CN201195940Y - Integral lifting template for elevator shaft - Google Patents

Integral lifting template for elevator shaft Download PDF

Info

Publication number
CN201195940Y
CN201195940Y CNU2008200354260U CN200820035426U CN201195940Y CN 201195940 Y CN201195940 Y CN 201195940Y CN U2008200354260 U CNU2008200354260 U CN U2008200354260U CN 200820035426 U CN200820035426 U CN 200820035426U CN 201195940 Y CN201195940 Y CN 201195940Y
Authority
CN
China
Prior art keywords
template
adjusting screw
elevator shaft
lifting
internal thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200354260U
Other languages
Chinese (zh)
Inventor
孟向惠
鞠林群
秦春华
刘美英
蒋存根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengtai Group Co Ltd
Original Assignee
Zhengtai Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengtai Group Co Ltd filed Critical Zhengtai Group Co Ltd
Priority to CNU2008200354260U priority Critical patent/CN201195940Y/en
Application granted granted Critical
Publication of CN201195940Y publication Critical patent/CN201195940Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The integral lifting template for the elevator shaft comprises two vertical frames with the same size, and an upper layer and a lower layer of the integral lifting template are respectively arranged. Eight rod ends of the well-shaped frame are hollow pipe fittings, and the end parts of the hollow pipe fittings are fixed with plugs. The center of the plug head is provided with an internal thread hole. The adjusting screw is matched with the internal thread hole, and a connecting plate is fixed outside the adjusting screw. Holes are formed in the connecting plate, the connecting plate is connected with the vertical enclosing purlin through screws, and the vertical enclosing purlin is connected with the inner side of the combined template of the vertical shaft structure. The adjusting screw is used for adjusting the position of the combined template. In order to meet the requirement of adjusting the position of the combined template, an angle template is arranged at the intersection angle of the template. A lifting rope is connected to the center of the derrick, and the lifting of the integral lifting template is controlled by a lifter. The utility model discloses an effective effect is, uses the utility model discloses an elevator shaft whole lifting formwork, workman intensity of labour is little, and the efficiency of construction is high, and construction quality also obtains guaranteeing.

Description

The elevator shaft integral hoisting template
Affiliated technical field
The utility model relates to the elevator shaft integral hoisting template that building operations is used.
Background technology
During the elevator shaft building operations, each hoistway wall respectively mounting template construct, treat concrete setting after, stripping is reinstalled template in a high aspect again and is constructed.Its weak point is: labor strength is big, and efficiency of construction is low, and construction quality can not get guaranteeing.
The utility model content
The purpose of this utility model is to provide the elevator shaft integral hoisting template in order to overcome above-mentioned weak point, and labor strength is little, the efficiency of construction height, and construction quality also is guaranteed.
The technical scheme that its technical problem that solves the utility model adopts is: the well cabinet frame of two identical sizes is arranged, split the upper and lower of integral hoisting template, two well cabinet frames are connected with connecting rod.Eight rod ends at the well cabinet frame are hollow pipe fittings, and the end of hollow pipe fitting is fixed with chock plug.There is internal thread hole at center at chock plug.What match with internal thread hole is adjusting screw(rod), and the external stability of adjusting screw(rod) has junction plate.Porose on the junction plate, with screw with junction plate with vertically enclose purlin and be connected, the gang form inboard of vertically enclosing purlin and shaft structure links together.Adjusting screw(rod) is in order to regulate the position of gang form.In order to adapt to the needs of regulating the gang form position, angle mould is housed at the angle of cut place of template.Center at the well cabinet frame connects a lifting rope, with the lifting of hoister control integral hoisting template.
Effective effect of the present utility model is, uses elevator shaft integral hoisting template of the present utility model, and labor strength is little, the efficiency of construction height, and construction quality also is guaranteed.
Description of drawings
Fig. 1 is the structural representation of elevator shaft integral hoisting template of the present utility model.1-borehole wall among the figure, 2-gang form, 3-vertically enclose purlin, 4-junction plate, 5-screw, 6-adjusting screw(rod), 7-well cabinet frame, 8-chock plug, 9-assembly jack panel, 10-connecting rod.
Fig. 2 is A-A sectional view of Fig. 1.2-gang form among the figure, 3-vertically enclose purlin, 6-adjusting screw(rod), 7-well cabinet frame, 11--angle mould.
The specific embodiment
The well cabinet frame (7) that two identical sizes are arranged splits the upper and lower of integral hoisting template, and two well cabinet frames (7) are connected with connecting rod (10).Eight rod ends at well cabinet frame (7) are hollow pipe fittings, and the end of hollow pipe fitting is fixed with chock plug (8).There is internal thread hole at center at chock plug (8).What match with internal thread hole is adjusting screw(rod) (6), and the external stability of adjusting screw(rod) (6) has junction plate (4).It is porose that junction plate (4) is gone up, with screw (5) with junction plate (4) with vertically enclose purlin (3) and be connected, gang form (2) inboard of vertically enclosing purlin (3) and shaft structure links together.Adjusting screw(rod) (6) is in order to regulate the position of gang form (2).In order to adapt to the needs of regulating gang form (2) position, angle mould (11) is housed at the angle of cut place of template.Center at well cabinet frame (7) connects a lifting rope, with the lifting of hoister control integral hoisting template.

Claims (2)

1. elevator shaft integral hoisting template, it is characterized in that: the well cabinet frame that two identical sizes are arranged, split the upper and lower of integral hoisting template, eight rod ends at the well cabinet frame are hollow pipe fittings, the end of hollow pipe fitting is fixed with chock plug, there is internal thread hole at center at chock plug, what match with internal thread hole is adjusting screw(rod), the external stability of adjusting screw(rod) has junction plate, porose on the junction plate, with screw with junction plate with vertically enclose purlin and be connected, the gang form inboard of vertically enclosing purlin and shaft structure links together.
2. elevator shaft integral hoisting template according to claim 1 is characterized in that: angle mould is equipped with at the angle of cut place in template.
CNU2008200354260U 2008-05-13 2008-05-13 Integral lifting template for elevator shaft Expired - Fee Related CN201195940Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200354260U CN201195940Y (en) 2008-05-13 2008-05-13 Integral lifting template for elevator shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200354260U CN201195940Y (en) 2008-05-13 2008-05-13 Integral lifting template for elevator shaft

Publications (1)

Publication Number Publication Date
CN201195940Y true CN201195940Y (en) 2009-02-18

Family

ID=40415577

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200354260U Expired - Fee Related CN201195940Y (en) 2008-05-13 2008-05-13 Integral lifting template for elevator shaft

Country Status (1)

Country Link
CN (1) CN201195940Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015706A (en) * 2012-11-08 2013-04-03 广西建工集团第五建筑工程有限责任公司 System for lifting elevator shaft mold and construction method for cast-in-place wall of elevator shaft
CN102232047B (en) * 2008-12-18 2016-04-20 托马电梯有限责任公司 For the well body of lift facility
CN105507580A (en) * 2016-01-27 2016-04-20 山东方圆建筑材料有限公司 Integral lifting type formwork device for an elevator shaft
CN111877749A (en) * 2020-08-01 2020-11-03 河北建设集团股份有限公司 Integral lifting type elevator shaft template and elevator shaft template supporting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102232047B (en) * 2008-12-18 2016-04-20 托马电梯有限责任公司 For the well body of lift facility
CN103015706A (en) * 2012-11-08 2013-04-03 广西建工集团第五建筑工程有限责任公司 System for lifting elevator shaft mold and construction method for cast-in-place wall of elevator shaft
CN103015706B (en) * 2012-11-08 2015-04-22 广西建工集团第五建筑工程有限责任公司 System for lifting elevator shaft mold and construction method for cast-in-place wall of elevator shaft
CN105507580A (en) * 2016-01-27 2016-04-20 山东方圆建筑材料有限公司 Integral lifting type formwork device for an elevator shaft
CN111877749A (en) * 2020-08-01 2020-11-03 河北建设集团股份有限公司 Integral lifting type elevator shaft template and elevator shaft template supporting method

Similar Documents

Publication Publication Date Title
CN104314304B (en) The comprehensive formwork system of varus is climbed outside aluminium in a kind of outer steel
CN202081640U (en) Lifting formwork used for building of elevator shaft
CN201195940Y (en) Integral lifting template for elevator shaft
CN211306246U (en) Lifting platform
CN201162349Y (en) Tension rod tapered joint head of steel form plate
CN201095866Y (en) Elevator barrel formwork
CN213683346U (en) Temporary supporting device for mounting large-span steel beam
CN202369299U (en) Tower crane over-distance wall attaching device
CN210858229U (en) Assembled precast concrete enclosure
CN203257091U (en) Beam column joint concrete forming die
CN101225709A (en) Adjustable corbel system
CN206458090U (en) A kind of balcony, tool for kitchen use hang mould
CN201158938Y (en) Adjustable corbel out system
CN210361810U (en) Extrusion die for concrete partition board
CN217299728U (en) Assembled building construction platform
CN202452977U (en) Door and window plumb
CN203795853U (en) Template supporting upright stanchion
CN205419584U (en) Be used for soft wall frame that adheres to of tower crane
CN205061356U (en) Panel hoisting device
CN204010911U (en) Dry-type transformer indoor type shell boom hoisting
CN201865338U (en) Cement casting template
CN203271122U (en) Attached template lifting frame
CN221799178U (en) Building templates support frame
CN221798804U (en) Assembled building shear wall assembly connection structure
CN203783111U (en) Lifting frame for structural steelscaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090218

Termination date: 20170513