CN201198560Y - Device for controlling and correcting bridge contact net basic pre-embedded bolt space - Google Patents
Device for controlling and correcting bridge contact net basic pre-embedded bolt space Download PDFInfo
- Publication number
- CN201198560Y CN201198560Y CNU2008200290682U CN200820029068U CN201198560Y CN 201198560 Y CN201198560 Y CN 201198560Y CN U2008200290682 U CNU2008200290682 U CN U2008200290682U CN 200820029068 U CN200820029068 U CN 200820029068U CN 201198560 Y CN201198560 Y CN 201198560Y
- Authority
- CN
- China
- Prior art keywords
- steel plate
- bolt
- contact net
- steel
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a concrete embedded work-piece, in particular relates to a bridge contact net foundation pre-buried bolt distance control correction device, which comprises a steel plate, and is characterized in that the steel plate is at least provided with two rows of five or more bolt steel bushings; both end parts of the steel plate are connected with a hanging ring; the depth that the bolt steel bushing is embedded into the steel plate is half to two thirds of the thickness of the steel plate; then the bolt steel bushing is welded to the steel plate; the inner diameter of the bolt steel bushing and the steel plate form a through hole. The device has the advantages that the structure is simple, the cost is low, the time and the labor power are saved, and the pre-buried precision of the bolt can satisfy the requirements of the designed allowed error. In the construction of a large-sized bridge of a railway passenger transportation special line, the qualification rate of the contact net foundation pre-buried bolt when the control tool is not adopted is only 30 percent, but after the control correction device is adopted, the qualification rate of the contact net foundation pre-buried bolt is 100 percent, and the power is improved by three times or more; the device can be widely used in the concrete construction of the pre-buried bolt in the building and the bridge industries.
Description
Technical field
The utility model relates to concrete embedded engineering, is specifically related to pre-embedded bolt spacing control of a kind of bridge contact net basis and means for correcting.
Background technology
Existing home and abroad all takes much count of for the interface engineering of special line for passenger trains, the quality of interface workmanship, directly determine the quality of special line for passenger trains engineering, the precision allowable error of Passenger dedicated railway Bridge contact net basis pre-embedded bolt only has only ± 1mm, for example the Taiwan high ferro is exactly to postpone operation because the quality of interface engineering causes, and bridge contact net basis is pre-buried to be one of interface engineering.In concrete during pre-embedded bolt, if deviation is arranged slightly, can cause installation period to prolong or do over again, there are human and material resources and waste of time, can say that carcase work should reach the precision of machine-building, as its difficulty of civil engineering construction is very big, does not all have mature technique to use for reference both at home and abroad.
Summary of the invention
The purpose of this utility model provides a kind of simple in structure, and cost is low, and is time saving and energy saving, and the precision of its pre-embedded bolt can satisfy pre-embedded bolt spacing control of a kind of bridge contact net basis and the means for correcting that the design allowable error requires.
In order to overcome the pre-buried common quality defect in bridge contact net basis that prior art causes, the technical solution of the utility model is to solve like this: comprise a block plate, special character of the present utility model is to be connected with at least on the steel plate bolting steel sleeve of two rows more than three, the steel plate both ends connect handle, described bolting steel sleeve is embedded in the steel plate hole and welds, and its bolting steel sleeve diameter and steel plate hole are connected to through hole.
It is 1/2~2/3 of steel plate thickness that described bolting steel sleeve step embeds the steel plate degree of depth.
The utility model compared with prior art, have simple in structure, cost is low, time saving and energy saving, the precision of its pre-embedded bolt can satisfy the characteristics that the design allowable error requires, in certain special line for passenger trains grand bridge construction, the qualification rate that does not adopt contact net basis pre-embedded bolt before the control tool only 30%, the qualification rate 100% of contact net basis pre-embedded bolt behind the employing control tool, effect improves more than 3 times, extensively is used in the concrete construction of building and bridge industry pre-embedded bolt.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is I-I cross sectional view of Fig. 1;
Fig. 3 is II-II cross sectional view of Fig. 1;
Fig. 4 is steel plate processing plane figure.
The specific embodiment
Accompanying drawing is embodiment of the present utility model.
Below in conjunction with accompanying drawing summary of the invention is described further:
Referring to figs. 1 through shown in Figure 3, pre-embedded bolt spacing control of a kind of bridge contact net basis and means for correcting, comprise a block plate 1, at least be connected with the bolting steel sleeve 2 of two rows more than three on its steel plate 1, steel plate 1 both ends connect handle 3, described bolting steel sleeve 2 is embedded in steel plate 1 mesopore and welds, and it is 1/2~2/3 of steel plate thickness that bolting steel sleeve step embeds the steel plate degree of depth, and its bolting steel sleeve 2 internal diameters and steel plate 1 hole are connected to through hole.
Shown in Figure 4, at first on steel plate 1, bore the hole that needs pre-embedded bolt quantity by designing requirement, be drilled with two rows in the accompanying drawing 4 of the present utility model and amount to 10 holes.Each hole washes out and the corresponding hole with the level of the diameter of pre-embedded bolt by numerically controlled lathe, and the diameter in its hole and the diameter of pre-embedded bolt can carry out tight fit and get final product.
In sum, the new using method of this practicality is summarized as follows:
1, determines the quantity and the position of bridge engineering contact net basis built-in fitting;
2, will need pre-buried bolt to be inserted in the sleeve 2 of this device;
3, weld on the pre-embedded steel slab of design according to pre-buried bolt one end that is inserted in the sleeve 2,, after welding is finished, manually device is promoted out by handle 3 with the pre-buried bolt position of sleeve 2 controls;
4, will weld good pre-embedded bolt and be placed into bridge design embedded foundation position, with the accurate setting-out of total powerstation, correction.The reinforcing bar welding is fixed in the pre-embedded bolt of the positive good position of high-ranking officers and the bridge, then branching standing template, fluid concrete.Because in the process of fluid concrete, concrete needs vibration, might change the exact position of position, pre-embedded bolt hole, this moment is not when concrete also reaches setting and hardening, again this device is nested in the pre-embedded bolt, until treating that concrete reaches setting and hardening, after having certain intensity, lifting device for the second time, at this moment installing relative pre-embedded bolt has been a hole bit correction effect, by twice lifting of this device, thereby has guaranteed the accurate location of pre-embedded bolt, and accelerated construction speed, workmanship also adheres to specification.
Claims (2)
1. a bridge contact net basis pre-embedded bolt spacing is controlled and means for correcting, comprise a block plate (1), it is characterized in that being connected with at least on the steel plate (1) the bolting steel sleeve (2) of two rows more than three, steel plate (1) both ends connect handle (3), described bolting steel sleeve (2) is embedded in steel plate (1) hole and welds, and its bolting steel sleeve (2) internal diameter and steel plate hole are connected to through hole.
2. according to basis pre-embedded bolt spacing control of the described bridge contact net of claim 1 and means for correcting, it is characterized in that it is 1/2~2/3 of steel plate thickness that described bolting steel sleeve (2) step embeds the steel plate degree of depth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200290682U CN201198560Y (en) | 2008-05-09 | 2008-05-09 | Device for controlling and correcting bridge contact net basic pre-embedded bolt space |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200290682U CN201198560Y (en) | 2008-05-09 | 2008-05-09 | Device for controlling and correcting bridge contact net basic pre-embedded bolt space |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201198560Y true CN201198560Y (en) | 2009-02-25 |
Family
ID=40449718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200290682U Expired - Fee Related CN201198560Y (en) | 2008-05-09 | 2008-05-09 | Device for controlling and correcting bridge contact net basic pre-embedded bolt space |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201198560Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104846749A (en) * | 2015-06-06 | 2015-08-19 | 中铁三局集团有限公司 | Anchor bolt hole support for pier caps |
CN107780342A (en) * | 2017-10-16 | 2018-03-09 | 中铁十局集团第五工程有限公司 | A kind of construction method of contact net bolt embedded part fixing device |
CN112077530A (en) * | 2019-06-12 | 2020-12-15 | 中国商用飞机有限责任公司 | Method for correcting bolt hole dislocation in bolt connecting assembly |
-
2008
- 2008-05-09 CN CNU2008200290682U patent/CN201198560Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104846749A (en) * | 2015-06-06 | 2015-08-19 | 中铁三局集团有限公司 | Anchor bolt hole support for pier caps |
CN104846749B (en) * | 2015-06-06 | 2016-05-11 | 中铁三局集团有限公司 | Pier cap anchor hole support |
CN107780342A (en) * | 2017-10-16 | 2018-03-09 | 中铁十局集团第五工程有限公司 | A kind of construction method of contact net bolt embedded part fixing device |
CN112077530A (en) * | 2019-06-12 | 2020-12-15 | 中国商用飞机有限责任公司 | Method for correcting bolt hole dislocation in bolt connecting assembly |
CN112077530B (en) * | 2019-06-12 | 2021-11-05 | 中国商用飞机有限责任公司 | Method for correcting bolt hole dislocation in bolt connecting assembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105887702A (en) | Method for reinforcing concrete beam by prestressed carbon fiber plate and steel-concrete | |
CN201198560Y (en) | Device for controlling and correcting bridge contact net basic pre-embedded bolt space | |
CN208965714U (en) | A kind of prefabricated piping lane main frame structure of assembly concrete | |
CN202701851U (en) | Angle iron boring mold with adjustable edge distance | |
CN201486579U (en) | Drilling anchor rod hole positioning device | |
CN203426241U (en) | Coreless punching equipment | |
CN101839030A (en) | Novel building assembled wall body and construction method | |
CN105728634A (en) | Novel one-time forging forming process and equipment for prestressed multi-hole anchorage device | |
CN206352340U (en) | Connecting node between precast concrete column and pedestal | |
CN205393443U (en) | Forging forming equipment of porous ground tackle of prestressing force | |
CN206815542U (en) | A kind of portable bracket pre-embedded bolt fixed structure | |
CN204199323U (en) | For the positioning screw hole mould of pre-embedded bolt quick position | |
CN205343431U (en) | Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar | |
CN212053813U (en) | Prefabricated wall body split bolt hole built-in fitting | |
CN204492000U (en) | A kind of separate type prefabricated reinforced concrete bracket column | |
CN210659317U (en) | Steel bar cushion block placing tool | |
CN107419710B (en) | Pre-burying process of tunnel lining concrete grouting pipe | |
CN102720353A (en) | Post-construction one-side shear wall formwork for settlement joint of tower and construction method | |
CN111734151A (en) | Foundation bolt direct-buried installation positioning device and construction method | |
CN201460211U (en) | Water-heating preformed hole mould | |
CN203475821U (en) | Steel formwork used for construction of wall bodies on two sides of deformation joint | |
CN216999374U (en) | Quick connector for concrete embedded pull rod | |
CN205421985U (en) | Building wall pillar structure | |
CN211058300U (en) | Locking device of hydraulic creeping formwork | |
CN205834301U (en) | Tool structure for Three-dimensional numerical control driller processing multi-layer sheet boring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090225 Termination date: 20170509 |