Background technology:
Following dual mode is adopted in the collection of existing ground rainwater and discharging usually: the first, and storm drain is collected and discharging; The second, inlet for stom water is set and collects, again by be connected discharging with closed drain.When adopting first kind of mode, because storm drain is open-air the setting, silt and foreign material very easily enter in the storm drain, itself just need often cleaning to safeguard, when storm drain and hidden pipe access, all take to avoid silt and foreign material to enter the device of hidden pipe simultaneously, with regard to easier hidden pipe alluvial, obstruction, the impeded drainage of causing, impeded drainage can cause excess surface water to cause security incident simultaneously like this.
The utility model content:
The technical problems to be solved in the utility model is: provide a kind of silt and foreign material avoided to enter closed drain, reduce the storm drain of closed drain cleaning difficulty and the syndeton of closed drain, can overcome the deficiencies in the prior art.
The technical solution of the utility model: it comprises well chamber 1, storm drain 2 and closed drain 3, and the lower area in well chamber 1 is provided with sedimentation basin 4, and storm drain 2 and closed drain 3 are connected on the both sides sidewall of sedimentation basin 4.
Be provided with grid 5 at the place, hole that storm drain 2 is connected with sedimentation basin 4.
The position that is connected with storm drain 2 in sedimentation basin 4 is provided with current ramp 6.
The bottom of storm drain 2 is 0.5~0.9m to the distance of sedimentation basin 4 bottoms.
Closed drain 3 residing positions are than storm drain 2 low 0.1~0.3m.
Current ramp 6 is 20~45 ° with the angle of sedimentation basin 4 bottoms.
Be provided with manhole 7 at the top of well chamber 1, the sidewall in well chamber 1 is provided with cat ladder 8.
Compared with the prior art, the utility model is built a well chamber by the position that is connected with closed drain at storm drain, builds sedimentation basin in bottom, well chamber, so then can deposit sandstone and foreign material in the storm drain, obstruction sandstone, foreign material enter hidden pipe, guarantee that drainage system is unobstructed; Be provided with grid at the place, hole that storm drain is connected with sedimentation basin, being provided with of grid can stop that big, the lightweight foreign material of some volumes enter closed drain; The position that is connected with storm drain in sedimentation basin is provided with the current ramp, and the current ramp is designed to 20~45 °, can slow down the into following brunt energy of water like this, slows down into water to the stirring of silt sediment; The bottom of storm drain is 0.5~0.9m to the distance of sedimentation basin bottom, can guarantee the deposition effect of sedimentation basin like this; The residing position of closed drain is than the low 0.1~0.3m of storm drain, and such design is convenient to rainwater and is flowed into closed drain; Be provided with manhole at top, well chamber, be provided with cat ladder, can make things convenient for the staff to clear up sandstone and foreign material like this at sidewall.Simultaneously the utility model also has safe and reliable, economic and practical, easy construction, is convenient to advantage such as cleaning maintenance.
The specific embodiment:
Embodiment: as shown in Figure 1, it is to build a well chamber 1 at the connecting portion of storm drain 2 and closed drain 3, and storm drain 2 and closed drain 3 are connected on the both sides sidewall of lower area of well chamber 1.Simultaneously the lower area of well chamber 1 is done the leakproof water treatment, be made into a sedimentation basin 4; And at the top of well chamber 1 build manhole 7, the sidewall in well chamber 1 is provided with cat ladder 8, can make things convenient for the staff to clear up sandstone and foreign material like this; When building sedimentation basin 4, be the deposition effect of assurance sedimentation basin 4, and displacement, the bottom of storm drain 2 is 0.5~0.9m to the distance of sedimentation basin 4 bottoms, closed drain 3 residing positions are than storm drain 2 low 0.1~0.3m.At the place, hole that storm drain 2 is connected with sedimentation basin 4 grid 5 is installed, can be stopped that so big, the lightweight foreign material of some volumes enter closed drain; Current ramp 6 is built by laying at the position that is connected with storm drain 2 in sedimentation basin 4, and current ramp 6 is 20~45 ° with the angle of sedimentation basin 4 bottoms, can slow down the into following brunt energy of water like this, slows down into water to the stirring of silt sediment.