The three composite rivet contact cold headers
Technical field
Utility model relates to a kind of cold headers, refers in particular to a kind of three composite rivet contact cold headers that manufactured copper covers silver and silver alloy three composite rivet contact that are used for.
Technical background
For saving rare precious metals (silver) resource, part had begun to adopt three composite rivet contact already with bank.At present, known three composite rivet type contact production technology is: be that the two compound cold headers of 30 types are produced two joint products by two composite rivet contact machines earlier, again by manually with silver and silver alloy flat sheet welded on the plane of rivet foot, finish the production of three composite rivet contact product.But there are 3 deficiencies in the preparation method that this copper covers silver and silver alloy three composite rivet contact: (1) artificial welding efficiency is low; (2) silver and silver alloy plain film adopt the sheet metal blanking moulding usually, and its lumber recovery is extremely low, have influenced the contact rate of finished products greatly; When (3) manually welding, the easy cross flow of scolder influences the contact electrical property of product to the working face of product.
The utility model content
For overcoming the above-mentioned defective that prior art exists, the utility model provides a kind of three composite rivet contact cold headers, and it can the disposable three composite rivet contact preparation work that copper covers silver and silver alloy, production efficiency and the stock utilization height finished automatically.
For achieving the above object, the technical solution adopted in the utility model is: a kind of three composite rivet contact cold headers, it comprises the two compound cold headers of 30 types, the two compound cold headers of this 30 type are mainly received box by slubbing mould pin, left-cut tool, quiet mould bases, left avertence core barrel, bed die, bed die pin, right avertence core barrel, right-cut tool, funnel, product collection and are constituted, in a side of bed die a newly-increased eccentric pipe and the newly-increased wire-sending device of a cover are set, make the S guide rail of the two compound cold headers of 30 types into three rank guide rails.
The utility model is by the improvement to the two compound cold headers of 30 types, realize that wherein one shears the process of two sections materials to cutting knife, wherein one cutter sheared two sections material, beat in the process in system, by adjusting the position of bed die pin, three sections material upsetting distortion in bed die, it is as follows to make the process of beating: right-cut tool is sheared the copper material, move to silver-colored line position, the silver line is sent into right-cut tool by newly-increased wire-sending device and is sheared, filamentary silver is sent into left-cut tool by newly-increased wire-sending device and is sheared, left-cut tool and right-cut tool move to the bed die center simultaneously and pause, three sections material left-cut tool and right-cut tool being sheared by slubbing mould pin head in the bed die hole, and jumping-up distortion in the bed die hole, left-cut tool, right-cut tool and slubbing mould pin are reset to initial position, it is contact foot desired location that the three compound charge bars that the bed die pin will be laminated with are delivered to the bed die front end, the upsetting of part material is shaped to the three composite rivet nose shape outside the bed die hole, at last, finish head part by the bed die pin, three composite contacts that moulding is finished eject bed die, fall into the product collection naturally through funnel and receive in the box.
The utility model utilizes the two compound cold headers of existing 30 types, and it is done necessary improvement, just can disposablely finish the three composite rivet contact preparation work that copper covers silver and silver alloy automatically.Three sections material upsetting distortion in bed die improve the bond strength that silver is covered in contact foot.The good effect of this method is: the production cycle of having improved stock utilization and shortening three composite contacts; The rate of finished products that drops into material reaches more than 80%, and production efficiency is at 3000/hour~5000/hour.
Description of drawings
Fig. 1 is structural representation of the present utility model (increasing an eccentric pipe and a cover wire-sending device on the right side of the two compound cold headers bed dies of 30 types).
Fig. 2 is structural representation of the present utility model (increasing an eccentric pipe and a cover wire-sending device in the left side of the two compound cold headers bed dies of 30 types).
Among the figure: 01. slubbing mould pin, 02. left-cut tool, 03. quiet mould bases, 04. left avertence core barrel, 05. filamentary silver, 06. bed die (hold mode), 07. bed die pin, 08. newly-increased wire-sending device, 09. silver medal line, 10. newly-increased eccentric pipe, 11. copper cash, 12 right avertence core barrels, 13. right-cut tools.
Embodiment
Below in conjunction with embodiment and accompanying drawing thereof the utility model is remake description.
Referring to Fig. 1 and Fig. 2, a kind of three composite rivet contact cold headers, it comprises the two compound cold headers of 30 types, the two compound cold headers of this 30 type are mainly received box by slubbing mould pin 01, left-cut tool 02, quiet mould bases 03, left avertence core barrel 04, bed die 06, bed die pin 07, right avertence core barrel 12, right-cut tool 13, funnel, product collection and are constituted, in a side of bed die 06 a newly-increased eccentric pipe 10 and the newly-increased wire-sending device 08 of a cover are set, make the S guide rail of the two compound cold headers of 30 types into three rank guide rails.
It is as follows to make the process of beating: right-cut tool 13 is sheared the copper material, move to silver-colored line 09 position, silver line 09 is sent into right-cut tool 13 by newly-increased wire-sending device 08 and is sheared, filamentary silver 05 is sent into left-cut tool 02 by newly-increased wire-sending device 08 and is sheared, left-cut tool 02 and right-cut tool 13 move to bed die 06 center simultaneously and pause, three sections material left-cut tool 02 and right-cut tool 13 being sheared by slubbing mould pin 01 head in bed die 06 hole, and jumping-up distortion in bed die 06 hole, left-cut tool 02, right-cut tool 13 and slubbing mould pin 01 are reset to initial position, it is contact foot desired location that the three compound charge bars that bed die pin 01 will be laminated with are delivered to bed die 06 front end, the upsetting of part material is shaped to the three composite rivet nose shape outside bed die 06 hole, at last, finish head part by bed die pin 07, three composite contacts that moulding is finished eject bed die 06, fall into the product collection naturally through funnel and receive in the box.
Referring to Fig. 1, after right-cut tool 13 is sheared copper material 11 length 3.2mm, move to silver-colored line 09 position, silver line 09 is sent into right-cut tool 13 sheared length 1.5mm by newly-increased wire-sending device 08, filamentary silver 05 is sent into left-cut tool 02 sheared length 1.8mm by newly-increased wire-sending device 08, left-cut tool 02 and right-cut tool 13 move to bed die 06 center simultaneously and pause, three sections material two cuttves being cut by slubbing mould pin 01 head in bed die 06 hole, and jumping-up distortion in bed die 06 hole, left-cut tool 02, right-cut tool 13 and slubbing mould pin 01 are reset to initial position, it is contact foot desired location that the three compound charge bars that bed die pin 07 will be laminated with are delivered to the bed die front end, the upsetting of part material is shaped to the three composite rivet nose shape outside bed die 06 hole, at last, finish head part, the AgSnO that moulding is finished by bed die pin 07
2/ Cu/AgSnO
2Three composite contacts eject bed die 06, fall into the product collection naturally through funnel and receive in the box.