CN201203133Y - Positive pressure steel ball ash-blowing system - Google Patents
Positive pressure steel ball ash-blowing system Download PDFInfo
- Publication number
- CN201203133Y CN201203133Y CNU2008200341932U CN200820034193U CN201203133Y CN 201203133 Y CN201203133 Y CN 201203133Y CN U2008200341932 U CNU2008200341932 U CN U2008200341932U CN 200820034193 U CN200820034193 U CN 200820034193U CN 201203133 Y CN201203133 Y CN 201203133Y
- Authority
- CN
- China
- Prior art keywords
- steel ball
- separator
- ball
- positive pressure
- compressed air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Incineration Of Waste (AREA)
Abstract
The utility model relates to a positive pressure steel ball soot blowing system for removing accumulated soot on the heating surface within the shaft flue at the tail part of the boiler. The collector is arranged above the furnace roof; one end of a connecting pipe is connected with the collector while the other end thereof is connected with a buffer; a diffuser is arranged on the lower part of the buffer; a soot hopper is disposed below the furnace body; a separator is connected below the soot hopper; the upper end of a damper is connected with the separator while the lower end thereof is connected with a ball accumulating hopper; a ball dropping gate is connected to the lower end of the ball accumulating hopper; a steel ball ejector is disposed below the ball dropping gate; one end of a ball lifting pipe is connected with the steel ball ejector while the other end thereof is connected with the collector; the steel ball ejector is provided with an ejector compressed air inlet; and the separator is provided with a separator compressed air inlet. The utility model has a simple, compact and reasonable structure; the positive pressure steel ball soot blowing system can save energy and can be run conveniently; the vulnerable parts are fewer; and the system does not tend to have running fault with less maintenance work.
Description
Technical field
The utility model relates to a kind of positive pressure steel ball gray-blowing system, specifically is used to remove the dust stratification on the boiler tail vertical well gas flue internal heating surface.
Background technology
In prior art, at present, steel ball gray-blowing system is contained in the steel ball in the Chu Zhudou, by the suction of steam air ejector, collects in the gatherer through supplying the pearl device and rising the pearl pipe.Be furnished with the blind window grid in the gatherer, gas enters atmosphere by exhaust tube; Steel ball enters little bucket through the top flapper, enters buffer again, drops at last on the semi-round ball of diffuser, sows on heating surface.Steel ball that deashing is later and ash enter ash bucket together, and most of thin ash is taken away by flue gas, and cinder and steel ball fall into separator; The formed air-flow of gas in the separator of bleeding is drawn cinder and is entered exhanst gas outlet by the flying dust fairlead, the steel ball of cleaning falls into Chu Zhudou through the bottom flapper, through for the pearl device with rises pearl and manage, so recycles again.
Original product adopts negative pressure system, adopts steam-sprayed air ejector, utilizes pressure to be generally 1.3MPa, temperature is that 260~320 ℃ of steam are the vapour source; Its parameter is than low many of the steam parameter of electricity generation boiler, so Boiler Steam could be used after need reducing pressure; Therefore can cause the waste energy.Adopt the negative pressure transportation steel ball, rely on steel ball deadweight ash disposal, effect is not so good.
Original product vapour injection formula air ejector is arranged on the furnace roof, link to each other with gatherer through exhaust tube, so the gatherer domestic demand is furnished with the blind window grid, to prevent that steel ball from entering air ejector and discharging; Flying dust fairlead on top flapper and little bucket, the separator also need be set in addition and have the twice gate for the pearl device.This kind system architecture complexity, easily worn part is more, in servicely breaks down easily, and maintenance capacity is big.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned weak point, thereby a kind of positive pressure steel ball gray-blowing system is provided, and the energy energy savings is easy to operate; Easily worn part is less, and in service being difficult for breaks down, and the operating maintenance amount is little.
Main solution of the present utility model is achieved in that
The utility model mainly adopts collector arrangements above furnace roof, and tube connector one end connects gatherer, and the other end is connected with buffer, and diffuser is installed in the buffer lower end; Ash bucket is arranged on the below of body of heater, and the ash bucket below connects separator; The adjustment doors upper end connects separator, and the lower end connects Chu Zhudou; The Zhu Men that falls is connected Chu Zhu bucket lower end; Feature is in the pearl student side that falls the steel ball injector to be set, and rises pearl Guan Yiduan and connects the steel ball injector, and the other end is connected with gatherer.
Described steel ball injector is provided with the injector compressed air inlet.Described separator is provided with the separator compressed air inlet.
Compared with the prior art the utility model has the following advantages:
The utility model is simple in structure, compact, reasonable; The energy energy savings, easy to operate; Easily worn part is less, and in service being difficult for breaks down, and the operating maintenance amount is little.
Description of drawings
Fig. 1 is the utility model structural representation.
The specific embodiment
Below in conjunction with accompanying drawing of the present utility model its enforcement is further described:
The utility model is mainly by gatherer 1, furnace roof 2, tube connector 3, buffer 4, diffuser 5, heating surface 6, ash bucket 7, separator 8, separator compressed air inlet 9, adjustment doors 10, Chu Zhu bucket 11, the pearl door 12 that falls, steel ball injector 13, injector compressed air inlet 14, exhanst gas outlet 15 and rises pearl and manage 16 etc. and form.
As shown in Figure 1, the utility model adopts gatherer 1 to be arranged in furnace roof 2 tops, and tube connector 3 one ends connect gatherer 1, and the other end is connected with buffer 4, and diffuser 5 is installed in buffer 4 lower ends; Ash bucket 7 is arranged on the below of body of heater, and ash bucket 7 lower ends connect separator 8, and separator 8 is provided with separator compressed air inlet 9; Adjustment doors 10 upper ends connect separator 8, and the lower end connects storage pearl bucket 11; The pearl door 12 that falls is connected Chu Zhu 11 lower ends of struggling against; In Luo Zhumen 12 lower ends steel ball injector 13 is set; On steel ball injector 13, be provided with injector compressed air inlet 14; Rise pearl and manage 16 1 ends connection steel ball injector 13, the other end is connected with gatherer 1; On body of heater, be provided with exhanst gas outlet 15.
Operation principle of the present utility model:
The utility model is by the steel ball that is contained in the Chu Zhu bucket 11, pearl door 12 enters steel ball injector 13 through falling, under the compressed-air actuated effect of injector compressed air inlet 14, enter and rise pearl pipe 16 and enter in the gatherer 1, enter buffer 4 through tube connector 3 then, under compressed-air actuated conveying, steel ball quickens to drop on the semi-round ball of diffuser 5 down, sows on heating surface 6 at last.Steel ball that deashing is later and ash enter ash bucket 7 together, and most of thin ash is taken away by flue gas, and cinder and steel ball fall into separator 8; Under the compressed-air actuated effect of separator compressed air inlet 9 cinder is separated with steel ball, cinder enters exhanst gas outlet 15, and the steel ball of cleaning falls into Chu Zhu bucket 11 through adjustment doors 10, enters steel ball injector 13 through the pearl door 12 that falls again, so recycles.
The utility model adopts the compressed air positive pressure system, adopts the venturi formula steel ball injector 13 that is arranged in pearl door 12 following aditus laryngis adjustable size, utilizes pressure to be about 0.5MPa compressed air delivery steel ball.And under compressed-air actuated conveying, steel ball quickens to drop on the semi-round ball of diffuser 5 down, sows on heating surface 6, reaches the purpose of removing dust stratification.
The utility model adopts positive pressure system, and the separator 8 of ash bucket 7 bottoms utilizes the compressed air of separator compressed air inlet 9 that cinder is separated with steel ball; Adjustment doors 10 below the separator 8 can allow steel ball fall, and prevents that simultaneously the compressed air of injector compressed air inlet 14 from bleeding.
The utility model course of work:
A, start-up routine
(1), carries out compressed air hydrophobic (should connect hydrophobic bypass on the pipeline) before blowing ash;
(2), open pearl door 12 and injector compressed air inlet 14 and begin to carry steel ball.
(3), open separator compressed air inlet 9 and begin to separate steel ball.
B closes closed procedure
(1), closes Luo Zhumen 12;
(2), close injector compressed air inlet 14;
(3), close separator compressed air inlet 9.
Claims (3)
1, a kind of positive pressure steel ball gray-blowing system adopts gatherer (1) to be arranged in furnace roof (2) top, and tube connector (3) one ends connect gatherer (1), and the other end is connected with buffer (4), and diffuser (5) is installed in buffer (4) lower end; Ash bucket (7) is arranged on the below of body of heater, and ash bucket (7) below connects separator (8); Adjustment doors (10) upper end connects separator (8), and the lower end connects Chu Zhudou (11); The Zhu Men (12) that falls is connected Chu Zhudou (11) lower end; It is characterized in that in Luo Zhumen (12) lower end steel ball injector (13) being set, rise pearl pipe (16) one ends and connect steel ball injector (13), the other end is connected with gatherer (1).
2, positive pressure steel ball gray-blowing system according to claim 1 is characterized in that described steel ball injector (13) is provided with injector compressed air inlet (14).
3, positive pressure steel ball gray-blowing system according to claim 1 is characterized in that described separator (8) is provided with separator compressed air inlet (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200341932U CN201203133Y (en) | 2008-04-17 | 2008-04-17 | Positive pressure steel ball ash-blowing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200341932U CN201203133Y (en) | 2008-04-17 | 2008-04-17 | Positive pressure steel ball ash-blowing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201203133Y true CN201203133Y (en) | 2009-03-04 |
Family
ID=40425446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200341932U Expired - Fee Related CN201203133Y (en) | 2008-04-17 | 2008-04-17 | Positive pressure steel ball ash-blowing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201203133Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102913929A (en) * | 2012-10-18 | 2013-02-06 | 清华大学 | Steel ball gas removal system of pulverized coal boiler |
CN103335318A (en) * | 2013-08-08 | 2013-10-02 | 中国人民解放军总后勤部建筑工程研究所 | Toilet sewage incineration device |
CN104456588B (en) * | 2014-10-22 | 2018-09-25 | 江苏太湖锅炉股份有限公司 | Steel ball sowing structure |
-
2008
- 2008-04-17 CN CNU2008200341932U patent/CN201203133Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102913929A (en) * | 2012-10-18 | 2013-02-06 | 清华大学 | Steel ball gas removal system of pulverized coal boiler |
CN103335318A (en) * | 2013-08-08 | 2013-10-02 | 中国人民解放军总后勤部建筑工程研究所 | Toilet sewage incineration device |
CN103335318B (en) * | 2013-08-08 | 2016-04-13 | 中国人民解放军总后勤部建筑工程研究所 | A kind of toilet sewage incineration device |
CN104456588B (en) * | 2014-10-22 | 2018-09-25 | 江苏太湖锅炉股份有限公司 | Steel ball sowing structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104073581A (en) | Process method and device for forcibly recovering diffused gas of blast furnace | |
CN201203133Y (en) | Positive pressure steel ball ash-blowing system | |
CN102345967A (en) | Multi-level impulse bagasse drying system | |
CN101251261A (en) | Positive pressure steel ball gray-blowing system | |
CN201470249U (en) | Bag type dust collector for preventing high temperature and open flame | |
CN205174413U (en) | Boiler smoke whirlwind separation recycle device | |
CN203923225U (en) | Force to reclaim the device of blast furnace out-spreading coal gas | |
CN202089599U (en) | Ash conveying system for economizer | |
CN206831819U (en) | The tasteless energy-saving high-efficiency environment-friendly boiler of smokeless and dust free | |
CN202575415U (en) | Blocking discharging pipeline of dust conveying pipe of electric precipitator | |
CN201840963U (en) | Smoke gas and dust collection and desulfurizing device of roasting bauxite rotary kiln | |
CN201394397Y (en) | Low pressure long bag-type dust collector | |
CN201862331U (en) | Low-pressure jet pulse bag type dust catcher | |
CN201231110Y (en) | Automatic ash-removing flat bag type dust collector | |
CN201196408Y (en) | Multifunctional automatic steam thermal energy recovery machine | |
CN202082939U (en) | Fly ash conveying mechanism of boiler economizer | |
CN208018303U (en) | A kind of modularization sinter-plate precipitator | |
CN216864211U (en) | Blast furnace damping down coal gas recovery system | |
CN201776038U (en) | Novel bag type dust collector for industrial high-temperature flue gas dust removal | |
CN201799193U (en) | Pre-dusting device used in biomass power plant | |
CN212841547U (en) | Combustion chamber structure of fluidized bed boiler | |
CN219943210U (en) | High material level quick ash discharging device for electric precipitation | |
CN213631659U (en) | Formaldehyde production line tail gas buffering transmission device | |
CN216203305U (en) | Low-temperature methanol washing tail gas recycling system | |
CN203389442U (en) | Ceramic multi-cyclone dust collector with automatic dust discharging function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090304 Termination date: 20150417 |
|
EXPY | Termination of patent right or utility model |