CN201201714Y - Ship stern tube structure - Google Patents

Ship stern tube structure Download PDF

Info

Publication number
CN201201714Y
CN201201714Y CNU2008200868349U CN200820086834U CN201201714Y CN 201201714 Y CN201201714 Y CN 201201714Y CN U2008200868349 U CNU2008200868349 U CN U2008200868349U CN 200820086834 U CN200820086834 U CN 200820086834U CN 201201714 Y CN201201714 Y CN 201201714Y
Authority
CN
China
Prior art keywords
stern
tube shaft
stern tube
pipe
shaft base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200868349U
Other languages
Chinese (zh)
Inventor
楼卫增
柳向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGFAN GROUP CO Ltd
Original Assignee
YANGFAN GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGFAN GROUP CO Ltd filed Critical YANGFAN GROUP CO Ltd
Priority to CNU2008200868349U priority Critical patent/CN201201714Y/en
Application granted granted Critical
Publication of CN201201714Y publication Critical patent/CN201201714Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Standing Axle, Rod, Or Tube Structures Coupled By Welding, Adhesion, Or Deposition (AREA)

Abstract

The utility model provides a ship stern tube structure, which comprises a front and rear stern shaft seats (5,3) for mounting a stern shaft (2), a sealed cooling water cabin (4) between the front and rear stern shaft seats, and a stern tube (8) sleeved outside the stern shaft, wherein the front and rear ends of the stern tube are respectively connected with the front and rear stern shaft seats via flanges, the outer wall of the stern tube between the front and rear stern shaft seats exposes to the inside of the cooling water cabin, and the front and rear ends of the stern tube are in sealed joint with the front and rear stern shaft seats via epoxy resin and sealant. The utility model breaks the convention of covering a stern tube with an outer casing pipe, saves the outer casing pipe, and enables the stern tube to directly contact with the cooling water in the cooling water cabin. When the stern shaft rotates at high speed, the liquid coolant between the stern tube and the stern shaft plays an important role of cooling, while the cooling water in the stern tube cooling water cabin cools the liquid coolant and plays a helping role. When the outer wall of the stern tube directly contact with the cooling water, cooling of the cooling water to the liquid coolant can be speeded up.

Description

Boats and ships stern tubular construction
Technical field the utility model relates to a kind of stern tubular construction of boats and ships stern tubular construction, especially large ship, belongs to the technical field of structures of the propulsion system of boats and ships in the transportation.
The marine shafting stern tubular construction that background technology is traditional mainly is made up of stern tube shaft, stern pipe, stern pipe outer tube, stern tube shaft front and rear bushings, oil filling device, stern cooling water tank, front and back stern tube shaft base, floor etc.Before and after particularly being weldingly fixed between the stern tube shaft base, be enclosed within the stern pipe outer tube of stern tube outside, it is considered to be used for increasing the intensity of stern pipe assembly, and protection stern tube shaft, stern pipe institute are indispensable.But find that in actual use the stern guard system sends temperature alarm sometimes.The major cause analysis is, stern tube shaft is in the high speed revolution process, the heat that stern tube shaft and stern tube shaft front and rear bushings cliding friction produce, a part is taken away by the cooling and lubricating circulating system, some then is dispersed into the stern tube outside by the stern pipe, and a stern pipe outer tube has been overlapped in the stern tube outside, make and form an enclosed cavity between stern tube outer surface and the stern pipe outer tube inside face, although stern pipe outer tube outside face has cooling media, but because of this enclosed cavity internal memory has air, it is a bad conductor, so cold and hot exchange effect is relatively poor, has caused the cooling performance of stern tubular construction not good enough.Will send temperature alarm if meet reasons such as stern tube shaft high speed rotating overlong time or coolant temperature uprise a little, untimely elimination, then will cause axle is the badly damaged of propulsion system, or has reduced service life.
Summary of the invention is at above deficiency, and the utility model is exactly the boats and ships stern tubular construction that will improve cooling performance under the prerequisite that guarantees stern pipe intensity.
Boats and ships stern tubular construction of the present utility model has the front and back stern tube shaft seat that stern tube shaft is used is installed, and a leak free cooling water tank is arranged between the stern tube shaft seat of front and back; Have one to be enclosed within the outer stern pipe of stern tube shaft, stern pipe rear and front end connects with front and back stern tube shaft base by flange, wherein is fixedly connected with back stern tube shaft base, with preceding scalable connection of stern tube shaft base; The neck flange of stern pipe rear and front end flange is connected as former and later two linings of plain bearing and stern tube shaft; The refrigerant fluid interlayer is arranged, and the oil filling pipe of stern tube shaft rear end is arranged in this refrigerant fluid interlayer between stern pipe and stern tube shaft; The outer wall of described stern pipe between the stern tube shaft seat of front and back is exposed in the cooling cabin, is tightly connected by epoxy resin and sealant between stern pipe front and back end and the front and back stern tube shaft base.
Boats and ships stern tubular construction of the present utility model overcomes old opinion that stern pipe that prior art thinks also needs to overlap a stern pipe outer tube, has cancelled this stern pipe outer tube, make the stern pipe directly and the interior cooling cooling water expansion tank of cooling cabin contact.When the stern tube shaft high speed rotating, play main cooling effect by the refrigerant fluid between stern pipe and the stern tube shaft, and rise the cooling effect of refrigerant fluid and the cooling effect of assisting with the cooling water expansion tank in the stern pipe cooling water tank.When stern pipe outer wall directly contacts with cooling water expansion tank, just quickened the cooling of cooling water expansion tank to refrigerant fluid.
In addition, in the prior art as the front and back stern tube shaft seat that supports the stern pipe simultaneously, they not only with hull on the floor welding fixing, and need respectively with the tight welding in the two ends of stern pipe outer tube to play an effect of isolating cooling water expansion tank and axle system.In order to reach requirements for qualitys such as welding deformation is little, welding stress is little, the wall thickness of stern tube shaft seat and stern pipe outer tube joint is should gap little, so the stern tube shaft base has a bigger wall thickness change at this place.This not only makes casting process, the metalworking process complications of stern tube shaft base, and the installation of stern pipe unit is made troubles, and welding quality also is difficult to guarantee.After having cancelled stern pipe outer tube, the wall thickness change of said stern tube shaft seat does not just need, and this has not only saved material, the processing of stern pipe outer tube itself, the consumption of installation, also saved to the stern tube shaft base because of required casting, the processing of installation stern pipe outer tube.The utility model stern tubular construction provides a kind of and can guarantee stern tube shaft system normal operation in a word, and have that technology is simple, easy construction, effective, axle system that simultaneously can the saving in material cost-cutting.
Boats and ships stern tubular construction of the present utility model, be lined with epoxy resin between the neck outer wall of stern pipe front and back end and institute's flange connecting and the front and back stern tube shaft base axis hole, before having an epoxy resin layer back-up ring to be installed in fastener, preceding stern tube shaft base front side on the stern tube shaft base, also have a seal ring to be subjected to the back-up ring compressing in the gap between neck flange and the preceding stern tube shaft base axis hole to guarantee leak tightness.
Boats and ships stern tubular construction of the present utility model has a sealing member between the axis hole of one side of front and back stern tube shaft base sensing cooling cabin and the stern pipe front and back end outer wall.
Boats and ships stern tubular construction of the present utility model, front and back stern tube shaft base length is separately crossed over the twice floor with fixing with the welding of twice floor respectively, improved and originally needed the design that a partial floor fixes the stern tube shaft seat, make that (partial floor i.e. floor between two floors because of welding processing difficulties that partial floor caused is eliminated, because of the hypotelorism between partial floor and the floor, relatively more difficult when causing welding, and may influence welding quality), further simplify the installation of stern tube shaft system.
Description of drawings Fig. 1 is the structural representation of the utility model one embodiment, among the figure: 1-screw propeller, 2-stern tube shaft, stern tube shaft base behind the 3-, 4-stern pipe cooling water tank, stern tube shaft base before the 5-, 6-floor, 8-stern pipe;
Fig. 2 is an I regional enlarged drawing among Fig. 1, among the figure: 2-stern tube shaft, 4-stern pipe cooling water tank, stern tube shaft base before the 5-, 6-floor, 7-refrigerant fluid interlayer, 8-stern pipe, 9-epoxy resin, 10-forward flange neck, the 11-front lining, 12-stern pipe forward flange, 13-epoxy resin back-up ring, 14-O type circle, the 15-oil leab, the 16-sealing member.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described.
Boats and ships stern guard system among the embodiment as shown in Figure 1, 2, the stern tube shaft 2 screw propeller 1 being installed and being connected main frame is arranged, be enclosed within the outer stern pipe 8 of stern tube shaft, be welded on the stern pipe rear flange of stern pipe rear end, the stern pipe forward flange 12 that is threaded, the stern tube shaft front lining 11 of flange and stern tube shaft back bush before and after stern tube shaft is installed in, the preceding stern tube shaft base 5 that the stern pipe is installed on by rear flange and epoxy resin and back stern tube shaft base 3, front and back stern tube shaft base is installed in compositions such as floor 6 on the hull and cooling, lubricating system.
Wherein the hull of back stern tube shaft base and boats and ships stern installation screw propeller part is the consubstantiality casting, cross over boats and ships 7#, 8#, 9#, 10#, 11#, 12#, 13#, 14# totally 8 floors between the stern tube shaft base of front and back, the center-to-center distance between every adjacent two floors is uniform to be 600cm.Preceding stern tube shaft base and 13#, the axial quadrature welding of 14# floor are fixed, and back stern tube shaft base and 8#, the axial quadrature welding of 9# floor are fixed.Form a container, splendid attire cooling water expansion tank in it with the floor extension and with the sealing of front and back stern tube shaft seat between 7# floor and the 14# floor.
Rear flange all is welded with neck flange and flange, forward flange directly connects with flange by screw thread and forms, stern pipe front/rear end docks welding with the neck flange end face, rear flange is fixed on the stern tube shaft seat of back with firm with flange, and the flange 12 of forward flange is fastenedly connected with the axle envelope that is installed on the stern tube shaft.Be equipped with in the forward flange neck 10 in front lining, the rear flange neck back bush is installed, stern tube shaft is connected with flange with back bush through front lining, and neck flange and lining free-running fit play the plain bearing effect.Between stern tube shaft and the stern pipe refrigerant fluid interlayer 7 is arranged, in the refrigerant fluid interlayer refrigerant fluid is arranged, this refrigerant fluid is actual to be lubricating oil.The lubricating oil of stern tube shaft rear end is carried backward with the outer oil filling device of oil leab 15 the past stern tube shaft seat of being paved in the refrigerant fluid interlayer, and the lubricating oil in the refrigerant fluid interlayer is also by this pipeline and outside exchange cycles.
Interval between the neck flange outer wall of front and back flange and the shaft hole inner wall of front and back stern tube shaft seat, with the epoxy resin layer filling, turn back and be pressed on the stern tube shaft seat of back as back-up ring with flange in back epoxy resin layer rear end, preceding epoxy resin layer 9 front ends have a packing retaining ring 13 outward through an O type circle 14 block.A sealing member 16 fillings in addition between the axis hole that points to cooling cabin one side at front and back stern tube shaft base and the stern pipe.These some measures will seal between stern pipe and the stern tube shaft base, make in the cooling cabin cooling water expansion tank not can with outboard break-through in axle system even the cabin.

Claims (5)

1, a kind of boats and ships stern tubular construction has the front and back stern tube shaft seat that stern tube shaft is used is installed, and a leak free cooling water tank is arranged between the stern tube shaft seat of front and back; Have one to be enclosed within the outer stern pipe of stern tube shaft, stern pipe rear and front end connects with front and back stern tube shaft base by flange, wherein is fixedly connected with back stern tube shaft base, with preceding scalable connection of stern tube shaft base; The neck flange of stern pipe rear and front end flange is connected as former and later two linings of plain bearing and stern tube shaft; The refrigerant fluid interlayer is arranged, and the oil filling pipe of stern tube shaft rear end is arranged in this refrigerant fluid interlayer between stern pipe and stern tube shaft; It is characterized in that the outer wall of described stern pipe between the stern tube shaft seat of front and back is exposed in the cooling cabin, is tightly connected between stern pipe front and back end and the front and back stern tube shaft base.
2, boats and ships stern tubular construction as claimed in claim 1, it is characterized in that being lined with epoxy resin between the neck outer wall of stern pipe front and back end and institute's flange connecting and the front and back stern tube shaft base axis hole, before having an epoxy resin layer back-up ring to be installed in fastener, preceding stern tube shaft base front side on the stern tube shaft base, also have a seal ring oppressed by back-up ring in the gap between neck flange and the preceding stern tube shaft base axis hole.
3, boats and ships stern tubular construction as claimed in claim 1 or 2 is characterized in that boats and ships stern tubular construction, between the axis hole of a side of front and back stern tube shaft base sensing cooling cabin and the stern pipe front and back end outer wall sealing member is arranged.
4, boats and ships stern tubular construction as claimed in claim 1 or 2, stern tube shaft base length is separately crossed over the twice floor with fixing with the welding of twice floor respectively before and after it is characterized in that.
5, boats and ships stern tubular construction as claimed in claim 3, stern tube shaft base length is separately crossed over the twice floor with fixing with the welding of twice floor respectively before and after it is characterized in that.
CNU2008200868349U 2008-05-15 2008-05-15 Ship stern tube structure Expired - Fee Related CN201201714Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200868349U CN201201714Y (en) 2008-05-15 2008-05-15 Ship stern tube structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200868349U CN201201714Y (en) 2008-05-15 2008-05-15 Ship stern tube structure

Publications (1)

Publication Number Publication Date
CN201201714Y true CN201201714Y (en) 2009-03-04

Family

ID=40424023

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200868349U Expired - Fee Related CN201201714Y (en) 2008-05-15 2008-05-15 Ship stern tube structure

Country Status (1)

Country Link
CN (1) CN201201714Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102069903A (en) * 2009-11-23 2011-05-25 船宝工业株式会社 Stern tube bush unit
CN104085523A (en) * 2014-07-08 2014-10-08 中国船舶工业集团公司七〇八研究所 Ship tail bearing and tail pipe water lubrication device
CN105710830A (en) * 2016-01-28 2016-06-29 青岛昊运船艇制造有限公司 Positioning installation method of ship bearing sleeve
CN108657409A (en) * 2018-03-27 2018-10-16 广船国际有限公司 Sealing element and stern tube shaft component, ship comprising it
WO2022095198A1 (en) * 2020-11-06 2022-05-12 江龙船艇科技股份有限公司 Dual-purpose device for preventing shaft system thordon from deforming and cooling
CN115503927A (en) * 2022-09-23 2022-12-23 广州船舶及海洋工程设计研究院(中国船舶工业集团公司第六0五研究院) Stern shaft device and ship

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102069903A (en) * 2009-11-23 2011-05-25 船宝工业株式会社 Stern tube bush unit
CN104085523A (en) * 2014-07-08 2014-10-08 中国船舶工业集团公司七〇八研究所 Ship tail bearing and tail pipe water lubrication device
CN104085523B (en) * 2014-07-08 2017-05-03 中国船舶工业集团公司七〇八研究所 Ship tail bearing and tail pipe water lubrication device
CN105710830A (en) * 2016-01-28 2016-06-29 青岛昊运船艇制造有限公司 Positioning installation method of ship bearing sleeve
CN105710830B (en) * 2016-01-28 2017-10-10 青岛昊运船艇制造有限公司 The locating mounting method of ships and light boats bearing sleeve
CN108657409A (en) * 2018-03-27 2018-10-16 广船国际有限公司 Sealing element and stern tube shaft component, ship comprising it
WO2022095198A1 (en) * 2020-11-06 2022-05-12 江龙船艇科技股份有限公司 Dual-purpose device for preventing shaft system thordon from deforming and cooling
CN115503927A (en) * 2022-09-23 2022-12-23 广州船舶及海洋工程设计研究院(中国船舶工业集团公司第六0五研究院) Stern shaft device and ship

Similar Documents

Publication Publication Date Title
CN201201714Y (en) Ship stern tube structure
CN104002954B (en) Vessel tail shaft device
CN101992837B (en) Risk early-warning method of marine propulsion shafting
CN107269839A (en) A kind of stern tube bearing water lubrication sealing structure
CN102927388A (en) Low-temperature swivel joint
CN104085523A (en) Ship tail bearing and tail pipe water lubrication device
CN1821602A (en) High performance water lubricating mechanical driving system
CN112193396A (en) Aluminum alloy hull exhaust pipe cabin penetrating structure
US5310372A (en) Through hull assemblies for marine drives
CN206889665U (en) A kind of stern tube bearing water lubrication sealing structure
CN204056279U (en) Screw shaft of ship device
US3209720A (en) Vessel stern gear systems
CN204459166U (en) Naval vessel stern tube shaft water lubrication face seals
CN210852869U (en) Shafting sealing mechanism for ship propeller
CN102730178A (en) Electric propulsion system of large self-propelling semi-submersible transport ship
CN209430766U (en) A kind of miniature self-service ship driving shafting grease seal leak-proof device
CN108443617B (en) Rotary joint device for liquid delivery
CN213443057U (en) Aluminum alloy hull exhaust pipe cabin penetrating structure
CN207195656U (en) Rubber antelabium friction pair type stern shaft seal gland
CN100582639C (en) Anti-corrosion spacer ring type flange of plate type heat exchanger
CN111661181A (en) Screw rod crawler adjusting device with lubricating and corrosion-resistant structure
CN215830787U (en) Water retaining ring of circulating water pump
JP2504929Y2 (en) Counter-rotating propeller shaft seal device
CN221004321U (en) Integral type anticorrosion heat preservation pipe support
CN210978872U (en) Plastic pad for sealing automobile pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhejiang Yangfan Group Co., Ltd.

Assignor: Yangfan Group Co., Ltd.

Contract fulfillment period: 2009.4.5 to 2015.4.4

Contract record no.: 2009330002504

Denomination of utility model: Ship stern tube structure

Granted publication date: 20090304

License type: Exclusive license

Record date: 20091016

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.4.5 TO 2015.4.4; CHANGE OF CONTRACT

Name of requester: ZHEJIANG EAST-COAST SHIPYARD CO., LTD.

Effective date: 20091016

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090304

Termination date: 20130515