CN201199330Y - Integration flux automatic control device - Google Patents

Integration flux automatic control device Download PDF

Info

Publication number
CN201199330Y
CN201199330Y CNU2007201745816U CN200720174581U CN201199330Y CN 201199330 Y CN201199330 Y CN 201199330Y CN U2007201745816 U CNU2007201745816 U CN U2007201745816U CN 200720174581 U CN200720174581 U CN 200720174581U CN 201199330 Y CN201199330 Y CN 201199330Y
Authority
CN
China
Prior art keywords
flow
intelligent
control valve
flow control
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201745816U
Other languages
Chinese (zh)
Inventor
李波
张立弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUMA INSTRUMENT Co Ltd ZHEJIANG PROV
Original Assignee
FUMA INSTRUMENT Co Ltd ZHEJIANG PROV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUMA INSTRUMENT Co Ltd ZHEJIANG PROV filed Critical FUMA INSTRUMENT Co Ltd ZHEJIANG PROV
Priority to CNU2007201745816U priority Critical patent/CN201199330Y/en
Application granted granted Critical
Publication of CN201199330Y publication Critical patent/CN201199330Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Flow Control (AREA)

Abstract

The utility model relates to an integrative flow automatic control device which can automatically control flow. The control device comprises an intelligent flowmeter (10), an electric flow control valve (20) and an integrative shell (30). The intelligent flowmeter (10) and the electric flow control valve (20) are arranged at the upper stream and the lower stream of the flow channel of the integrative shell (30) to form an integrative structure. A cable conductor is connected between the intelligent flowmeter (10) and the electric flow control valve (20). A flow value is first set to the intelligent flowmeter (10), the liquid goes through the intelligent flowmeter when in work, the intelligent flowmeter converses flow signals measured into a flow value, compares the flow value with the preset flow value and outputs control signals according to difference value; the electric flow control valve regulates the opening degree of a valve according to the control signals so as to cause the flow to be always close to the preset value, thus achieving the purpose of automatic flow control.

Description

The integral flux automaton
Technical field
The utility model relates to the fluid quantitative of industries uses such as a kind of oil, chemical industry, food and supplies with the flow automatic control device that uses in the flow process.
Background technology
Need in the commercial production at present generally all to adopt the manual control valve in the quantitative technological process of controlling or all adopt flowmeter, steady arm, topworks, flow control valve to be combined into an automation control system and finish.But the low real-time of the former manually-operated efficient is poor, and latter's plurality of devices combination not only investment is big, and gives engineering design, buying, installation, debugs and bring very burden.
Summary of the invention
The utility model purpose provides and a kind ofly can accumulate the integral flux automaton of total amount again according to setting the flow value automatic control flow.
The utility model is achieved in that it is made up of intelligent flow meter (10), electric flow control valve (20) and integrated housing (30).There is the signal cable connecting line to be connected between intelligent flow meter (10) and the electric flow control valve (20).Intelligent flow meter (10) comprises flow sensor (11) and intelligent integrating controller (12).Electric flow control valve (20) comprises motor (21), reducing gear (22) and flow control device (23), and there is joint flange (31) at integrated housing (30) two ends, and there is runner (32) centre.
Intelligent flow meter (10) and electric flow control valve (20) are located at integrated housing intermediate flow channel (32) upstream and downstream, when fluid is flowed through flow sensor (11) in runner during work (32), flow sensor (11) records flow signal and is defeated by intelligent integrating controller (12), intelligence integrating controller (12) is through intelligent computing, being scaled flow value shows and adds up, flow value with this flow value and setting compares simultaneously, then according to difference output control signal, motor on the electric flow control valve (21) is received instruction and is made the rotating action, drive flow control device (23) controlling opening of valve Control Flow size then through the reducing gear deceleration, make actual flow all the time near setting value, reach the purpose of intelligent Control Flow.
The utility model investment minor structure compactness, intuitive display, simple to operate, resolution is high, installation and maintenance are convenient, are adapted at applying in the weight feed flow process in the commercial production.
Description of drawings
Accompanying drawing 1 is the utility model horizontal configuration synoptic diagram
Accompanying drawing 2 is the utility model angie type structures
The utility model is described in further detail below in conjunction with accompanying drawing
Embodiment
As shown in Figure 1 and Figure 2, the utility model is made up of intelligent flow meter (10), electric flow control valve (20), integrated housing (30).There is cable to be connected between intelligent flow meter (10) and the electric flow control valve (20), intelligent flow meter (10) is made up of flow sensor (11) and intelligent integrating controller (12), and electric flow control valve (20) is made up of motor (21), reducing gear (22), flow control device (23).Intelligent flow meter (10), electric flow control valve (20) are separately positioned on the upstream and downstream of integrated housing (30) intermediate flow channel (32), and integrated housing (30) two ends have flange respectively.

Claims (4)

1. integral flux automaton, form by intelligent flow meter (10), electric flow control valve (20), integrated housing (30), it is characterized in that: intelligent flow meter (10), electric flow control valve (20) are separately positioned on integrated housing (30) fluid passage (32) upstream and downstream, have signal cable to connect between intelligent flow meter (10), the electric flow control valve (20).
2. integral flux automaton as claimed in claim 1 is characterized in that: intelligent flow meter is formed by connecting up and down by flow sensor and intelligent integrating controller, and intelligent integrating controller has intelligent integrating, adding up shows and the flow value set-up function.
3. integral flux automaton as claimed in claim 1 is characterized in that: electric flow control valve is assembled in proper order by motor, reducing gear, flow control device, and electric flow control valve can be that valve rod lift or cock are rotary.
4. integral flux automaton as claimed in claim 1 is characterized in that: flow direction can be level or right-angle type.
CNU2007201745816U 2007-09-06 2007-09-06 Integration flux automatic control device Expired - Fee Related CN201199330Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201745816U CN201199330Y (en) 2007-09-06 2007-09-06 Integration flux automatic control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201745816U CN201199330Y (en) 2007-09-06 2007-09-06 Integration flux automatic control device

Publications (1)

Publication Number Publication Date
CN201199330Y true CN201199330Y (en) 2009-02-25

Family

ID=40450483

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201745816U Expired - Fee Related CN201199330Y (en) 2007-09-06 2007-09-06 Integration flux automatic control device

Country Status (1)

Country Link
CN (1) CN201199330Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102117078A (en) * 2010-12-29 2011-07-06 中冶美利纸业股份有限公司 Device for automatically monitoring calcium carbonate flow
CN102415454A (en) * 2011-12-12 2012-04-18 长沙湘丰茶叶机械制造有限公司 Automatic flow control device and method
CN106286964A (en) * 2016-08-25 2017-01-04 武汉圣禹排水系统有限公司 A kind of drainage pipeline flow control methods and device
CN106610671A (en) * 2015-11-09 2017-05-03 江苏润仪仪表有限公司 Intelligent high precision flow control system
CN111468054A (en) * 2020-04-16 2020-07-31 南京西浦储能技术研究院有限公司 Unsaturated organic matter circulating hydrogenation energy storage device and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102117078A (en) * 2010-12-29 2011-07-06 中冶美利纸业股份有限公司 Device for automatically monitoring calcium carbonate flow
CN102415454A (en) * 2011-12-12 2012-04-18 长沙湘丰茶叶机械制造有限公司 Automatic flow control device and method
CN106610671A (en) * 2015-11-09 2017-05-03 江苏润仪仪表有限公司 Intelligent high precision flow control system
CN106286964A (en) * 2016-08-25 2017-01-04 武汉圣禹排水系统有限公司 A kind of drainage pipeline flow control methods and device
CN111468054A (en) * 2020-04-16 2020-07-31 南京西浦储能技术研究院有限公司 Unsaturated organic matter circulating hydrogenation energy storage device and method

Similar Documents

Publication Publication Date Title
CN201199330Y (en) Integration flux automatic control device
CN201340548Y (en) Bypass circulation reflux electric adjusting device
CN104069969A (en) Double-component gluing equipment
CN203630649U (en) Gas flow or pressure adjustment device
CN205064262U (en) Screw pump oil gas is defeated auxiliary system thoughtlessly
CN110743464A (en) AB glue automatic mixing device and control system and control method thereof
CN203285409U (en) Unattended polymer-injection station and injection-allocation station control system of oil field
CN213574564U (en) Novel fluid pump remote monitoring system
CN202580178U (en) Intelligent pressure-difference regulating balance valve with LCD (liquid crystal display)
CN200999734Y (en) Device pump
CN210261168U (en) Potassium permanganate adding device controlled by PLC
CN212151744U (en) Automatic regulator for generator inner cooling water
CN205650071U (en) Automatically regulated adds ammonia system based on pH value
CN206726031U (en) A kind of Measurement and Control System of water chemical treatment turbine flowmeter
CN106522304B (en) Gravity flow pressure regulating difference water supply system
CN111437742A (en) Automatic adjusting method for closed-loop gas proportioning cabinet
CN207486116U (en) A kind of pressure balance simply installed
CN207513811U (en) A kind of hydraulic pump of adjustable pressure
CN215729332U (en) Liquid level-flow cascade PID control system
CN201485406U (en) Adjusting device of water injection volume during polymerization process of polychloroethylene
CN203297841U (en) Corrosion-resistant high-pressure high-output automatic pressure reducer
CN107940065A (en) A kind of Automated water pump control valve
CN203552077U (en) Flow regulation device used for chemical engineering reaction kettle
CN1274399C (en) Intelligent curative proportioning device
CN203035967U (en) Intelligent flow controller

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Effective date of registration: 20091111

Pledge (preservation): Pledge

PE01 Entry into force of the registration of the contract for pledge of patent right

Effective date of registration: 20091111

Pledge (preservation): Pledge

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20120711

Granted publication date: 20090225

Pledgee: Bank of Wenzhou Limited by Share Ltd Ouhai branch

Pledgor: Fuma Instrument Co., Ltd., Zhejiang Prov.

Registration number: 2009330000639

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Integration flux automatic control device

Effective date of registration: 20120711

Granted publication date: 20090225

Pledgee: Bank of Wenzhou Limited by Share Ltd Ouhai branch

Pledgor: Fuma Instrument Co., Ltd., Zhejiang Prov.

Registration number: 2012990000363

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20140421

Granted publication date: 20090225

Pledgee: Bank of Wenzhou Limited by Share Ltd Ouhai branch

Pledgor: Fuma Instrument Co., Ltd., Zhejiang Prov.

Registration number: 2012990000363

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090225

Termination date: 20130906