CN106759173B - A method for improving cold spring field with open ditch drainage in hidden pipes - Google Patents
A method for improving cold spring field with open ditch drainage in hidden pipes Download PDFInfo
- Publication number
- CN106759173B CN106759173B CN201611140254.9A CN201611140254A CN106759173B CN 106759173 B CN106759173 B CN 106759173B CN 201611140254 A CN201611140254 A CN 201611140254A CN 106759173 B CN106759173 B CN 106759173B
- Authority
- CN
- China
- Prior art keywords
- spring
- pipe
- field
- cold spring
- meters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B11/00—Drainage of soil, e.g. for agricultural purposes
- E02B11/005—Drainage conduits
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Agronomy & Crop Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
Technical field
The invention belongs to cold immersed field renovation technique field more particularly to a kind of sides in hidden pipe gutter drainage improvement cold spring field
Method.
Background technique
Cold immersed field is one of main low-yield land of In Middle And Lower Reaches of Changjiang River, improves and utilize always Chinese scholar and political affairs
The emphasis of mansion concern.Cold spring field is a main Types in cold immersed field, its main feature is that Tanaka has cold spring to emerge throughout the year, can not use one
As measure effectively improved.Paddy soil caused by cold spring field is discharged throughout the year is mashed, structure is destroyed, rice yield is low etc..
In history cold spring field administer main method be engineering measure, including dig trenches to drain the water away, light and shade ditch combine draining etc., due to by material
The limitation of material, pervious light and shade ditch combines or drainage system amount is big, and in the case where spring is more, drainage effect is unobvious;Or
Person is drained using plastic film capicitor, the material brittle, is unfavorable for using throughout the year, but replacement pipeline is troublesome and expense is high.In recent years
Carry out the above method through being abandoned.
Summary of the invention
The purpose of the present invention is to provide a kind of methods in hidden pipe gutter drainage improvement cold spring field, it is intended to solve cold spring Tian Zhi
The main method of reason is engineering measure, including dig trenches to drain the water away, light and shade ditch combine draining etc., due to being limited by material, in the past
Light and shade ditch combine or drainage system amount it is big, in the case where spring is more, drainage effect is unobvious;Or use plastics wave
The draining of line pipe, which is unfavorable for using throughout the year, but replaces that pipeline is troublesome and the high problem of expense.
The invention is realized in this way a kind of method in hidden pipe gutter drainage improvement cold spring field, the hidden pipe gutter drainage
The method for improveing cold spring field, this method can realize the multiple functions such as the draining of cold spring field, water storage, clear pipeline, can using this method
It realizes that primary investment uses for many years, and is able to achieve draining and water storage combines, concrete operations are as follows:
It is o'clock less as far as possible at a bend, most with spring step 1: clearly emit the point of spring, the i.e. position at spring
Short line mainly passes through the biggish spring of water yield, lesser spring is taken into account, to reduce trench digging workload;
Step 2: in the ∪ type trench that the lower side excavating depth of topography is 1m, two sides compacting;
Step 3: excavating an interim bright ditch along field face according to designed excavation route, discharge outlet digs 0.8 meter deeply,
0.6 meter deeply is dug in innermost spring one end, 0.3-0.4 meters of ditch bottom width, the mud scum on spring is unwatered only.It is concentrated emitting spring
Locate embedded hidden pipe;Hidden pipe is consistent with the route that spring is distributed;Bright ditch excavates on the most low-lying one side in cold immersed field, excavates two sides compacting
In ∪ type irrigation canals and ditches.
Step 4: 0.1-0.2 meters thick filtrate is laid in the interim bottom Ming Gou of excavation, mainly based on fine sand;Compacting,
Soft reinforcement water-permeable pipe is laid on filtrate, which exposes field face 0.3-0.5m (ventilative end) at innermost spring, in discharge outlet
Soft reinforcement water-permeable pipe is truncated in (0.3-0.5m) when close to ∪ type trench, puts on the identical pvc pipe of caliber, and pvc pipe head exposes bright
Ditch (discharge ends) is then being laid with 0.1-0.2 meters thick filtrate, and compacting backfills soil;It is close to pvc pipe surrounding in discharge outlet one end
Soil compaction.Step 5: tube head is blocked in the ventilative 1-2 layers of strainer in end, in case sundries enters blocking pipeline.
Step 6: being made into one large one small plug with cork, pvc pipe discharge ends are clogged, when needing to drain
Remove plug draining, extreme drought needs to block discharge ends when water storage;Discharge ends are opened when needing to clean pipeline, from ventilative end
A large amount of water is poured into, the sundries in pipeline can be washed away.
Further, excavating depth is the compacting of the two sides 1m in ∪ type irrigation canals and ditches.
Further, an interim bright ditch is excavated along field face according to different spring distribution situations, discharge outlet digs 0.8 meter deeply,
Ventilative end digs 0.6 meter deeply, 0.3-0.4 meters of ditch bottom width, the mud scum on spring is unwatered only.
Further, 0.1-0.2 meters thick filtrate is filled out above inbuilt pipeline, compacting backfills soil;It is close to discharge outlet one end
The soil compaction of pvc pipe surrounding.
Further, the hidden pipe is the soft reinforcement permeable channel for being embedded in the energy drainage ventilation inside soil.
Further, a hidden pipe is buried at each spring.
Further, spring is deep, and the processing of rubble stiffened is inserted at spring, formed one it is gradient gentle interim
Bright ditch pads one layer 0.1-0.2 meters thick filtrate in ditch bottom, is put into reinforcement flexible porous tube along interim bright ditch, ground is exposed in end of breathing freely
Face 0.4-0.5 meters, tube head is blocked with 1-2 layers of strainer;Hose discharge ends put on 1 meter long of same diameter pvc pipe, and pvc pipe head exposes bright
Ditch.Another object of the present invention is to provide a kind of cold spring fields of method using hidden pipe gutter drainage improvement cold spring field.
The method in hidden pipe gutter drainage improvement provided by the invention cold spring field, by the use of this method, it can be achieved that rice
Yield increases income.The present invention replaces plastic film capicitor to drain using flexible porous tube used in road engineering, can reduce trench digging
With the project amount of laying, and have easy cleaning, row store combine, the significant advantages such as flexible, and cost is relatively low.
Rice tillering number can be improved in pipe laying measure provided by the invention, and early tillering stage and tillering regularity are respectively increased 53%
With 9.3%, illustrate that pipe laying is affected to initial stage tiller, and effective tillering is always maintained at tillering regularity after initial stage tiller.
Influence of the pipe laying to rice yield and economical character
Method provided by the invention, after pipe laying 3 years, the effective fringe of rice, grain number per spike, bear fruit grains, theoretical yield and practical production
Amount all increases substantially, and wherein 55.7% and 10.7% is respectively increased in theoretical yield and actual production.
Detailed description of the invention
Fig. 1 is the method flow diagram in hidden pipe gutter drainage improvement provided in an embodiment of the present invention cold spring field.
Fig. 2 be it is provided in an embodiment of the present invention emitting at spring concentration bury hidden pipe structural schematic diagram.
Fig. 3 is the structural schematic diagram of hidden pipe provided in an embodiment of the present invention and spring distribution.
Fig. 4 is that hidden pipe structural schematic diagram is buried at spring provided in an embodiment of the present invention.
Fig. 5 is ∪ type trench architectures schematic diagram provided in an embodiment of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to
Limit the present invention.
Application principle of the invention is explained in detail with reference to the accompanying drawing.
As shown in Figure 1, the method in hidden pipe gutter drainage provided in an embodiment of the present invention improvement cold spring field the following steps are included:
S101: position and item number are rationally designed according to spring quantity, distribution situation and mobility in field;Emitting spring
Hidden pipe is buried at concentration;Hidden pipe is consistent with the route that spring is distributed;
S102: bright ditch excavates on the most low-lying one side in cold immersed field, and excavating depth is the compacting of the two sides 1m in ∪ type irrigation canals and ditches;
S103: first draining dry field, after so that the mud scum on field face surface layer is fallen dry consolidation, determines and excavates route, according to different springs
Distribution situation excavates an interim bright ditch along field face, and discharge outlet digs about 0.8 meter deeply, and about 0.6 meter deep, ditch bottom width is dug at end of breathing freely
0.3-0.4 meters, the mud scum on spring is unwatered only;
S104: pipeline checks again for entire pipeline after putting well, it is ensured that entire at least 0.4 meter of buried depth of pipeline, pipeline cannot go out
Existing fold.0.1-0.2 meters thick filtrate is filled out above pipeline again, compacting backfills soil.It is close to pvc pipe surrounding in discharge outlet one end
Soil must be tamped with preventing water leakage.
In an embodiment of the present invention:
Hidden pipe refers to the soft reinforcement permeable channel for the energy drainage ventilation being embedded in inside soil.
Bright ditch refers to the land drain that flowing water in hidden pipe is excavated, converged along field.
Cold spring field refers to that Tanaka emits the rice field that cold water, the soil moisture are low, natural drainage ability is poor, rice yield is low throughout the year,
It is more common in hills and rushes ridge or mountain area.
Soft reinforcement water-permeable pipe, the tubing meet building material industry standard " flexible porous tube " (JC 937-2004), i.e., should
Tubing should to make the spring steel wire coil of protective layer through preservative treatment and overcoating polyvinyl chloride (PVC) or other materials as skeleton,
The compound geotechnique's synthesis tubing of the one kind formed using permeability geotextile and polymer fiber braided fabric as tube wall lapping,
The tubing should be to have saturating (row) water effect, and is not broken because of geology, geographical temperature change, and it is clean to can reach discharge
The effect of water, does not cause secondary pollution to environment.Selection diameter is 10cm (i.e. FH100JC 937-2004) type tubing.
Hard polyvinyl chloride (PVC) pipe, the tubing should meet national standard " used in construction drainage hard polyvinyl chloride (PVC-U) pipe
Part " (GB/T5836.1-2006 or GB/T5836.2-2006), and caliber must be consistent with soft reinforcement water-permeable pipe caliber.
Strainer refer to there is wire or synthetic fibres to be made have different meshes, acidproof, alkaline-resisting, heatproof,
Wear-resisting mesh (should meet JB/T 10718-2007 or GB/T5330-2003) is placed in hidden pipe ventilation end, prevents outer
Carry out sundries entrance.
Filtrate is mainly the common materials such as fine sand, cavings.
Wooden plug, it is common wooden, it is processed with timber processing class tool, makes the stopper as both ends
The different cylindrical body of diameter, diameter at butt end 12-15cm, top diameter 8-9cm, length 20-25cm that is, can by microcephaly
Easily to fill in PVC drain pipe mouth.
Application principle of the invention is further described combined with specific embodiments below.
1 hidden pipe position and embedded density
Position and item number are rationally designed according to spring quantity, distribution situation and mobility in field.
1.1 springs are distributed in flakes and can move, and spring is gushed out by stone riprap layer or layer of sand, bury at spring concentration emitting
Hidden pipe, such as Fig. 2:
1.2 springs are at linear (straight line or broken line) distribution, and spring is by gushing out in rock fracture, and hidden pipe and spring are distributed
Route it is consistent, a pipe is across several springs, such as Fig. 3.
1.3 spring independent dispersions, position are fixed, and spring is gushed out from small solution cavity, then a hidden pipe is buried at each spring, such as
Fig. 4.
2 bright ditches
Bright ditch excavates on the most low-lying one side in cold immersed field, and excavating depth is in ∪ type irrigation canals and ditches (such as Fig. 5) for the compacting of the two sides 1m,
Utilize eligible existing drainage ditch.
3 trench diggings and pipe laying
Before excavating pipe laying ditch, dry field is first drained, after so that the mud scum on field face surface layer is fallen dry consolidation, determines and excavates route,
An interim bright ditch is excavated along field face according to different spring distribution situations, discharge outlet digging is about 0.8 meter deep, and end of breathing freely is dug deeply about
0.6 meter, 0.3-0.4 meters of ditch bottom width, the mud scum on spring is unwatered only, if spring is deep, rubble (goose is inserted at spring
Cobble) stiffened processing is carried out, the gentle interim bright ditch for having constant slope is eventually formed, pads one layer of 0.1- in ditch bottom
0.2 meter thick filtrate is put into reinforcement flexible porous tube along interim bright ditch, and ventilative end is basseted 0.4-0.5 meters, with 1-2 layers of strainer
Block tube head;Hose discharge ends put on 1 meter long of same diameter pvc pipe, and pvc pipe head exposes bright ditch.Pipeline checks again for whole after putting well
A pipeline, it is ensured that entire at least 0.4 meter of buried depth of pipeline, there can be no folds for pipeline.0.1-0.2 meters thick filter is filled out above pipeline again
Material, compacting backfill soil.The soil that pvc pipe surrounding is close in discharge outlet one end must be tamped with preventing water leakage.
4 draining controls
The discharge mouth of a river is equipped with wooden plug, does not block to discharge outlet usually, such as unusual drought weather, can use wooden plug
Son blocks discharge outlet, causes field face water shortage to prevent overdrainage.
5 Inspection and maintenances
From after hidden pipe landfill, drainage effect, pipeline, bright ditch compacting situation etc. are checked comprehensively.When inspection, open logical
Gas end strainer pours into the water with 20 liters or so at ventilation end, observes discharge ends water outlet status;Leak feelings are gone through to discharge ends
Condition, checks the bright furrow bank for being close to drain pipe port in time, and discovery leak is then handled by compacting.It, should be every after pipeline normal use
1-2 months are once checked, especially to check the penetrating situation of pipeline, silt situation up as found to have, can by largely pouring water and
When exclude.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (5)
1. a kind of method in hidden pipe gutter drainage improvement cold spring field, which is characterized in that the hidden pipe gutter drainage improves cold spring field
Method include:
Step 1: the point of spring, the i.e. position at spring are clearly emitted, it is main with spring for o'clock line least, shortest at a bend
To pass through the big spring of water yield, take into account small spring;
Step 2: in the ∪ type trench that the lower side excavating depth of topography is 1m, two sides compacting;
Step 3: excavating an interim bright ditch along field face according to designed excavation route, discharge outlet digs 0.8 meter deeply, most
Spring one end of the inside digs 0.6 meter deeply, 0.3-0.4 meters of ditch bottom width, the mud scum on spring is unwatered only;
Step 4: 0.1-0.2 meters thick filtrate is laid in the interim bottom Ming Gou of excavation, mainly based on fine sand;Compacting, in filtrate
Upper to be laid with soft reinforcement water-permeable pipe, soft reinforcement water-permeable pipe exposes 0.3-0.5 meters of field face at the innermost spring of ∪ type trench
As ventilative end, soft reinforcement water-permeable pipe is truncated when discharge outlet is close to ∪ type trench 0.3-0.5m, puts on the identical PVC of caliber
Pipe, pvc pipe head expose bright ditch, are then being laid with 0.1-0.2 meters thick filtrate, compacting backfills soil;It is close to PVC in discharge outlet one end
The soil compaction of pipe surrounding;
Step 5: tube head is blocked in the ventilative 1-2 layers of strainer in end, in case sundries enters blocking pipeline;
Step 6: being made into one large one small plug with cork, pvc pipe discharge ends are clogged, are removed when needing to drain
Plug draining, extreme drought need to block discharge ends when water storage;Discharge ends are opened when needing to clean pipeline, are poured into from ventilative end
A large amount of water can wash away the sundries in pipeline;
The method in hidden pipe gutter drainage improvement cold spring field is emitting embedded hidden pipe at spring concentration;The road of hidden pipe and spring distribution
Line is consistent;Bright ditch excavates on the most low-lying one side in cold immersed field, and excavate two sides compacting is in ∪ type irrigation canals and ditches;
An interim bright ditch is excavated along field face according to different spring distribution situations, discharge outlet digs 0.8 meter deeply, and end of breathing freely is dug deep
0.6 meter, 0.3-0.4 meters of ditch bottom width, the mud scum on spring is unwatered only;
0.1-0.2 meters thick filtrate is filled out above inbuilt pipeline, compacting backfills soil;It is close to pvc pipe surrounding in discharge outlet one end
Soil compaction.
2. the method in hidden pipe gutter drainage improvement as described in claim 1 cold spring field, which is characterized in that the hidden pipe is to be embedded in
The soft reinforcement permeable channel of energy drainage ventilation inside soil.
3. the method in hidden pipe gutter drainage improvement as described in claim 1 cold spring field, which is characterized in that each spring embedded one
Root hidden pipe.
4. the method in hidden pipe gutter drainage improvement as described in claim 1 cold spring field, which is characterized in that spring is deep,
The processing of rubble stiffened is inserted at spring, forms a gradient gentle interim bright ditch, pads one layer 0.1-0.2 meters in ditch bottom
Thick filtrate is put into reinforcement flexible porous tube along interim bright ditch, and ventilative end is basseted 0.4-0.5 meters, blocks pipe with 1-2 layers of strainer
Head;Hose discharge ends put on 1 meter long of same diameter pvc pipe, and pvc pipe head exposes bright ditch.
5. a kind of cold spring field of the method using the improvement of hidden pipe gutter drainage described in 4 any one of Claims 1 to 4 cold spring field.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611140254.9A CN106759173B (en) | 2016-12-12 | 2016-12-12 | A method for improving cold spring field with open ditch drainage in hidden pipes |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611140254.9A CN106759173B (en) | 2016-12-12 | 2016-12-12 | A method for improving cold spring field with open ditch drainage in hidden pipes |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106759173A CN106759173A (en) | 2017-05-31 |
| CN106759173B true CN106759173B (en) | 2019-02-22 |
Family
ID=58881050
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611140254.9A Expired - Fee Related CN106759173B (en) | 2016-12-12 | 2016-12-12 | A method for improving cold spring field with open ditch drainage in hidden pipes |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106759173B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111945684A (en) * | 2020-08-07 | 2020-11-17 | 邓姣 | Farmland hidden pipe drainage system |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS61179912A (en) * | 1985-02-04 | 1986-08-12 | Akiyama Kenji | Multiple pipe for civil engineering work |
| JPH11117274A (en) * | 1997-10-14 | 1999-04-27 | Masami Bando | Culvert drainage |
| CN201206276Y (en) * | 2008-05-21 | 2009-03-11 | 贵阳铝镁设计研究院 | Connecting structure of rainwater open trench and subsurface drain pipe |
| CN201898767U (en) * | 2010-06-22 | 2011-07-20 | 王鹏 | Infiltration irrigation facility with culvert for water storage |
| CN102612883A (en) * | 2012-04-19 | 2012-08-01 | 福建省景观园林建筑发展有限公司 | Saline discharge and alkali reduction concealed conduit device for saline-alkali soil |
-
2016
- 2016-12-12 CN CN201611140254.9A patent/CN106759173B/en not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS61179912A (en) * | 1985-02-04 | 1986-08-12 | Akiyama Kenji | Multiple pipe for civil engineering work |
| JPH11117274A (en) * | 1997-10-14 | 1999-04-27 | Masami Bando | Culvert drainage |
| CN201206276Y (en) * | 2008-05-21 | 2009-03-11 | 贵阳铝镁设计研究院 | Connecting structure of rainwater open trench and subsurface drain pipe |
| CN201898767U (en) * | 2010-06-22 | 2011-07-20 | 王鹏 | Infiltration irrigation facility with culvert for water storage |
| CN102612883A (en) * | 2012-04-19 | 2012-08-01 | 福建省景观园林建筑发展有限公司 | Saline discharge and alkali reduction concealed conduit device for saline-alkali soil |
Non-Patent Citations (1)
| Title |
|---|
| 暗管排水改造山区冷浸田的效果;陈士平等;《浙江农业科学》;20000430(第2期);第59-60页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106759173A (en) | 2017-05-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100473271C (en) | System engineering method for modifying alkaline land by use of pipe drainage method | |
| CN201943173U (en) | Sinking groove type permeable gutter inlet facility system | |
| CN104131575B (en) | A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation | |
| CN114718101B (en) | A seepage cut-off structure of a tailings pond with a seepage cut-off wall and a precipitation well and a construction method thereof | |
| CN104314090A (en) | Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof | |
| CN110904915A (en) | Reservoir engineering rock-soil body water permeation and seepage prevention design method | |
| CN106212224A (en) | A kind of ecological slope protection device for semiarid zone side slope | |
| CN107347481B (en) | Box catchment and earthing planting system and method for reclaiming open pit body by using same | |
| CN205454456U (en) | Alkali structure is arranged in strand area saline and alkaline land | |
| CN104234007B (en) | A kind of river saline-alkali soil levee slope greening method | |
| CN106613769A (en) | Underground pipe irrigation system and construction method thereof for sponge city | |
| CN205776502U (en) | Stop seawater invasion groundwater reservoir structure | |
| CN113981999A (en) | Rock mass side slope ecological restoration structure and method | |
| CN208346836U (en) | A kind of hidden drainage system | |
| CN111519582A (en) | Ecological bank protection monitoring system of city river course | |
| CN215057564U (en) | A visual and maintainable road tunnel anti-silting and blocking drainage system | |
| Barksdale et al. | Artificial recharge of productive ground-water aquifers in New Jersey | |
| JPH11229450A (en) | Water reservation method | |
| CN108781577B (en) | A nanocapillary-dark tube combined soil salt discharge method | |
| CN106120827A (en) | Freeze to make end water-bound and method inside a kind of sensitizing range, city tunneling foundation ditch | |
| CN205676753U (en) | A kind of novel ecological intercepting ditch | |
| CN106759173A (en) | A kind of method in hidden pipe gutter drainage improvement cold spring field | |
| CN104145673A (en) | Integrated green belt system based on flood drainage and water conservation and flood drainage and water conservation method | |
| CN112391993B (en) | Karez underground reservoir built in river reach of medium and small rivers and mountain areas | |
| CN108867542A (en) | A kind of tailings recycling water desilting system and its dredging method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190222 Termination date: 20201212 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |