving type single-stage centripetal turbine hydraulic torque converter
CN103058086A (en) Oil well repairing machine electricity-driven winch assembly
CN204061792U (en) A kind of dydraudynamic drive unit
CN203035072U (en) Power system of drilling machine
CN202133546U (en) Automobile transmission test apparatus based on enclosed power flow
CN201016291Y (en) Tower pumping unit
CN101240698B (en) Tower type pumping machine
CN214887358U (en) Pile driver working power device of highway guardrail breakdown van
CN201372719Y (en) Electric multifunctional trial run device for drilling equipment
CN102979877A (en) Energy-saving transmission device
CN201395781Y (en) Sweeper
CN2887953Y (en) Iron scale remover by using self transmission power of roller
CN202990845U (en) Drilling drive system
CN207144810U (en) Drilling machinery equipment testing device
CN202955197U (en) Low-speed efficient energy-saving double-turbine hydraulic torque converter
CN220153883U (en) Reliability test bed for automobile gearbox

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090311

Termination date: 20150515

EXPY Termination of patent right or utility model